GSCDA GPT CQC GEST DAIL Server Set MC

  • Slides: 15
Download presentation
GSCDA GPT CQC GEST DAIL Server Set: • MC 2 (CDS catalogue): CAT •

GSCDA GPT CQC GEST DAIL Server Set: • MC 2 (CDS catalogue): CAT • ODA (Online Order/Download): ORD Middleware: • DAIL: CAT, ORD, UM Client Set: • GCL (EOLI for GSPs): CAT, ORD, UM • GEST (Emergency): CAT, ORD, UM • CQC (Quality Control): CAT • GPT (Pre-planning): CAT Status: • AR Aug 2011 • TTO Sept 2011 Notes: • HMA IF’s proposed to GSP for B 2 B integration (giving access to all DAIL CAT + CDS ODA ordering) MC 2 GCL ODA

 • GCM requirements baseline – CAT V 2. 4 – ORD V 0.

• GCM requirements baseline – CAT V 2. 4 – ORD V 0. 9. 4 – UM V 1. 0 (optional) – HMA Clarification. V 1. 4 – USE OF THE REGISTRY PACKAGE ID IN GETRECORDBYID, GETOPTIONS, SUBMIT – EOP REGISTRY PACKAGE ID (EOP RP-ID) NAMING CONVENTIONS – DETERMINATION OF THE COLLECTION NAME FROM THE EOP RP-ID IN THE DAIL – GETRECORDBYID ACTION NAME CLARIFICATION FOR SOAP 1. 1 – HMA ORDERING SERVICE XSD VERSION 0. 9. 4 TER – HMA ERROR FORMAT – GSCDA - HMA ORDER: SCENE SELECTION HMA Standards Summary Table

DLR Server Set: • EOWEB CSW: CAT • EOWEB HOS: ORD • EOWEB Front

DLR Server Set: • EOWEB CSW: CAT • EOWEB HOS: ORD • EOWEB Front End: UM Applicable Missions: • Sample Collections in MM Facility Status: • HMA-I ORR achieved in Dec 2010 Notes: • HMA implemented in MM facility, operational roll-out ongoing for Astrium/ITD and EUROMAP

Server Set: • EOPORTAL / UMARF: • DISCOVERY • CAT • ORD Status: •

Server Set: • EOPORTAL / UMARF: • DISCOVERY • CAT • ORD Status: • CAT interoperability integrated • ORD interoperability tests planned Feb/Mar Notes: Further discussion for User Management / T & C required before operational link-up of ordering could be foreseen

ESA Server Set: • M 2 AS (PEP): CAT, ORD, UM • M 2

ESA Server Set: • M 2 AS (PEP): CAT, ORD, UM • M 2 CS (MM catalogue): CAT • MMOHS (MM order): ORD • EOLI: CAT • WMS 2 EOS: WMS Applicable Missions: • ENVISAT, ERS, EE, TPM Status: • Under validation Notes: • Prototype implementations in SSE/INFEO

Server Set: • HMA Search Instance (R 2 HSI) Web Server: CAT • HMA

Server Set: • HMA Search Instance (R 2 HSI) Web Server: CAT • HMA Ordering System (HOS) Web Server: ORD Applicable Missions: • RADARSAT 2 Status: • MDA HMA-I CAT ORR achieved in Dec 2010 • ORR achieved Sept-2011

SPOT Server Set: • DALI gateway: CAT • PLEIADES access: CAT • ordering: ORD,

SPOT Server Set: • DALI gateway: CAT • PLEIADES access: CAT • ordering: ORD, UM Applicable Missions: • SPOT • PLEIADES (coming) Status: • SPOT HMA-I ORR achieved in Jun 2011 • GCM tailoring ongoing for GSCDA, CDR ongoing • Pleiades: implementation completed. To be reactivated before launch.

Server Set: • Keystone Catalogue: CAT • Management System: ORD • Keystone Catalogue: WMS

Server Set: • Keystone Catalogue: CAT • Management System: ORD • Keystone Catalogue: WMS Applicable Missions: • UK-DMC-1 • UK-DMC-2 • Nigeria. Sat-1 • Beijing-1 • Al. Sat-1 Status: • DMC HMA-I CAT and ORD ORR achieved in Dec 2010 • GCM tailoring for GSCDA, including ORD, onachieved ORR Oct-2011 Notes: •

Server Set: • Keystone Catalogue: CAT • Management System: ORD • Keystone Catalogue: WMS

Server Set: • Keystone Catalogue: CAT • Management System: ORD • Keystone Catalogue: WMS Applicable Missions: • DEIMOS-1 Status: • Undergoing validation.

Server Set: • PGS EOWEB HMA CSW: CAT • DLR EOWEB Front End: ORD

Server Set: • PGS EOWEB HMA CSW: CAT • DLR EOWEB Front End: ORD Applicable Missions: • Terra. Sar-X Status: • GCM implementation ORR achevied Notes: Restrictions due to German Security rules and in passing commercial info mean that the HMA ORD implementation are tuned to GSCDA context and not immediately appropriate for full open exploitation

Server Set: • SPOT-VGT HMA Catalogue (Buddata extension) in SUV/VUS backend: CAT • SPOT-VGT

Server Set: • SPOT-VGT HMA Catalogue (Buddata extension) in SUV/VUS backend: CAT • SPOT-VGT HMA Ordering in SUV/VUS backend: ORD Applicable Missions: • SPOT-4/VEGETATION-1 • SPOT-5/VEGETATION-2 Status: • ORR achieved Sept. 2011

Server Set: • HMA CWS: CAT • HMA ORD Interface: ORD Applicable Missions: •

Server Set: • HMA CWS: CAT • HMA ORD Interface: ORD Applicable Missions: • COSMO Sky. Med • GEOEYE 1 -2 • IKONOS Status: • GCM implementation on-going • CDR achieved Nov-2011 Notes:

Server Set: • Rapid. Eye Catalogue: CAT • Rapid. Eye Order Handling System: ORD

Server Set: • Rapid. Eye Catalogue: CAT • Rapid. Eye Order Handling System: ORD Applicable Missions: • Rapid. Eye Constellation Status: • Implementation for GSCDA ongoing. Due for testing and transfer to operations Apr/May 2012 Notes: • Rapid. Eye not supporting User Management Interfaces for EO Services • Authentication based on mutual certificate exchange and HTTPS protocol

Server Set: • EOWEB CSW: CAT • EOWEB HOS: ORD Applicable Missions: • IRS

Server Set: • EOWEB CSW: CAT • EOWEB HOS: ORD Applicable Missions: • IRS Status: • GCM implementation on going – IVRR planned Mar-2012 Notes: • DLR is contributing its HMA interfaces to Euromap for the IRS Mission • DLR will operate the catalogue and ordering user services with access via the HMA CSW protocol and ordering protocol • The HMA Ordering services will be linked up with the Euromap’s order handling system (KAPV).

Server Set: TBD: CAT TBC: ORD (devt. in US) Applicable Missions: • IKONOS •

Server Set: TBD: CAT TBC: ORD (devt. in US) Applicable Missions: • IKONOS • Quickbird • World. View-1 Status: • Developments KO Sept 11. • Completion date TBC