GSICS Coordination Center Report GSICS Executive Panel Meeting

  • Slides: 12
Download presentation
GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center

GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center

Outline • Staff change in GCC team • Retro-processing status • Product Update and

Outline • Staff change in GCC team • Retro-processing status • Product Update and Status GPPA vs. SCOPE-CM Maturity Matrix • Possible solutions to promote the MW product • • Outcomes of 2013 Users’ Workshop • Near term goals

Staff Change in GCC • New GCC Director – Dr. Lawrence (Larry) Flynn as

Staff Change in GCC • New GCC Director – Dr. Lawrence (Larry) Flynn as the new GCC Director – Thanks Fuzhong Weng for his support to the GCC functions over the past six years. • New GSICS Quarterly Editor – Dr. George Ohring as the GQ editor since Jan 2013

GEO-LEO Retro-Processing @ Univ. Wisconsin • Completed and Delivered the GOES vs AIRS retrospective

GEO-LEO Retro-Processing @ Univ. Wisconsin • Completed and Delivered the GOES vs AIRS retrospective GSICS processing done for GOES Imagers – GOES-08 through -12 • Meteosat Second Generation (MSG) vs AIRS code installed and working at CIMSS – Some data delivered • Proposed order for back-processing of non-GOES imagers: – – – MSG (MET-9 done, MET-started) , MET-7 (done), MET-5 MTSAT (GMS-5) FY-2 C FY-2 D FY-2 E • MET-8 and MET-9 begun

Product Updates • Two GEO-LEO IR products in pre-Op phase – EUMETSAT vs. IASI

Product Updates • Two GEO-LEO IR products in pre-Op phase – EUMETSAT vs. IASI product – GOES Imager vs. IASI product – MTSAT product is close to pre-Op, need the undergoing uncertainty analysis • One new product in demonstration phase – NOAA (A)MSU LEO-LEO • It is agreed that bias monitoring is a powerful tool, not a product.

Update of GSICS Products in Demo and higher levels Algorithm Type GPRC Monitored Instrument

Update of GSICS Products in Demo and higher levels Algorithm Type GPRC Monitored Instrument Reference Instrument GSICS NRT Correction GSICS Re. Analysis Correction EUMETSAT Meteosat IASI Pre-Op JMA MTSAT IASI (+AIRS) Demo (close to pre-Op) NOAA GOES Imager IASI (+AIRS/Cr. IS*) Pre-Op LEO-LEO Vis/NIR NOAA AVHRR MODIS Demo LEO-LEO Microwave NOAA (A)MSU Demo GEO-LEO IR *: Currently product is based on IASI. Plan to use AIRS/Cr. IS for the midnight correction

GEO-LEO IR Products in Development Algorithm Type GEO-LEO IR GPRC Monitored Instrument Reference Instrument

GEO-LEO IR Products in Development Algorithm Type GEO-LEO IR GPRC Monitored Instrument Reference Instrument GSICS NRT Correction GSICS Re. Analysis Correction CMA FY-2 X IASI (+AIRS) In Development KAM COMS IASI (+AIRS) In Development NOAA GOES Sounder IASI (+AIRS/Cr. IS) In Development

New Products on Emerge • GEO-LEO DCC visible products Algorithm Type GPRC Monitored Instr.

New Products on Emerge • GEO-LEO DCC visible products Algorithm Type GPRC Monitored Instr. Reference Instr. NRTC Re-Analysis GEO-LEO Vis DCC CMA FY-2 X Aqua MODIS Collection 6 In Development EUMETSAT Meteosat In Development KMA COMS In Development JMA MTSAT In Development NOAA Imager In Development

GPPA vs. SCOPE MMI

GPPA vs. SCOPE MMI

Challenges to promote MW products • Very limit response to review the MW product

Challenges to promote MW products • Very limit response to review the MW product – Only one panel responded to review part of the products • Possible Solution – Re-organize the WM subgroup? – Cheng-Zhi Zou has identified additional reviewers – “One suggestion is that we probably need to have a microwave calibration meeting sometimes next year. STAR had such meetings in March 2010 on Microwave Sounding and Imagery and in 2011 on AMSU surface channels. These were very successful meetings. Now STAR has several groups working on microwave calibration and products. So a microwave meeting at NCWCP should be appealing to the community. ” - email from C. Zou

Outcomes of 2013 Users’ Workshop • Users’ Request – Calibration alert system – Intermediate

Outcomes of 2013 Users’ Workshop • Users’ Request – Calibration alert system – Intermediate products such as SNO and GEO-LEO collocation data – UV and synthetic observation subgroups

Near-term Goals • GSICS Products • GEO-LEO IR product in Operation phase • DCC

Near-term Goals • GSICS Products • GEO-LEO IR product in Operation phase • DCC products in Demonstration Phase • Create UV working group