IKON 14 Feedback from instrument engineer In which
IKON 14 Feedback from instrument engineer
In which areas have we made progress during this IKON meeting ? 1. 2. 3. 4. Vacuum and fluid infrastructure was progressed Remote handling in the bunker area. Procedure and step necessary for NSS Construction works. Possibility of a study by a company to standardize the shielding blocks 1. Allowed materials in the bunker was discussed in detail from the last IKON 13 2. Brain storming workshop on RH (November 2017): instrument teams engineers and ESS NSS team.
What topics shall we address jointly now ? How can my team help ? On which timeline and with whom – from ESS core team or partner sphere ? 1. Promote satellite meeting to solve bunker wall insert 2. Progress about ongoing subject, cable and routing, engineering in the bunker 3. Continuation of RH and instrument integration 4. A second RH workshop could be done before the next IKON 5. The planning should be addressed as soon as possible in a face to face meeting and not in big assembly like we had
Which focus for the next IKON meeting in Sept. 2018 ? Who to involve in the preparation ? 1. Motion control and automation needed for next IKON 2. PSS example of an instrument (BIFROST offered to go for the process) 3. Instrument team should present the work ongoing and the difficulties they are facing. 4. Instrument : Show work presented at the last STAP meeting 5. Infrastructure – electrical connection, compressed air, water et cetera
- Slides: 4