Helsingborg 1 Abstract previous studies Actions 1 2
Helsingborg
1 Abstract, previous studies Actions: 1. 2. 3. 4. 5. 6. Beach improvements Protection from rising sea levels (railway station/city centre and the village Råå) Urban development in the harbour Flood problems along stream The port form their areas according to rising sea levels Heavy rain and low-points. 2 6 (hela staden) 3 5 Protection from rising sea levels - surface water. Climate change action plan. 5 4 1 2 1
What we’re actually doing? + North tunnel portal, small levee + Central station, preparing portable protection + New development on a higher level
Long term strategy + Inner protection + Outer protection + Reference: No actions
Existing conditions New conditions in the future + Expansion of the West coast railway + West coast railway Tunnel portal at +2, 4 Construction 2028 -2035 Emergency exit from tunnel +1, 9 Stairs etc around Helsingborg C + Fixed linked to Denmark +2, 4 Possible in the future + City Central Quay at +1, 9 Bridges at +2, 5 New blocks at +3, 5
Time schedule Study Procurement phase Start-up meeting Risk Analysis Final report Technical study Aug Sep Oct Nov Dec Jan 2019 Feb Mar Apr May
Study + Point out one strategy + Propose actions for investment planning (~10 years) + Propose long term actions for master planning + Basis for railway/urban planning + Risk evaluation + Technical studies + Report, late spring 2019
Upcoming activity + Projectgroup will plan for visiting Gothenburg and Uddevalla. + Planning for a exchange with Dordrecht through Barry Gersonius. + Short term actions for Helsingborg C. + Investigate where to install flood protection. + Investigate mobile floodbarriers like Flood. Gate and/or sandbags. + Create rutins for imminent flood threat to Helsingborg C.
Challenges + Involve national and local organisations for floodprotection. + Political ambitions versus long term function
- Slides: 11