Fiberglass Tank & Pipe Institute Presentation Double-Wall Tank Sump Session 2017 ASTSWMO May Meeting (May 23 -25, 2017)
Round DW Collars � 42” and 48” round collars � Accepts round base of sumps for rotation and precise alignment www. fiberglasstankandpipe. com
Polygon Sump Base � Bottom of polygon sump base transitions to round � Allows for precise adjustment of base so flat panels align with entry fittings and pipe runs www. fiberglasstankandpipe. com
8 -Sided Polygon Sump Bases � Both the 42” and 48” diameter sumps are 8 -sided � Allows for proper alignment of pipe and entry fitting for 90 and 45 degree couplings www. fiberglasstankandpipe. com
Drain/Test Fitting � Threaded fitting and plug � Designed for annual testing and demonstrating communication between tank collar and sump www. fiberglasstankandpipe. com
2 -Piece Design � Bottom section of polygon base is 2’ high � Avoids confined space entry � Makes installing pipe penetrations easier � Permits immediate pre-testing of entry penetrations www. fiberglasstankandpipe. com
Joint Options Adhesive Channels � Sumps are Layup Joint �connected Sumps arethrough factory installed connected through adhesive channels field installed layup withsupplied kit adhesive kit www. fiberglasstankandpipe. com
Watertight Lid �Manufactured out of fiberglass �No mechanical fasteners �Optional inspection port �Watertight gasket design www. fiberglasstankandpipe. com
Reservoir �Integral fiberglass reservoir that cannot be easily damaged during routine maintenance �PVC threaded opening �Convenient access to sensor www. fiberglasstankandpipe. com
Palletized Sumps � Sumps may be palletized for transportation and jobsite storage � Prevents damage in transit or on-site www. fiberglasstankandpipe. com
Double-Wall Tank Sumps Installation Material & Training
www. fiberglasstankandpipe. com
ASSEMBLY INSTRUCTIONS www. fiberglasstankandpipe. com
Assembly Instructions � Dry fitusing all sump components � If� Adhesive required, Joints trim sump – Sand body theextension surface that using will a When Adhesive Channel: � If the drain plug in the collar is removed, be �Contractor Field cuts must withinthe ±¼”mating of square � mustbe re-sand surfaces carbide contact tipped theany adhesive blade or achanges masonry blade � Determine length to insure the reducer fitting remains intact inwith the � Insert channel mesh material provided before adhesive or layup application �Gaps between two joints greater than ¼” minimum required clearance between sump collar bushing. only the ¼” drain plug. �The � Layup sump Joints body – Remove extension Sand a minimum is only component of 4” onto each adhesive kit 360° around each joint must be with a maximum ½” �Remove anycovered rocks, and/or debris fromwidth adhesive topcan and that part where beconcrete trimmed the layup will be applied tape channel �Confirm enclosure topare and reservoir are level �Ensure mating surfaces free of contaminants �Sand Maintain minimum of 4” on theuntil sumpwhite bodyin � and clean mating surfaces and dry sump reservoir and drain fitting are � Confirm extension to complete interior joint color located thecloth same side to facilitate �Wipe with on clean testing �Docommunication not use oil-based solvents, soap, or water to clean surfaces www. fiberglasstankandpipe. com
ADHESIVE & LAYUP INSTRUCTIONS www. fiberglasstankandpipe. com
Adhesive & Layup Instructions �Check date on Temperature Considerations: adhesive/layup container �After mixing adhesive and hardener, you no more than 20 minutes to �Notewill the have following datescomplete on the application before the resin begins to. Tank harden Double-Wall Sump Installation method for supplemental �Recommended Checklist: heat is to transform air to the tank sump �Date the kit was ignition sources away while keeping assembled �Date the kit was used www. fiberglasstankandpipe. com
Adhesive Joint �With the tank sump components in place, make two consecutive 360° passes around the tank sump filling the adhesive channel evenly using all adhesive www. fiberglasstankandpipe. com
Layup Joints � two joints greater ¼” must �Gaps Applybetween 3 layers of fiberglass layup, than saturated withbe covered with maximum width ½” tape toon prevent resin, 360° around tank sump, centered joint resin from running into joint www. fiberglasstankandpipe. com
ASSEMBLED TANK SUMPS www. fiberglasstankandpipe. com
Assembled Tank Sumps �All piping and electrical penetrations (supplied by others) must seal the tank sump annular space �Do not connect the tank sump annular space to any other annular space www. fiberglasstankandpipe. com
POST ASSEMBLY TEST www. fiberglasstankandpipe. com
Post Assembly Test Prior to backfilling: �The annular space may be pressure tested to a maximum of 3 psig during the installation �After pressurizing, apply a soap and water solution to the entire surface area on the inside and outside of the tank sump �Carefully inspect for leaks as indicated by continuous formation of bubbles �Maintain test pressure and continue inspection for 30 minutes. Then release pressure www. fiberglasstankandpipe. com
ANNULAR SPACE MONITORING www. fiberglasstankandpipe. com
Annular Space Monitoring Hydrostatically Monitored Annular Space �Monitoring solutions available �Brine – Calcium Chloride Solution �Propylene Glycol Solution Vacuum Monitored Annular Space �Vacuum monitoring may be used utilizing the factory installed fitting �Maximum continuous vacuum level shall not exceed 5 psig (10. 2”Hg) www. fiberglasstankandpipe. com
Annular Space Monitoring �Fill the tank sump with the required number of gallons of monitoring fluid www. fiberglasstankandpipe. com
Thank you Questions ? www. fiberglasstankandpipe. com