ILO Meeting 26 Ongoing and forthcoming Procurement activities

  • Slides: 15
Download presentation
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September 2014 - San

ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September 2014 - San Sebastian F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 1

Reminder: MIG/BI Group F 4 E Market Intelligence group - ILO Meeting #26 –

Reminder: MIG/BI Group F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 2

Magnets (PF Coils) Awarded: • Winding tooling {OPE-463]: signed with Sea. Alp consortium on

Magnets (PF Coils) Awarded: • Winding tooling {OPE-463]: signed with Sea. Alp consortium on 8 th of May On-going: • Impregnation & Additional tooling [OPE 559] Under evaluation: • Site & Infrastructure Management [OPE 568] Under preparation: • Manufacturing and cold test [OPE-570](CFT 11/2014) • Cold test engineering study and facility construction [OPE-585]-cf market survey F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 3

In Vessel Divertor Under evaluation: • OMF-567: 3 rd Tungsten IVT prototype (deadline 17/06):

In Vessel Divertor Under evaluation: • OMF-567: 3 rd Tungsten IVT prototype (deadline 17/06): start of the dialogue in September 2014 (target contract signature June 2015). • Cassette body assembly: market survey mid 2015. (target CFT Q 1 2016) First Wall Awarded: • [OPE-443] full scale prototype. F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 4

Remote Handling Awarded: Divertor RHS [OMF 340 -1] to Assystem UK (rank 1) On-going:

Remote Handling Awarded: Divertor RHS [OMF 340 -1] to Assystem UK (rank 1) On-going: • Cask & Plug RHS [OMF-577] CFEI published 3 rd June 2014. Deadline for requests to participate: 4 July 2014. Invitation to dialogue: expected October 2014. • In-Vessel Viewing System [OMF-383] on-going dialogue since mid July 2014. Final invitation to submit tender: December 2014. Tender submission deadline: January 2015. Expected Award: July 2015. Under evaluation: • Neutral Beam RHS [OMF 340 -3] Tender phase ongoing, deadline for submission of tenders 16/06/2014. Expected Award: Ex. Co Jan. 2015. F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 5

Cryoplant & Fuel cycle Tritium Plant Under preparation: • Conceptual design for Hydrogen Isotope

Cryoplant & Fuel cycle Tritium Plant Under preparation: • Conceptual design for Hydrogen Isotope Separation System [ex-OPE-441]. Possible ITA signature with IO. Target CFT Q 3 2015. Vacuum pumping Awarded: OPE-551: He gas transfer lines. Signed on 04/09/2014 with Criotec Impianti. ITER Cryopump component F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 6

TBM & Materials development TBM Under preparation: • [FPA-611] Helium Cooled Lithium Lead and

TBM & Materials development TBM Under preparation: • [FPA-611] Helium Cooled Lithium Lead and Pebble Bed simulation tools development (see info day documents). On-going: • [FPA-603] codes and standards developments for Eurofer 97 material (deadline 17/10). TBM materials Under preparation: • 20 -25 t of Reduced-Activation Ferritic. Martensitic steel plates Eurofer-97 (RCCMRx specifications). Target CFT Q 4 2014 Ancillary system F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 7

Technical Support On-going: • [OMF-586] Joining & Testing procedures used in ITER components manufacturing

Technical Support On-going: • [OMF-586] Joining & Testing procedures used in ITER components manufacturing (deadline 01/10). • [OMF-563] material characterization at cryogenic temperature (deadline 30/09). • [OMF-578] Thermo hydraulic and Fluid dynamic analysis (deadline 30/10). F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 8

Planning and Scheduling Under evaluation: • [OMF 555]: FW for dual use export compliance

Planning and Scheduling Under evaluation: • [OMF 555]: FW for dual use export compliance services • [OMF 556]: FW for Planning and scheduling • [OMF 557]: FW for Quality Inspection F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 9

