TDR & TP writing assignment • Kick off meeting of the editors is taking

TDR & TP writing assignment • Kick off meeting of the editors is taking place today (https: //indico. fnal. gov/event/15952/) to define: – – Guideline principles Structures and templates milestones Rob Pluncket is participating on behalf of the HVS consortium (SP) • Meanwhile we started assembling a draft of the outlines for SP far detector. – Available in overleaf: https: //www. overleaf. com/docs/12656145 wqxknnztcnjw/invit es/5 d 471 fb 4 e 37236 fd 526116124 dd 3 c 170 – It follows the structure of the Proto. DUNE FC/CPA documents – In the following weeks we will start assigning writing responsibility with Rob contacting the WG group leaders • Still need to define editor of the DP

Consortia deliverables • Construction Schedule: – should map to the developed WBS structure –

Consortia deliverables • Construction Schedule: – should map to the developed WBS structure – To be developed at the conceptual-level as part of the ongoing planning process • Two additional consortia deliverables for the next LBNC meeting (February 19 -21): – Documentation of Requirements/Specifications associated with each detector subsystem: a one-page spreadsheet from each consortia summarizing the targeted specifications of their subsystem and how these tie into physics requirements – Initial documentation of major risks associated with the development and construction of each subsystem: an additional one-page spreadsheet from each consortia summarizing their top few risks and potential approaches for mitigation – To be handle in a relatively simplistic manner in order not to interfere with the other critical consortia efforts focusing on the Technical Proposal – be approached from a bottoms-up manner (these are our specifications and these are the requirements that influence them) • We will prepare a draft and ask the WG groups for contributions

DUNE collaboration meeting • Several parallel sessions foreseen for the upcoming collaboration meeting (1.

DUNE collaboration meeting • Several parallel sessions foreseen for the upcoming collaboration meeting (1. 5 hours each): – – – 8 Physics 8 Proto. DUNE: 1 SP FC/CPA, 1 DP Cathode/FC 8 Far detector consortia: 1 HVS consortium 3 Near detector 2 Calibration Task Force 2 Software and computing • Draft preliminary proposal (to be discussed/improved): – HVS consortium: • Overview of SP far detector CPA/FC/HV system • Overview of DP far detector Cathode/FC/HV system • R&D activity for 2018 -2019 – Proto. DUNE SP FC/CPA • Status of assembly, installation, QA/QC • Beam plug and 35 tin tests • Plans for operations – Proto. DUNE DP FC/Ccathode • To be defined with DP members