Geothermal Development Exporting Know-how in the Geothermal field March 16 2006 3/3/2021 London 2006

Geothermal Development Exporting Know-how in the Geothermal field March 16 2006 3/3/2021 London 2006

Geothermal Development Did you know? That we are Europe’s largest geothermal and hydro developer

Geothermal Development Did you know? That we are Europe’s largest geothermal and hydro developer • For the last 20 and foreseeably for the next 20 years. We have a work force of 400 experts • 100 geoscientists plus 300 specialized engineers. Iceland runs the UNU Geothermal program • Network of 340 fellows from developing countries 3/3/2021 London 2006

Geothermal Development What are we doing? In Iceland Harnessing 2, 000 MW geo+hydro electrical

Geothermal Development What are we doing? In Iceland Harnessing 2, 000 MW geo+hydro electrical power for the last 3 and next 10 years. For 3 new and 2 enlargements of aluminum smelters. 5 new geothermal plants and 4 enlargements 3 -5 new hydro plants 3/3/2021 London 2006

Geothermal Development What are we doing? In Iceland 3/3/2021 London 2006

Geothermal Development What are we doing? In Iceland 3/3/2021 London 2006

Geothermal Development What are we doing? In Europe 5 to 8 geothermal power plants

Geothermal Development What are we doing? In Europe 5 to 8 geothermal power plants in Hungary and Germany District heating systems in the new EU accession countries, Slovakia, Hungary, Poland… Under preparation: • Hydro project in Albania 3/3/2021 London 2006

Geothermal Development Bratile Albania Area Population (2003) GNI per capita (2003) Installed capacity Where-of

Geothermal Development Bratile Albania Area Population (2003) GNI per capita (2003) Installed capacity Where-of hydro 28. 700 km 2 3, 2 million 1. 740 $ 1. 600 MW 1. 500 MW Reservoir area Reservoir volume Gross head Rated discharge Average discharge Dam height Dam volume Headrace tunnel Installed capacity Energy production Estim. Construction cost 3/3/2021 2, 3 km 2 80 Gl (80 Mm 3) 145 m 57 m 3/s 28, 5 m 3/s 110 m 2, 5 million m 3 3, 1 km 2 x 35 MW 250 GWh/a 105 -110 M€ London 2006

Geothermal Development What are we doing? In the Americas • 7, 2 MW hydro

Geothermal Development What are we doing? In the Americas • 7, 2 MW hydro plant in Greenland • 8 MW binary plant being delivered to La. GEO in El Salvador • 150 MW plant in California, PPA under negotiation • 20 MWel CHP, PPA under negotiation in Unalaska 3/3/2021 London 2006

Geothermal Development Greenland 7, 2 MW hydro plant Qorlortorsuaq Co Investor Landsvirkjun (National Power)

Geothermal Development Greenland 7, 2 MW hydro plant Qorlortorsuaq Co Investor Landsvirkjun (National Power) 3/3/2021 London 2006

Geothermal Development El Salvador • Size: 8 MW • Type: Binary plant • Client:

Geothermal Development El Salvador • Size: 8 MW • Type: Binary plant • Client: La Geo 3/3/2021 London 2006

Geothermal Development Xianyang China • Co investors Glitnir and Orkuveita Reykjavíkur • District heating,

Geothermal Development Xianyang China • Co investors Glitnir and Orkuveita Reykjavíkur • District heating, first stages $60 mil. • Heating for up-to 4 million inhabitants • Joint venture Enex-China, CGCO & IFC 3/3/2021 London 2006

What can we do? Geothermal Development $$$ • Build geothermal plants for as low

What can we do? Geothermal Development $$$ • Build geothermal plants for as low as $1, 850/k. W • Generate and sell electricity for 24/7 use for 2, 0 -2, 5 cents/k. Wh • Deliver the turnkey expertise from surveying to billing for energy • Cost of electricity and heat among the lowest in the world 3/3/2021 London 2006

Geothermal Development Attracting power intensive industry • 350, 000 tons, Fjardaral, Alcoa (2007) •

