GLAST LAT Project LAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3,

GLAST LAT Project LAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status Rob Black rpblack@slac. stanford. edu 1 11/3/2004

GLAST LAT Project LAT Engineering Meeting Agenda • Agenda – Last Month's Accomplishments –

GLAST LAT Project LAT Engineering Meeting Agenda • Agenda – Last Month's Accomplishments – Drawing Release Plan – Issues and Concerns 2 11/3/2004

GLAST LAT Project LAT Engineering Meeting Last Months Accomplishments • • Support of Mechanical

GLAST LAT Project LAT Engineering Meeting Last Months Accomplishments • • Support of Mechanical Systems – Released LAT-DS-01580, Grid Box Base Assembly – Continued detail design efforts on MLI – Continued documentation maintenance Support of DAQ – Released Cable Way detail parts – Continued documentation maintenance – Instrumentation • Defined thermistor and accelerometer quantities and locations. – Need to review with appropriate subsystems and update all documentation • Established basic harness definitions, connector locations, pin outs etc. • Top Assembly Documentation – CAL-TEM Assembly Drawing submitted for release – Reviewing Tower installation drawing with Design Integration and I & T. 3 11/3/2004

GLAST LAT Project LAT Engineering Meeting Drawing Release Plan Top Level Drawings Document Description

GLAST LAT Project LAT Engineering Meeting Drawing Release Plan Top Level Drawings Document Description Issues Release ECD Need Date LAT-DS-01624 LAT Assembly Drawing MLI design must be completed 4/30/2005 LAT-DS-02561 LAT Tower & Elect Assembly Drawing Instrumentation routings defined 12/3/2004 11/1/2004 LAT-DS-02560 LAT Tower assembly drawing Finalizing instrumentation routing, TEM clocking, tracker cable bonding 11/12/2004 10/1/2004 LAT-DS-02559 CAL-TEM-PS Assembly drawing In review cycle with changes based on NRL review 11/10/2004 10/1/2004 Interface Drawings Document LAT-DS-00309 Description ACD-LAT INTERFACE, IDD Pending Rev. 04 Issues Updates complete, waiting for comments Drafting ECD Submitted for review 9/22 To Doc Control 11/3 LAT-DS-00233 CAL-LAT INTERFACE, IDD 07 Received comments from NRL 10/28 LAT-DS-00040 LAT INSTRUMENT STAY CLEAR 12 Update ACD envelope, Flexure clearance, MLI Interface Waiting for inputs from Spectrum ? LAT-DS-00851 TRACKER-LAT INTERFACE, IDD 2 Received comments from I & T 10/28, need to resolve Submitted 9/2 4 11/3/2004

GLAST LAT Project LAT Engineering Meeting Issues & Concerns • Timely and Appropriate review

GLAST LAT Project LAT Engineering Meeting Issues & Concerns • Timely and Appropriate review of Documents • CAL Interface (CAL-LAT IDD LAT-DS-00233 Rev 07) – 4 weeks to receive comments. • ACD Interface (ACD-LAT IDD LAT-DS-00309 Rev 04) – Check print sent out for review, 9/22, waiting for feedback • MLI Blanket Design – Conceptual design still in review by Spectrum – The only feed back received since 9/7/04 is a request for additional drawing views on 10/28 – Note the additional work to provide views was not planned until conceptual design approval was given. • Instrumentation – Detail design of cabling over 50% complete, cooperation between subsystems is required – Issues still open from last month • • • Instrumentation Termination Bracket design definition Specific locations and mounting methods have been defined, need to be reviewed Still need detail harness definition for accelerometers 5 11/3/2004