GTR 9 2 06 Informal Group on gtr

  • Slides: 5
Download presentation
GTR 9 -2 -06 Informal Group on gtr No 9 - Phase 2 (IG

GTR 9 -2 -06 Informal Group on gtr No 9 - Phase 2 (IG GTR 9 -PH 2) 2 nd meeting, Osaka/Japan, 28 - 29 March 2012 Technical Specification and PADI Procedures for Assembly, Disassembly and Inspection Presented by the pedestrian safety experts of the International Automobile Manufacturers’ Organization (OICA) 28. & 29. 03. 2012 Page 1

GTR 9 -2 -06 Technical Specification and PADI Procedures for Assembly, Disassembly and Inspection

GTR 9 -2 -06 Technical Specification and PADI Procedures for Assembly, Disassembly and Inspection Terms of Reference of the Informal Group GTR 9 Phase 2 (GTR 9 -C 07 r 1, see Annex 1, i. e. activity list) d) Technical specifications (drawings) and PADI (user manual) Remarks and Questions from Industry 28. & 29. 03. 2012 Page 2

GTR 9 -2 -06 Remarks: Providing technical specifications and PADI would offer - additional

GTR 9 -2 -06 Remarks: Providing technical specifications and PADI would offer - additional transparency of the Flex. PLI design to the public - the access of other interested test tool manufacturers Other test tool manufacturers will have a positive effect on - minimizing possible supply gaps in future (related to the test tool itself and the spare parts) - optimizing handling and maintenance issues Similar approaches are observed in the Geneva activities of GTR 7 - “Dummy Tool Box” activities - see GRSP-50 -26 and GRSP-50 -27 28. & 29. 03. 2012 Page 3

GTR 9 -2 -06 Questions: When will the Flex. PLI information (specification and PADI)

GTR 9 -2 -06 Questions: When will the Flex. PLI information (specification and PADI) be available to the public ? Are there restrictions for other tool manufacturers - like patents to be considered ? - generally to be considered ? Is the information of the technical specification and PADI limited to - complete test tool ? - components of the test tool (spare parts) ? 28. & 29. 03. 2012 Page 4

GTR 9 -2 -06 Thanks 28. & 29. 03. 2012 Page 5

GTR 9 -2 -06 Thanks 28. & 29. 03. 2012 Page 5