Future NCEP modeling plans Corey Guastini IMSG at

  • Slides: 23
Download presentation
Future NCEP modeling plans Corey Guastini IMSG at NCEP/EMC and Geoff Manikin NCEP/EMC

Future NCEP modeling plans Corey Guastini IMSG at NCEP/EMC and Geoff Manikin NCEP/EMC

Outline Timeline of NCEP’s transition to FV 3 dynamic core Overview of convection-allowing ensemble

Outline Timeline of NCEP’s transition to FV 3 dynamic core Overview of convection-allowing ensemble HREFv 2 and example forecasts

Proposed unification plan

Proposed unification plan

Climate Forecast System (CFS) GFS, MOM 4, NOAH, Sea Ice 3 D-VAR DA Current

Climate Forecast System (CFS) GFS, MOM 4, NOAH, Sea Ice 3 D-VAR DA Current complexity of NCEP model suite Regional Hurricane Waves Wave. Watch III NWPS GFDL WRF-NMM SURGE SLOSH Ecosystem Ew. E P-SURGE SLOSH Ocean 21 GFS Members Regional NAM NMMB NOAH Dispersion HYSPLIT Short-Range Ensemble Forecast Air Quality WRF(ARW, NMMB, NMM) North American Ensemble Forecast System GEFS, Canadian Global Model North American Land Surface Data Assimilation System NOAH Land Surface Model • Great Lakes (POM) • N Gulf of Mexico (FVCOM) • Columbia R. (SELFE) • Chesapeake (ROMS) • Tampa (ROMS) • Delaware (ROMS) • San Francisco (FVCOM) CMAQ High Res Windows WRF(ARW, NMMB) NEMS Aerosol Global Component (NGAC) GFS & GOCART Space Weather ENLIL 3 D-VAR DA Global Ensemble Forecast System (GEFS) ADCIRC Regional Bays Rapid Refresh 3 D-VAR DA Global Forecast System (GFS) Global Spectral NOAH ESTOFS 3 D-VAR DA 3 D-En-Var DA HYCOM High Resolution RR WRF ARW 4

Unification around Finite-Volume Dynamical Core on the Cubed-Sphere (FV 3) Source: GFDL

Unification around Finite-Volume Dynamical Core on the Cubed-Sphere (FV 3) Source: GFDL

FV 3 -GFS Q 3 FY 18: Initial performance evaluation with beta release to

FV 3 -GFS Q 3 FY 18: Initial performance evaluation with beta release to field. Configuration similar to GFS Q 2 FY 19: Increase model resolution to approximately 9 km and 127 levels, implement advanced and scale-aware physics, perform retrospective and realtime evaluation of various configurations, conduct pre-implementation testing and evaluation, and prepare model for transition to operations in Q 3 FY 19

Advanced scale-aware physics Targeting improvements in microphysics, scale-aware convection, boundary layer and shallow convection

Advanced scale-aware physics Targeting improvements in microphysics, scale-aware convection, boundary layer and shallow convection treatment, stationary and non-stationary gravity wave drag, land surface model, and treatment of radiation

FV 3 -GEFS Q 3 FY 18: Determine ensemble configuration (e. g. , number

FV 3 -GEFS Q 3 FY 18: Determine ensemble configuration (e. g. , number of members, resolution, coupling to other earth-system components, extension of forecast from 16 to 35 days). Q 2 FY 19: Complete approximately 20 -year reanalysis using ESRL/PSD’s 20 -year atmospheric reanalysis project Q 3 FY 19: Complete approximately 20 -year reforecast Q 4 FY 19: Transition to operations

FV 3 -SFS (Seasonal Forecast System; renaming CFS) Q 3 FY 18: Prototype a

FV 3 -SFS (Seasonal Forecast System; renaming CFS) Q 3 FY 18: Prototype a 9 -month, coupled SFS Q 1 FY 20: Freeze system and begin 30 -year reanalysis and reforecast Q 1 FY 22: Operational implementation

Convection-allowing models

Convection-allowing models

HREFv 2 CONUS membership -12 0 +12 +24 +36 Hires. W - ARW Hires.