Geothermal Development Attracting power intensive industry • 350, 000 tons, Fjardaral, Alcoa (2007) • 170, 000 tons expansion Nordural, Century (2008) • 260, 000 tons expansion ISAL, Alcan (2011) • 250, 000+ tons green field North Iceland, Alcoa ? ? ? • 250, 000 tons green field Helguvik, Century ? ? ? 3/3/2021 London 2006

What do we do? Geothermal Development Differently • • Intensive cost optimization Separate design

What do we do? Geothermal Development Differently • • Intensive cost optimization Separate design and procurement Locally acceptable job packages Fast-track i. e. simultaneous design and building • Used to work in remote low-service areas 3/3/2021 London 2006

We invest Geothermal Development Cooperating with local partners • Small to medium sized hydro

We invest Geothermal Development Cooperating with local partners • Small to medium sized hydro projects (20 -300 MW). • Geothermal plants and binary stations • Direct utilization of geothermal (for instance district heating). 3/3/2021 London 2006

Geothermal Development 3/3/2021 London 2006

Geothermal Development 3/3/2021 London 2006

Geothermal Development Shareholders of Enex: 1. 2. 3. 4. 5. 6. 7. 8. 9.

Geothermal Development Shareholders of Enex: 1. 2. 3. 4. 5. 6. 7. 8. 9. Landsvirkjun Orkuveita Reykjavikur Jarðboranir Hitaveita Suðurnesja Glitnir ÍSOR Nýsköpunarsjóður VGK Norðurorka 3/3/2021 10. 11. 12. 13. 14. 15. 16. Hönnun Fjarhitun VST Rafhönnun Almenna Rafteikning VSÓ + 26 minni hluthafar London 2006

Closing remarks • • Geothermal Development Started in 1969 New boost 2001 New CEO

Closing remarks • • Geothermal Development Started in 1969 New boost 2001 New CEO 2003 Just beginning • Thank you for your attention! 3/3/2021 London 2006

Electricity Generation by. Geothermal Sources. Development 1983 -2010 GWh/a 18. 000 Hydropower 16. 000

Electricity Generation by. Geothermal Sources. Development 1983 -2010 GWh/a 18. 000 Hydropower 16. 000 Oil 14. 000 Geothermal 12. 000 10. 000 8000 6000 4000 2000 3/3/2021 0 '83 '84 '86 . '88 '90 '92 '94 '96 '98 '00 '02 '04 '06 London '08 '102006

Geothermal Development Geothermal power generation 3/3/2021 London 2006

Geothermal Development Geothermal power generation 3/3/2021 London 2006

Reykjanes Geothermal Development • Reservoir 290 to 320°C • 100 MWel. • 1. 850

Reykjanes Geothermal Development • Reservoir 290 to 320°C • 100 MWel. • 1. 850 $/k. W • On schedule • On budget • On fast track 3/3/2021 London 2006

Geothermal Development Hellisheidi I. III. IV. 90 MWel 30 MWel 90 MWel 400 MWth

Geothermal Development Hellisheidi I. III. IV. 90 MWel 30 MWel 90 MWel 400 MWth • • • On Budget On schedule Fast track 3/3/2021 London 2006

Geothermal Development 3/3/2021 Vatnsfell 90 MWe Hydropower station 2001 London 2006

Geothermal Development 3/3/2021 Vatnsfell 90 MWe Hydropower station 2001 London 2006

Geothermal Development National Power Company • Operates 12 hydro-electric and 2 geothermal plants •

Geothermal Development National Power Company • Operates 12 hydro-electric and 2 geothermal plants • Produced 7. 5 TWh in 2005 • Installed capacity 1, 212 MW • Under construction 690 MW • Planned for commissioning in 2010: 330 MW • Annual turnover: $200 -250 million 3/3/2021 London 2006

Geothermal Development Reykjavík Energy • Operates one 120 MWe geothermal plant • Operates 850

Geothermal Development Reykjavík Energy • Operates one 120 MWe geothermal plant • Operates 850 MW district heating system • Under construction 120 MWe geothermal • Plans for commissioning in 2010: 200 MWe • Annual turnover: $200 -250 million 3/3/2021 London 2006