Neutral Beam & EC Power Supplies Including NBTF [Mitica/Prima/Spider] On-going: • 1 MW CW

Neutral Beam & EC Power Supplies Including NBTF [Mitica/Prima/Spider] On-going: • 1 MW CW Gyrotron (140 GHz) W 7 -X [OPE-0552] Superconducting magnet for the EU Gyrotron (deadline to submit 03/11/2015) Under preparation: • [OPE-278]: AGPS-GRPS (target CFT October 2014). • [OPE-307]: MITICA Cryoplant: (target CFT is Q 1 2015. • SF 6 plant: probably EPC contract. Target CFT Q 3 2015. • MITICA beam source. Target. CFT Q 2 2015. Under evaluation: • [OPE-520]: Mitica Vacuum vessel. F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 10

Diagnostics [connectors, infrared tech, optical, reflectometers, etc. ] Under preparation: • Bolometer sensor manufacturing

Diagnostics [connectors, infrared tech, optical, reflectometers, etc. ] Under preparation: • Bolometer sensor manufacturing (see market survey). Target CFT Q 2 2015. • Outer Vessel Coils (OVC): Target CFT Q 1 -Q 2 2015. • Core Plasma Thomson Scattering (CPTS): Target CFT Q 3 2015. • Manufacturing Design Support (OMF): Target CFT Q 2 2015. Under evaluation: continuous external Rogowski coil [OPE-558]: Target award: 11/2014 F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 11

Buildings (and site adaptation) 1/2 Awarded: • TB 02 -Lift and cranes [OPE-285] Signed

Buildings (and site adaptation) 1/2 Awarded: • TB 02 -Lift and cranes [OPE-285] Signed with • TB 03 -Nuclear tokamak building/assembly hall/doors [OPE-286]: signed with VFR NKM Noel special cranes (Germany) consortium (France-Spain) • TB 04 - Mechanical & Electrical System [OPE 301]: Signed with GDF-Suez consortium (France-Germany) • TB 05 - Design & Build package [OPE-378]: Signed with Ferrovial Agroman SA (Spain) F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 12

Buildings (and site adaptation) 2/2 • TB 06 - HV electrical Power distribution [OPE-428]:

Buildings (and site adaptation) 2/2 • TB 06 - HV electrical Power distribution [OPE-428]: CFT • TB 07 -Design &Build package [OPE-429]: Signed • TB 08 -site infrastructure [OPE-374]: Signed with under preparation (fine-tuning exchanges with IO target CFT Q 4/2013) with Ferrovial Agroman SA (Spain) COMSA SAU (Spain) Under preparation: • TB 13 -Emergency electrical power distribution [OPE-540]: Pre-information notice published On-going: • TB 14 -Site Infrastructure Works [OPE-0593]: deadline for submission 06/10/2014 General strategy presentation to be updated soon. F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 13

Antennas & Plasma Engineering Antennas EC launcher On-going: • Contract for support for design

Antennas & Plasma Engineering Antennas EC launcher On-going: • Contract for support for design of cooling systems [OFC-0569]: deadline for submission is 15/09/14 Under preparation: • Physics and engineering modeling for plasma control and scenarios Antennas • Additional heating systems analysis • Disruption modeling and simulation • Plasma control system design • Antennas engineering support & analysis • Scenario & plasma performance analysis F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 14

ILO Meeting #26 Market surveys Market Surveys on-going DIAGNOSTICS- bolometer sensor manufacturing MAGNETS- PF

ILO Meeting #26 Market surveys Market Surveys on-going DIAGNOSTICS- bolometer sensor manufacturing MAGNETS- PF coils cold tests Market Surveys to come DIVERTOR – Cassette assembly, Q 1 2015 EC UL/CODAC – System and Instrumentation Engineering Support, Q 3 2014 Info Days to come 10 th June 2015: F 4 E Forum F 4 E Market Intelligence group - ILO Meeting #26 – 29 th September 2014 – San Sebastian 15