Hennepin County Transportation Systems Plan (HC-TSP) Traffic Forecasting Model

Hennepin County Transportation Systems Plan (HC-TSP) Traffic Forecasting Model

Background Ø Ø Model initially developed in 1997 -98 Derived from Met Council Regional

Background Ø Ø Model initially developed in 1997 -98 Derived from Met Council Regional Model Minor Updates in 2000 & 2002 Conversion from TRANPLAN / Trans. Pro to Trans. CAD begun in 2004

Model Features Ø Ø Ø Land Use Based (sq-ft, Dwelling Units, etc. ) –

Model Features Ø Ø Ø Land Use Based (sq-ft, Dwelling Units, etc. ) – linked to Countywide parcel database Strong GIS Linkage (Arc. GIS) Only Vehicle Trips Modeled 3 -Purposes for Trip Productions / Attractions (HBW, HBO, NHB) Trip Generation via ITE trip rates

Model Characteristics Ø To accurately depict Arterials – must model one level below (to

Model Characteristics Ø To accurately depict Arterials – must model one level below (to collector street level) – this requires 50% increase in nodes / links

Model Characteristics Ø Huge databases to manage (parcel database 350, 000+ records)

Model Characteristics Ø Huge databases to manage (parcel database 350, 000+ records)

Model Characteristics Ø Met Council TAZ’s split about 3: 1 500 Met Council TAZ

Model Characteristics Ø Met Council TAZ’s split about 3: 1 500 Met Council TAZ -> 1, 500 HC TAZ

Model Characteristics Ø High level of ADT calibration

Model Characteristics Ø High level of ADT calibration

Why Trans. CAD ? Ø Ø Some previous familiarity with the package – had

Why Trans. CAD ? Ø Ø Some previous familiarity with the package – had dabbled with Demo copy in 2003 -04 Local Road Research Board Project in 2004 – Snowplow routing (2 licenses purchased) Package had ITE Trip Generation built-in Good GIS compatibility with Arc. View

Status of Model Refinements Ø Ø Ø Existing Land Use verification completed (required 1

Status of Model Refinements Ø Ø Ø Existing Land Use verification completed (required 1 -1/2 year effort) TAZ’s refined – parcels allocated to both Met Council and Hennepin County TAZ’s First attempt for existing trip generation completed

Schedule

Schedule