GS-ASE-AS Organisation for Alarms Systems Projects • • M. DOLE GS-ASE-AS EDMS File :

GS-ASE-AS Organisation for Alarms Systems Projects • • M. DOLE GS-ASE-AS EDMS File : EDMS-1477367 V 1 3/12/2021 EDMS-1477367 V 1 2

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders of Magnitude : «classical» durations and budgets 4. Conclusion 3/12/2021 EDMS-1477367 V 1 3

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders of Magnitude : «classical» durations and budgets 4. Conclusion 3/12/2021 EDMS-1477367 V 1 4

1. Main activities of GS-ASE-AS (1/1) • Concerned Safety Alarms Systems : • •

1. Main activities of GS-ASE-AS (1/1) • Concerned Safety Alarms Systems : • • • Fixed Fire Detection systems Fixed Gas Detection systems Emergency Evacuation systems Beam Imminent Warning systems CERN Safety Alarm Monitoring (CSAM) Hardwired Safety Alarm Network (“répartiteurs”) Red Telephones Portable gas detection systems … 3/12/2021 EDMS-1477367 V 1 5

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders of Magnitude : «classical» durations and budgets 4. Conclusion 3/12/2021 EDMS-1477367 V 1 6

2. Fire and Gas detection projects (1/2) Design methodology inspired by IS 37, IEC

2. Fire and Gas detection projects (1/2) Design methodology inspired by IS 37, IEC 61508 and REX : Executed by Product Manager Risks analysis With contribution of : - Physists - DGS-HSE - … Conclusions of risks analysis Reception DGS/HSE IF need of AL 3 system (pronounced by DGS-HSE) Analysis of the requirements and writing of an offer Executed by Member of GS-ASE-AS With contribution of : - EN/EL - EN/CV - Subcontractors - … Site acceptance (Tests Type 2) Factory acceptance (Tests Type 0 and 1) Design Study Fabrication 3/12/2021 EDMS-1477367 V 1 7

2. Fire and Gas detection projects (2/2) Conlusions of the risks analysis = fundamental

2. Fire and Gas detection projects (2/2) Conlusions of the risks analysis = fundamental input data : • • • Environmental conditions (radiation, magnetic field, T°, …) Location of the danger to detect List of safety actions Depending on the project, 3 cases could appear : CAS 1 : Addition of standard equipment on an existing system CAS 2 : Creation of a new standard system 3/12/2021 CAS 3 : Creation of a new non standard system (prototyping necessary) EDMS-1477367 V 1 8

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders of Magnitude : «classical» durations and budgets 4. Conclusion 3/12/2021 EDMS-1477367 V 1 9

3. Orders of magnitude : «classical» durations and budgets (1/1) Budget (with EN/EL cabling)

3. Orders of magnitude : «classical» durations and budgets (1/1) Budget (with EN/EL cabling) Case 1 : Extension of existing standard system - Air sampling : 10 k. CHF / point of detection Duration : [Risk analysis] Duration : [Design to Reception with DGS-HSE] 3 – 6 month 2 – 3 month 3 – 6 month 4 – 5 month - Punctual detection : 500 CHF / point of detection Fire Detection - Siren : 500 CHF / equipment Case 2 : New standard system - Manual evacuation button : 500 CHF / equipment - Central PLC : 30 k. CHF Gas Detection Case 3 : non standard system > 100 k. CHF 3 – 6 month > 1 year Case 1 : Extension of existing standard system «medium» installation : 25 – 30 k. CHF 3 – 6 month 2 – 3 month Case 2 : New standard system «medium» installation : 90 – 100 k. CHF 3 – 6 month 6 – 8 month Case 3 : non standard system «medium» installation : > 100 k. CHF 3 – 6 month > 1 year Assumptions : - Medium installation for Gas detection : 10 sensors, 20 signalisations, 10 Safety actions 3/12/2021 EDMS-1477367 V 1 10

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders

Outline 1. Main activities of GS-ASE-AS 2. Fire and Gas Detection Projects 3. Orders of Magnitude : «classical» durations and budgets 4. Conclusion 3/12/2021 EDMS-1477367 V 1 11

4. Conclusion (1/1) Important points to consider for the Fire and Gas detection projects

4. Conclusion (1/1) Important points to consider for the Fire and Gas detection projects : - The conclusions of the risks analysis are the fondamental input data for fire and gas detection projects - DGS/HSE can help you to construct the risks analysis - Fire and Gas detection projects can take a long time and a consequent budget (depending of the conclusions of the risk analysis) 3/12/2021 EDMS-1477367 V 1 12