FERMILAB TEST BEAM FACILITY Aria Soha June 11
FERMILAB TEST BEAM FACILITY Aria Soha June 11, 2011 TIPP 2011
The Fermilab Test Beam Facility • World Class Facility • The only operating U. S. HEP Test Beam • Detector R&D focus • Since 2005: § § Experiments Collaborators Countries 32 experiments 464 collaborators 108 institutions 24 countries 2006 TIPP 2011 Institutions 2007 http: //www-ppd. fnal. gov/FTBF/ 2008 2009 2010 2
Location Fermi National Accelerator Laboratory TIPP 2011 Meson Detector Building – West http: //www-ppd. fnal. gov/FTBF/ 3
Beam Delivery MTest Main Injector P 3 ne P 2 ine L 1 P Tevatron TIPP 2011 Linac 8 Ge. V Line Li MCenter Booster SY 120 Line Neutrino Line • Booster captures protons into 84 bunches (1 batch) and accelerates them to 8 Ge. V • • Bunches are 19 nsec long • • Full batch is 2 E 11 protons • In Switchyard Septa Magnet splits beam to Mesonline (and Neutrinoline) 8 – 30 bunches are extracted to Main Injector (MI) (Partial Batch) Each batch is 0. 2 – 1. 6 μsec in length MI accelerates beam to 120 Ge. V Fraction of the beam resonantly extracted each rotation over 4. 2 sec to Switchyard http: //www-ppd. fnal. gov/FTBF/ 4
Particle Composition of Beam • • • 120 Gev Protons 2 - 66 Ge. V Pions 0. 5 – 32 Ge. V Electrons Broadband Muons If beam were smoothly extracted, 100 k. Hz or less would imply 1 particle per MI rotation would occur. Beam extraction is not smooth resulting in up to 35% double occupancy per MI rotation TIPP 2011 Beam Energy (Ge. V) Rate at Entrance to Facility (per spill) Rate at Exit of Facility (per spill) % Pions, Muons % Electrons 16 132, 000 95, 000 87% 13% 8 89, 000 65, 000 55% 4 56, 000 31% 67% 2 68, 000 28, 000 <30% >70% 1 69, 000 21, 000 <30% >70% http: //www-ppd. fnal. gov/FTBF/ 5
Operating • Test Beam makes up 5% of Fermilab’s HEP program • 6 sec event (4. 2 sec spill) every 60 seconds for 12 hours a day • Normal Operating Hours: 0400 – 1800 • Stop for Tevatron Fill (2 hrs) • Control room manned during beam hours TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 6
Facility Details • Multiple Control Rooms • Conference Room • Climate-controlled areas for experiments • Machine Shop • Several Work Rooms • Storage Rooms and Cabinets TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 7
Facility Details • Remotely controlled Motion Tables • Laser Alignment • State-of-the-Art, web-based Cameras • Helium Tubes • Gas Delivery • Signal and High Voltage cable patch panels TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 8
Facility Instrumentation • 2 Cerenkov Detectors • 2 Pixel Telescopes • 4 MWPC Tracking System • Time of Flight System • Lead Glass Calorimeters • TIPPAssorted Trigger http: //www-ppd. fnal. gov/FTBF/ scintillators 2011 9
Accommodating Users • In 2008, T-977 MINERv. A experiment requested ~200 – 1000 pions/spill, with momentum as low as 200 Me. V/c • They requested Fermilab build another beamline… TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 10
Tertiary Beamline Target/ Collimator TIPP 2011 TOF 1 WC 2 Spectrometer Magnets http: //www-ppd. fnal. gov/FTBF/ WC 3 WC 4 TOF 2 11
Tertiary Beam Details Plot of Fit Momentum vs. TOF; Shows: Separation of Species and Available Momenta • 60% pions, • 40% protons, • very few electrons, kaons, and deuterons. TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 12
Tertiary Beam Details • Rates: about 200 particles / 4 sec spill (~50 Hz) • Momentum Resolution: dp = 3% § multiple scattering limited for this momentum range • Bias: § MINERv. A design goal for bias is < 2%. § So far only 5% demonstrated • WC 4 can be moved to achieve lower or higher momentum § design momentum is 200 Me. V minimum TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 13
Schedule http: //www-ppd. fnal. gov/FTBF/schedule. html • Time still available for Aug/Sept 2011 • Fermilab Accelerator shutdown scheduled for March 2012 through February 2013 TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ (11 months) 14
Weekly Usage 52 48 44 40 36 32 28 24 20 16 12 8 4 0 Facility Use (%) Data Use (%) 100% Expt Data Taking* Double Occupancy 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 • *Experiment Data Taking Includes Double Occupancy • Facility Use includes Experiment Installation, Facility Tests, & Data Use, and is normalized to Beam Availability TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 15
Facility Expansion 8 Ge. V Line Main Injector P 2 ine L P 1 MTest Linac Booster SY 120 MCenter Neutrino Line ne P 3 Line Li Proton Line • New, Instrumentation Specialist • With the operation of the Sea. Quest Experiment FTBF can expect § 24 hours of beam time a day § Longer spill train, with same intensities • MCenter line start-up § Doubles the capacity of our facility for small users TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 16
MCenter User Area This section of beam pipe has been modified to have flanges and a bellows, so as to make it easily removable. TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 17
Facility Overview TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 18
Outreach • • • TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ opportunities for students to explore physics with hands on experience graduate and undergraduate students perform real beam tests with real equipment and detectors 19
FTBF Summary • Fermilab Test Beam Facility is an HEP Beam facility for world-wide Detector R&D • Flexible beam delivery § Protons, pions, muons, electrons, kaons § 200 Me. V – 120 Ge. V § 1 – 300 k. Hz intensities • Extensive facility infrastructure & instrumentation http: //www-ppd. fnal. gov/FTBF TIPP 2011 20
Additional Slides ADDITIONAL SLIDES TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 21
Meson Area Beamlines TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 22
Tertiary Beamline Proposal 1. 16 Ge. V pion beam hits a copper target and steel collimator at the entrance to MT 6. 2 2. Particles emerge at a 16 o angle 3. TOF 1 (Scintillator) 4. Wire Chamber 1 5. Wire Chamber 2 6. Spectrometer magnets to straighten beam 7. 8. Wire Chamber 3 9. Wire Chamber 4 10. TOF 2 (Scintillator) 11. MINERv. A detector TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 23
Beam Spot Size TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 24
Energy Resolution TIPP 2011 http: //www-ppd. fnal. gov/FTBF/ 25
- Slides: 25