Flowers for Algernon published in 1959 By Daniel
“Flowers for Algernon” published in 1959 By Daniel Keyes p. 22
Flowers for Algernon • When do you give someone flowers?
I q test
Iq test
Parallel episodes • Certain elements of the plot are repeated. • Three wishes • Three pigs • Goldilocks- three beds, three…
Subplots • A minor plot that relates in some way to the major plot. • Algernon/Charlie • Charlie/Miss Kinnian
I. Q. operation • If we could alter people’s I. Q. , should we?
Journal • If you could only be one or the other, would you be smart and not popular, or popular and not smart? • What would be the advantages? • What would be the disadvantages? • Smart: ______ • Popular: ____
Journal Entry • What is something your really want or wish for in life? Why? Write 5 sentences.
Journal Entry #3 • What makes a child become an adult?
Journal entry #4 • Write about an event that happened two separate times in your life? • How were they similar? • How were they different?
Misled-fooled; led to believe something wrong • Mis means wrong • Mis misled, mistake • Not allowed mistaken, mistaking, mistook • Miscelleaneous
Mis- BAD or wrong misled misnomer (lightning is a misnomer misadventure for a slow, old horse. ) misanthrope (hater of mankind) misogamist (hates marriage) misapplication misapply misplace misapprehend (misunderstand) misprint misbegotten (gotten unlawfully) mispronounce misbehave misrule misbelieve misspell misbrand misspent miscall mistake Miscarriage misstep miscarry mistrust miscast miscegenation (intermarriage) misunderstand miscellaneous mislay mischance misuse
mischievous misconceive misconduct misconstrue miscue misdate misdeal misdeed misdemeanor misdirect misdoer misdoing misdoubt misemploy miserable misfeasance misfire misfit misfortune misguide misgive/ misgivings misgovern mishandle mishap misinform
Tangible-adj. capable of being seen or felt • I need tangible proof of your love.
Refute-v. prove wrong using evidence • He tried to refute the answer by showing a different approach to the math problem. • Re means again • Repeat, rebound
Invariably- always • Invariably, Serena offers to pass out papers. • Invariably, my dog barks when he hears a motorcycle. • “You always leave your clothes on the floor. ”
Regression n. return to an earlier or less advanced condition • • • • • re - again reassure rebate rebel react reassert rebirth receive recall recommence recollect reconsider recovery recoup redirect recur refrain
recur refrain regain reheat reissue rehash rematch remarry replicate repay reorder reschedule restart reschedule retake return review reverse rebound rewire redress rework resurface
Verified- v. confirmed • Confirmed • Trust but verify- Ronald Reagan
Obscure- v. hide
Deterioration- n. used as adj. worsening; decline • My friend was feeling better, so they released her from the hospital; unfortunately. her health deteriorated and she was readmitted.
Hypothesis n. theory to be proved • Ms. Verge’s hypothesis proved true.
Introspective- adj. looking inward • People who keep a diary or a journal tend to be introspective. • Intro- inside • Spect- to look
Progress report March 5, 1965 List 5 things you know about Charlie 1. 2. 3. 4. 5.
Progress report March 5, 1965 List 5 things you know about Charlie 1. Charlie Gordon 2. Age 37 3. He wants to be smart 4. He doesn’t seem smart because of spelling and simple sentences; choppy 5. Birthday- two weeks ago
Exposition- beginning
March 5, 1965 • “My name is Charlie Gordon. I am 37 years old and two weeks ago was my birthday”(23). • What can you infer about Charlie?
March 6 Progress report #2 • Concrete vs. abstract thought • Roschach Test tests your imagination.
Rorschach Test (inkblot test) • Progress Report 2 • The first time Charlie takes the Rorschach test, he has no imagination and he is afraid to fail. No abstract thoughts.
What do you see?
Why does he have a rabbit’s foot?
What can you infer? • For example, Charlie quits his job after 840 people sign a petition to have him • fired. He wonders, “What did I do to make them hate me so? ”(38).
What can you infer? • He sid Ernie for godsake what are your trying to be a Charlie Gordon. I don’t understand why he said that. I never lost any packages” • (29)
• “Everybody laffed and we had a good time and they gave me lots of drinks and Joe said Charlie is a card when hes potted”(30).
Add commentary • “I never knew that Joe and Frank and the others liked to have me around all the time to make fun of me” (34).
Dr Nemur Age 60 Publish NOW! Not a genius Does not know Chinese or Hindustani Wants fame and to publish now My experiment My research Opportunist Shrew of a wife Wants to be Chair of Psychology at Princeton Uncomfortable around Charlie, inferiority complex.
• Dr. Strauss • age 50 • Wait to publish • genius yet limited • only speaks 3 ancient languages Latin, Greek, Hebrew • wait to publish • He found Charlie • His technique, • He performed the operation
Theme-universal and timelss • • • The deeper meaning is called theme. What the writer believes about life How do I find theme? Look at title See how the characters change (dynamic vs. static) • See the big moments. What relevations about life are suggested. • See the resolution • Write theme in a full sentence.
- Slides: 40