Final Project Plan P 09701 Corning Tropel Light

  • Slides: 20
Download presentation
Final Project Plan P 09701 – Corning Tropel Light. Gage™ Metrology System Matthew Bradley

Final Project Plan P 09701 – Corning Tropel Light. Gage™ Metrology System Matthew Bradley (ME) Images Courtesy of Corning Tropel EDGE™

Planning • • Mission Statement Staffing Requirements IP Considerations Preliminary WBS Team Values and

Planning • • Mission Statement Staffing Requirements IP Considerations Preliminary WBS Team Values and Norms Grading and Assessment Scheme Required Resources Planning Concept Development Issues & Risks EDGE™

 • Mission Statement …to develop a system around the Light. Gage sensors that

• Mission Statement …to develop a system around the Light. Gage sensors that would allow for both sides of an object to be measured automatically and simultaneously. In order to achieve this, two LG sensors will be aimed at one another. Again, a maximum part diameter of 40 mm will be used for the dual-headed system. The team will need to develop a fixture capable of supporting the two heads as well as the part being measured, to the tolerances and specifications agreed upon. Planning Concept Development Issues & Risks EDGE™

 • Mission Statement Which means: Convert 1 st generation Light. Gage System… …Into

• Mission Statement Which means: Convert 1 st generation Light. Gage System… …Into 2 nd generation Light. Gage System Images Courtesy of Corning Tropel Planning Concept Development Issues & Risks EDGE™

 • Staffing Requirements Name Discipline (qty) TBD Student Mechanical Engineering (2) TBD Student

• Staffing Requirements Name Discipline (qty) TBD Student Mechanical Engineering (2) TBD Student Electrical Engineering (2) TBD Student Industrial & Systems Engineering (1) Planning Concept Development Issues & Risks EDGE™

 • Staffing Requirements Role / Skills: Mechanical Engineering (2) • Students will be

• Staffing Requirements Role / Skills: Mechanical Engineering (2) • Students will be involved extensively in mechanical design, documentation, and fabrication for the 2 nd generation Light. Gage. Areas of focus include materials research and selection, thermal and structural analysis, and aiding in part/motor selection. Technical drawing packages, computer models, and bill of materials will need to be generated. Students will also aid in system integration and manufacturing documentation. Those interested in materials, fabrication, and vibrations analysis may find this project appealing, as environmental isolation and material selection is critical to the success of this project. An eye for detail will also be valuable to this project. Planning Concept Development Issues & Risks EDGE™

 • Staffing Requirements Role / Skills: Electrical Engineering (2) (1) • Students will

• Staffing Requirements Role / Skills: Electrical Engineering (2) (1) • Students will be asked to perform electrical system design for the 2 nd generation Light. Gage Metrology System. Tasks include circuit design, simulation, and testing, part selection (motors, power supplies, etc. ), as well as extensive hardware/software integration. Students will be involved in extensive computer interfacing and programming—adapting Corning Tropel’s Light. Gage software and control system to work with new hardware. Other tasks include system verification, debug, and electrical system documentation. Planning Concept Development Issues & Risks EDGE™

 • Staffing Requirements Role / Skills: Industrial & Systems Engineering (1) • Student

• Staffing Requirements Role / Skills: Industrial & Systems Engineering (1) • Student will be asked to perform an array of tasks for this project, including feasibility and manufacturability studies, materials research and selection, and technical documentation. Due to the user-intensive nature of this Light. Gage system, ergonomics and ease-of-use assessments will be very important, and need to be implemented in the design. There will also be a focus on experimental design and planning in an effort to determine how the product will be tested for accuracy, repeatability and reproduceability of measurements. Student may be called on to aid in fabrication of final prototype and system integration. Planning Concept Development Issues & Risks EDGE™

 • Intellectual Property Considerations • Due to the commercial nature of this project,

• Intellectual Property Considerations • Due to the commercial nature of this project, this issue is hard to resolve. • However, an agreement between Corning Tropel and RIT must be made before this project can run. Planning Concept Development Issues & Risks EDGE™

 • Preliminary Work Breakdown Structure Light. Gage Gen. 2 Complete Design Complete –Design

• Preliminary Work Breakdown Structure Light. Gage Gen. 2 Complete Design Complete –Design Approved –Mech. Design Complete –Risk Analysis Complete –Detailed specs. Approved –Drawing package complete –Design Reviewed –Materials Selected –Suppliers Identified –Needs Understood Documentation Complete –Drawing package complete –To Corning Standards –Materials Selected –Suppliers Identified –Parts Selected –Design Complete/Approved Prototype/P. O. C. Built Design Verified/Approved –MSDI Complete –Prototype/P. O. C. built –Test Plan Complete –Debugged –Components Built/Back from manufacturer –Mechanical –System integration complete –Computer –Mechanical sys. Built –Electrical sys. Built –Final budget/costs tallied and approved –Parts received from Corning Tropel –All resources for MSD 2 present –Parts fabricated –Electrical –Optics –Corning Tropel Repeatability Tests Passed –Accuracy demonstrated –Repeatability demonstrated –Product Approved by Customer –Meets customer specs/expectations Planning Concept Development Issues & Risks EDGE™

 • Team Values and Norms • See EDGE… Planning Concept Development Issues &

• Team Values and Norms • See EDGE… Planning Concept Development Issues & Risks EDGE™

 • Grading Assessment Scheme • TBD… Planning Concept Development Issues & Risks EDGE™

• Grading Assessment Scheme • TBD… Planning Concept Development Issues & Risks EDGE™

 • Required Resources • Faculty • Environment Planning Concept Development Issues & Risks

• Required Resources • Faculty • Environment Planning Concept Development Issues & Risks EDGE™

 • Required Resources • Equipment • Budget… Still a work in progress Planning

• Required Resources • Equipment • Budget… Still a work in progress Planning Concept Development Issues & Risks EDGE™

Concept Development • Identify Customer Needs • Establish Target Specifications Planning Concept Development Issues

Concept Development • Identify Customer Needs • Establish Target Specifications Planning Concept Development Issues & Risks EDGE™

 • Identify Customer Needs Planning Concept Development Issues & Risks EDGE™

• Identify Customer Needs Planning Concept Development Issues & Risks EDGE™

 • Establish Target Specifications Planning Concept Development Issues & Risks EDGE™

• Establish Target Specifications Planning Concept Development Issues & Risks EDGE™

 • Establish Target Specifications Planning Concept Development Issues & Risks EDGE™

• Establish Target Specifications Planning Concept Development Issues & Risks EDGE™

Issues & Risks • • Budget—project could get very expensive Corning Tropel’s product development

Issues & Risks • • Budget—project could get very expensive Corning Tropel’s product development timeline Possible IP issues Finding MSD team members Planning Concept Development Issues & Risks EDGE™

Outstanding Items • • Need to revise/finish MSD schedule Detailed Work Breakdown Structure Need

Outstanding Items • • Need to revise/finish MSD schedule Detailed Work Breakdown Structure Need to edit Team Values and Norms Work on Grading and Assessment Scheme EDGE wrap-up (~95% complete) Work on budget specifics Talk to customer about the possibility “dumpster diving” EDGE™