Helium collector structural analysis Jonathan Moberg Outline 1
Helium collector structural analysis Jonathan Moberg
Outline 1. Overview 2. Bellows 3. Pipes 4. Supports
Routing of the collector Cold box room vent line Total length of the collector < 400 m CDS vent line L = 12 m, DN 400 CTL gallery L = 55 m Elliptical and Spoke Linac tunnel 310 m
Connections to the collector header 4
5
Bellows 6
Highest stress in the system 7
Deformation 8
SHC [L/R] Cryomodule L L L Spoke transition elliptical L R R Deformation 1 [mm] Deformation 2 [mm] Total Deformation [mm] 21. 84 22. 48 9. 19 2. 64 21. 8 24 25 31 2. 65 21. 83 21. 79 2. 58 21. 74 2. 61 2. 65 17. 09 24 24 24 20 2. 62 21. 78 24 9
CDS vent line connection 10
11
Stub loads Safety device Type SV 91 SV 92 SV 93 SV 94 RD 92 DIN EN 1092 -1 Form B 1 (DIN 2526 Form C) DIN EN 1092 -1 Type 11 Form B Interface DN Interface PN 80 16 -0. 30 1. 3 40 16 -0. 20 25 40 -0. 15 40 40 100 16 Static pressure in the flexible inlet hose Fz due valve Fx to mass opening [k. N] Fy [k. N] Fz [k. N] -1. 4 0. 8 -4. 5 -0. 20 2 -4. 5 -0. 20 5. 6 NA NA NA 12
Load cases Load case 1 2 3 4 5 6 DN 25 [N] -4500 -4500 dir DN 40 [N] z 4500 y -4500 x 4500 y 4500 z 0 dir DN 80 [N] z -1400 y -1400 x -1400 z -1400 dir DN 100 [N] z 5600 y 5600 x 5600 y 5600 z 5600 dir y y y 13
Load case 3 1. 4404 1. 4307 Time step Plastic deformation [m/m] 1 6. 19 E-03 3 6. 44 E-03 5 6. 62 E-03 7 6. 75 E-03 9 6. 84 E-03 11 6. 90 E-03 13 6. 94 E-03 15 6. 96 E-03 17 6. 97 E-03 Time step Plastic deformation [m/m] 1 6. 34 E-03 3 6. 60 E-03 5 6. 79 E-03 7 6. 94 E-03 9 7. 04 E-03 11 7. 11 E-03 13 7. 15 E-03 15 7. 17 E-03 17 7. 18 E-03 n_allowed 6328 4654 Plastic strain [m/m] Plastic deformation 7. 60 E-03 7. 10 E-03 6. 60 E-03 LC 3 1. 4307 6. 10 E-03 5. 60 E-03 LC 3 1. 4404 0 5 10 Time step 15 20 14
Plastic deformation 7. 40 E-03 7. 20 E-03 Plastic strain [m/m] 7. 00 E-03 6. 80 E-03 6. 60 E-03 LC 3 1. 4307 6. 40 E-03 LC 3 1. 4404 6. 20 E-03 6. 00 E-03 5. 80 E-03 5. 60 E-03 0 2 4 6 8 Time step 10 12 14 16 18 15
Floor mounted support 16
Floor mounted support 17
F_5, 5316 e+005 18
F_5, 5316 e+005 19
Ceiling beam 20
Ceiling beam 22
Primary supports 23
Anchors 24
Supports in the corridor to the cold box 25
Supports in the corridor to the cold box 26
Fix after the L-shaped hole 27
- Slides: 26