Handling Engineering group Antonino Calderone Damien Lafarge Jean-Pierre Lappe Nicolas Perez EN-HE-LM Lifts Maintenance Annual Overview EN-HE annual meeting th 4 December 2015 D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 2
Summary LM structure Maintenance activities Consolidation Projects Conclusion D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 3
LM Structure Damien LAFARGE Section Leader Nicolas PEREZ Damien LAFARGE Controlled access zones (~50) D. Lafarge / EN-HE-LM Engineering Department Jean-Pierre LAPPE Antonino CALDERONE Tertiary buildings (~75) EN-HE Annual Meeting 04. 12. 2015 4
Maintenance activity 2015 • • • 132 equipment including 118 lifts 213 IMPACT requests in 2015 Stable maintenance performance Vs 2014 PM 54, PM 15, Bat 31, Bat 54 to be watched out Creation of meters in Infor 2 VIP visit in 2015 (IT + TEDx. CMS) D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 5
Maintenance activity 2015 Qtty of breakdowns – all lifts Qtty of breakdowns – LHC lifts 120 600 100 500 80 400 60 300 40 20 100 5 01 4 2 01 3 2 01 2 2 01 1 EN-HE Annual Meeting 04. 12. 2015 2 01 0 2 01 9 2 00 8 2 00 7 2 00 5 2 00 2 5 01 4 2 01 3 2 01 2 2 01 1 2 01 0 2 01 9 2 00 8 2 00 7 2 00 6 2 5 2 00 D. Lafarge / EN-HE-LM Engineering Department 6 0 0 6
Consolidation 2015 • New lifts: • • bldg 107 (AC+JPL) bldg SCX 8 (NP + DL) FB training center (AC + JPL) Consolidation: • • bldg 39 (x 2) (AC + JPL) bldg 32 (x 2) (AC + JPL) D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 7
Consolidation 2015 – bldg SCX 8 D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 8
Consolidation 2015 – Bldg 32 D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 9
Consolidation 2015 – bldg 39 D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 10
Projects 2015 – tertiary bldg • • • Study and order of 1 lift for bldg 14 with -1 extension (2016, AC + JPL) Order of revamping for 1 lift in bldg 31 (2016, JPL) Study for 1 lift for goods in bldg 866 (2016, JPL) Study for lift replacement in Bldg 54 (2017, JPL + Mr/Mrs X) Launch of migration of contract follow-up into Infor EAM (E 111, E 080 DL) Validation of MS-4130 result and launch of IT-4130 (DL) D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 11
Projects 2015 - machines • • • Launch (and termination) of B 1433/EN contract for LHC lifts replacement (DL+NP) Specification for electrical refurbishment of 25 t lifts in SPS (quantity to be defined) Lifts integrated in SCADA see their usage transferred automatically to Infor (DL) Preparation of PX 24 lift replacement (2016 EYETS, NP) Preparation PZ 85 lift replacement (2016 EYETS, DL) Preparation PM 54 lift replacement (2017 Run 2, DL) D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 12
Overview 2016 • • Replacement with -1 extension in bldg. 13 Refurbishment in bldg. 31 Replacement in bldg. 866 IT-4130 contract to launch : Replacement in bldg. 14 Termination and launch of B 1433 contract Work preparation for PX 24, PZ 85 and PM 54 replacements ! Beginning of PZ 85 (or PX 24) lift replacement D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 13
Conclusions • • • Workload in 2015 was high but projects were successful LHC lifts replacement project postponed to 2016 New contract to launch for tertiary buildings Maintain careful monitoring of maintenance contracts Turnover in the section D. Lafarge / EN-HE-LM Engineering Department EN-HE Annual Meeting 04. 12. 2015 14