Front End Program 2012 L 1/L 2 Meeting FNAL October 20, 2011 Harold G.

Front End Program 2012 L 1/L 2 Meeting FNAL October 20, 2011 Harold G. Kirk Brookhaven National Laboratory

The Front End Sub-Systems Drift (π→μ) Buncher Rotator Cooler p π→μ FE Tar get

The Front End Sub-Systems Drift (π→μ) Buncher Rotator Cooler p π→μ FE Tar get Solenoid 18. 9 m Drift ~40 m Buncher ~33 m Rotator 34 m Cooler ~80 m Harold G. Kirk August 24 -26, 2010 MAP Review-Front End Harold G. Kirk 2 2

Major FY 11 Activities • • Contributed the IDS-NF IDR preparations and final document

Major FY 11 Activities • • Contributed the IDS-NF IDR preparations and final document (Many contributors) Installed Front End elements in a G 4 Bealine (Snopok) Confirmed G 4 Beamline and ICOOL correspondence for Front End performance (Snopok, Neuffer) Established improved set of Buncher/Rotator parameters (Neuffer) Harold G. Kirk 3

Outstanding Front End Issues • • Front End rf parameters are based on undemonstrated

Outstanding Front End Issues • • Front End rf parameters are based on undemonstrated performance levels Buncher/Rotator parameters may not be optimal for Muon Collider applications Radiation protection for Front End elements are lacking Multi-parameter (>100) environment makes optimization of performance difficult Harold G. Kirk 4

FY 12 Proposed Activities Investigate installation of Chicane/Absorber system to alleviate intense downstream radiation

FY 12 Proposed Activities Investigate installation of Chicane/Absorber system to alleviate intense downstream radiation issue (Snopok) Develop alternative Front End parameter sets consistent with demonstrated component rformance capabilities (Neuffer) Develop Front End a parameter set optimized for Muon Collider performance (Neuffer) Establish an optimizing strategy suitable for multiple parameter sets (Neuffer, Tech-X? , Muons Inc? ) * Support for IDS-NF RDR Costing Exercise ( Engineers) * * Requires additional resources beyond budgeted 2. 1 FTEs Harold G. Kirk 5

FY 12 Resources Request FTEs Scientific 2. 1 (BNL 0. 9; FNAL 0. 6;

FY 12 Resources Request FTEs Scientific 2. 1 (BNL 0. 9; FNAL 0. 6; Other 0. 6) Engineering 0. 4 (FNAL? , M&S ? ) M&S $75 K (Tech-X? , Muons Inc. ? , Other? ) Contingencies: 20% Increase Engineering FTEs 0. 4 0. 8 20% Decrease Engineering FTEs 0. 4 0. 0 Beyond Core Budget Harold G. Kirk 6