India Rooftop Solar Mission Target Rooftop Solar Power 40, 000 MW Roof Area 4.

India Rooftop Solar Mission Target Rooftop Solar Power 40, 000 MW Roof Area 4. 5 billion sq. ft. Solar Mission 70% of capacity from New construction (~$ 30 Bn) Optimized Solar Ready Roofs Vital

Why Solar Ready Roofs are Vital • Direction and Slope of the Roof with

Why Solar Ready Roofs are Vital • Direction and Slope of the Roof with favorable for Solar Power Generation. • Design of the roof and Plant • Avoiding Shadow of any Big/ large chimney or equipment in concept or design phase itself • Walkways • Safety during installation • Less Installation time

Study Case – Large Manufacturing Industry 210 ft North Central Ridge Line Roof Layout

Study Case – Large Manufacturing Industry 210 ft North Central Ridge Line Roof Layout 570 ft Available Area: 120, 000 sq. ft, Available for Solar: 37, 800 sq. ft. only 315 KW against 1200 KW Takeaways: 70% rooftop area wasted because of improper planning of the building; Loss of 23 Cr Rs. in potential savings.

Study Case – Large MNC Available Roof Area : 2 MW; Suitable for Solar:

Study Case – Large MNC Available Roof Area : 2 MW; Suitable for Solar: NIL (load bearing only up to 12 kg/sq. Feet) Lost opportunity of savings of Rs. 52 Cr on electricity cost Roof Layout Takeaway: Industrial roofs should be designed with minimum load bearing capacity of 18 kg/sq. Feet or more.

Case Study: Virtual Roofs – Metro Cities face challenge of ROOF area & installed

Case Study: Virtual Roofs – Metro Cities face challenge of ROOF area & installed with Utility Equipments. High grid tariff’s Rs. 8 ~ 11 / Unit (Variable Tariff only) Takeaway: Virtual Roofs / Superstructures may offer viability on Solarising Terraces in Metro Cities over Buildings Image Courtesy: Rely. On Solar

New Approach – Solar Roofs Central Ridge Line North Solar Ready Roof Payback tenure:

New Approach – Solar Roofs Central Ridge Line North Solar Ready Roof Payback tenure: 5 Yrs Capex: Rs. 25 Cr Solar Ready Roof Net Savings: 117 Cr 480 m Capacity 5000 KW 136 m Roof Layout Takeaway: Designing Solar ready roofs at pre-construction project stage optimizes solarization possibilities for the industry.

New Roofs optimized for Solar Power Durability Safety Exhaust Provisions for O&M New Optimize

New Roofs optimized for Solar Power Durability Safety Exhaust Provisions for O&M New Optimize d Roofs Optimu m Angle Ease of Installation Leakage Proof

Industry wins with Solar ready Roofs Low Installation Costs Reduced Solar gestation period Benefits

Industry wins with Solar ready Roofs Low Installation Costs Reduced Solar gestation period Benefits Safe and durable roof Leakage Prevention