FINAL DESIGN REVIEW OF ITER PBS 45 CODAC
FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1 CODAC Services – DDD (4. 6) ITER Organization CHD/CSD/CDC ITER_D_MBSQD 4 Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 1
Content 1. 2. 3. 4. Introduction What is it? What is it for? What are the main features? Conclusion Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 2
Content 1. 2. 3. 4. Introduction What is it? What is it for? What are the main features? Conclusion Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 3
Introduction – link with CODAC Functional Breakdown One of the main functions of CODAC Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 4
Introduction – link with the Physical Architecture CODAC Services Distributed Architecture* * Mini-CODAC provides minimal versions of CODAC services which are sufficient for local I&C development and testing Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 5
Introduction – link to the software architecture Reduced View for Operation • The CODAC services are presented here from an operational point of view with the operator interface, the alarm handling & health monitoring, and the electronic logbook and log monitoring Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 6
Content 1. 2. 3. 4. Introduction What is it? What is it for? What are the main features? Conclusion Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 7
What is it? What is it for? CODAC Services at Final Design Level ü The Operator Interface: Interface tools for developing and running the graphical interface used to interact with plant system I&C processes ü The Alarm System: System tools to handle abnormal situations reported by the plant system I&C processes ü The Health Monitoring Ø The Electronic logbook: logbook tools for recording planned and unplanned events during operation and tests Ø The Automation of plant commands defined with state machines, scripts or “scans” Ø The Log Data Monitoring: Monitoring collection and analysis Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 8
Content 1. 2. 3. 4. Introduction What is it? What is it for? What are the main features? Conclusion Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 9
What are the main features of the Runtime Operator Interface? 2. 1. The OPI display connects isnotifies loaded and the subscribes on OPI an operator to of EPICS terminal 3. Thedisplay CA gateway client each PVs via –the accessand/or gateway change PVchannel value change alarm status/severity change Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 10
What are the main features of the Alarm System? 6. An 1. 2. 3. 4. 5. Stores Notifies Subscribes Receives Alarm the Server, and updated other to EPICS treats implements clients reads alarm PVs of itsstate that the changes configuration also updated trigger in the some configuration alarms alarm treatments: from via state a database the database via alarm CBS 1 JMS: latching, channel to trigger alarm access an action, delay gateway and store count, an alarmmaintenance filter, message in the mode… log RDB, annunciate the alarm, update the GUI Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 11
What are the main features of the Health Monitoring? • CODAC health monitoring controls that the CODAC control units (PSH, Fast Controller, Cubicle) are running properly – If the health of any of the components degrades, it generates an alarm and warns the operator to take corrective action • It collects health statistics and resource utilisation data useful for maintenance and capacity planning • EPICS-based health monitoring framework includes a set of APIs and plant system I&C health synthesis logic Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 12
What are the main features of the Electronic Logbook? It willlogbook The record planned will be used and to unplanned compile relevant events information about an activity so that the activity can be reproduced or so that key findings are documented for later use The electronic logbook tool currently integrated in mini-CODAC allows the: • Creation of entries with attachments - screenshots/images and any input files, • Insertion of automatic Content from the operator interface, data plot and alarm views, • Search for entries with syntax auto-completion Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 13
What are the main features of the Automation of Commands? Different techniques Scansmachines State Scripts -developed sequence developed in of the commands Python with the language executed State Notation by a dedicated Language server (SNL) (Scan Server) >> the for permanent can execution become complex of automation a scan (handling canofbe sequences monitored, of disconnection of paused, commands and resumed readback) and aborted Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 14
What are the main features of the Log Monitoring? Many The current log files adopted of different solution formats - Splunk distributed - collects on the many error machines and trace messages and generates reports and dashboards Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 15
Content 1. 2. 3. 4. Introduction What is it? What is it for? What are the main features? Conclusion Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 16
Conclusion • Most of these services are already used in production for the site electrical power distribution: – – – Operator Interface Alarm System E-Logbook Log collection and analysis Health monitoring • They have been deployed in the full CODAC distributed infrastructure Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January 2014 - Cadarache Page 17