HREFv 2 CONUS membership -12 0 +12 +24 +36 Hires. W - ARW Hires. W - NMMB NAM CONUS NEST HIRESW - “mem 2” ARW similar to NSSL WRF 8 convection-allowing members with approximately 3 -km resolution Source: Matt Pyle 11

HRRR 18 Z 24 October 2017 analysis SLP (contours; h. Pa), 250 -h. Pa

HRRR 18 Z 24 October 2017 analysis SLP (contours; h. Pa), 250 -h. Pa wind magnitude (fill; kt), and 10 -m, 850 -h. Pa, and 500 -h. Pa winds (barbs; kt) SLP (contours; h. Pa), 10 -m winds (barbs; kt), and 2 -m dew point (fill; F) 500 -h. Pa geopotential heights (contours; dam), winds (barbs; kt), and absolute vorticity (fill; 10− 5 s− 1) Surface-based CAPE (fill; J kg− 1) and CIN (hatched; J kg− 1)

Composite reflectivity (d. BZ) Storm reports in Albany occurred around 19 Z 19 -h

Composite reflectivity (d. BZ) Storm reports in Albany occurred around 19 Z 19 -h HREFv 2 forecasts Marginal severe threat, but highest updraft-helicity probabilities correspond with severe reports

36 -h HREFv 2 precipitation Arithmetic mean Probability matched mean Average of arithmetic and

36 -h HREFv 2 precipitation Arithmetic mean Probability matched mean Average of arithmetic and probability matched

May 18 Upstate NY Observed radar loop Source: Mike Evans

May 18 Upstate NY Observed radar loop Source: Mike Evans

00 Z HREFv 2 probabilities valid 21 Z Source: Mike Evans

00 Z HREFv 2 probabilities valid 21 Z Source: Mike Evans

Fog in Foxborough, Massachusetts 22 October 2017 Charles Krupa/AP Photo

Fog in Foxborough, Massachusetts 22 October 2017 Charles Krupa/AP Photo

14 March 2017 snowstorm Snowfall gradient across Long Island New Jersey

14 March 2017 snowstorm Snowfall gradient across Long Island New Jersey

PROB SN PROB IP MARCH 14 STORM HREFv 2 sniffs out ZR threat in

PROB SN PROB IP MARCH 14 STORM HREFv 2 sniffs out ZR threat in DCA-BWIILG corridor and mix into PHL PROB ZR Source: Geoff Manikin

PROB SN PROB IP HREFv 2 shows that DCA-PHL corridor will not remain all

PROB SN PROB IP HREFv 2 shows that DCA-PHL corridor will not remain all snow; lesser hint for NYC PROB ZR Source: Geoff Manikin

Future HREF (will become Rapid Refresh Forecast System) HREFv 2 is the baseline against

Future HREF (will become Rapid Refresh Forecast System) HREFv 2 is the baseline against which other ensemble systems up for consideration will be tested Rapid Refresh Forecast System (RRFS): Single core, FV 3, convection-allowing ensemble running hourly. Some runs to 18 hours, some to 36, some to 72 FY 18: Test FV 3 at CAM resolutions with CAM physics. Prototype ensemble DA FY 19: Choose FV 3 configuration for Rapid Refresh Forecast System (RRFS), continue developing ensemble DA and CAM physics. Implement next version of HREF with added FV 3 and HRRRv 3 members FY 20: HRRRv 4 implemented with ensemble DA. All ARW development ends with HRRRv 4 implementation. Create initial FV 3 CAM ensemble forecasts for RRFS FY 21: Year of preparation for RRFS implementation (e. g. , getting all products in place and finalizing ensemble size) FY 22: Operational implementation of RRFS

Summary Exciting time at NCEP as we aim to decrease production suite complexity while

Summary Exciting time at NCEP as we aim to decrease production suite complexity while increasing skill from seasonal to hourly forecasting