Feb 2013 ABB SACE Maintenance Preventive Predictive Maintenance
Feb 2013 ABB SACE Maintenance Preventive & Predictive Maintenance
Maintenace Agenda Aim Mind-Changing Why maintaining Miths and Facts Estimated lifetime ABB SACE Maintenance portfolio: Maintenance with ABB SACE: Benefits Offer: Preventive Maintenance – PMP Predictive Maintenance -LEAP
Maintenace theory Aim: Mind-changing ‘’Any maintenace activity is a cost’’ The customer has to understand that performing a correct and periodic maintenance is essential to: - Reduce the total managing costs - Use the resources according to needs - Standard, directives and laws
Maintenace Theory Myths & Facts Common Myths • Circuit-breakers are E S maintenance FAL free Proven Facts • Circuit-breakers are protecting devices: periodical check on functionality and maintenance are required to guarantee the original performance level • Circuit-breakers Preventive E S is just L Maintenance A F dusting down • Circuit-breakers Preventive Maintenance consists in checking the integrity of all the electrical and mechanical components to limit aging on components and prevent faults • The circuit-breaker is always in closed Edoesn’t S position so it L FAany require maintenance • All the mechanical and electrical components need maintenance (as lubrication) in particular in harsh environments.
Maintenace Theory Why maintaining Direct costs Direct Costs • Maintenance: personnel, materials Indirect/induced Costs: Indirect costs • • • Higher risk in Health & Safety Reduction of products lifetime Management of urgency Poor quality Energy consumption Environmental impact Resource availabilities Inefficiency in personnel Insurance policies Production Losses in market share
Maintenace Theory Estimated lifetime Based on ABB experience, it is possible to define average component lifetimes BUT a SITE SURVEY is always recommended. It is performed by a circuit breaker specialist, who inspects the products, on-site spares, environment, fault history, etc. . . The result of a site survey is a proposal of short and long term maintenance actions
ABB SACE Maintenance Portfolio Maintenance with ABB - benefits ABB technicians are skilled and properly trained: § Before operating on the field spend at least 1 year in the production line § Regular courses to be updated on new products § By turns work in the internal assembly line for repair § Original Spare Parts § Right tools § Continuous communication between R&D/ Quality dep. and Service Knowledge on CB updates (modification for improvements)
ABB SACE Maintenance Portfolio ABB SACE offer (in accordance with EN 13306: 2010) Before a failure After a failure Maintenance Preventive Predetermined Corrective Conditioned - based Urgent Scheduled Predictive Deferred
ABB SACE Maintenance Portfolio Preventive maintenance Before a failure Preventive Maintenance Conditionedbased Maintenance Predetermined Maintenance Scheduled Maintenance PMP Predictive Maintenance LEAP +PMP
ABB SACE Maintenance Portfolio Preventive and Scheduled Maintenance - PMP Reduce the risk of failure and working deterioration of the low voltage circuit-breakers installed in the plant It is structured in a cycle of three maintenance interventions: • 1 st-2 nd intervention: Ordinary Maintenance Maintaining the original integrity of the product: • Maintaining or restoring the efficiency of the products • Containing the normal deterioration of use • Guaranteeing the useful life of the product • Facing accidental events • 3 rd intervention: Extraordinary maintenance Extend the useful life and/or improve: • efficiency • reliability • productivity • facility of maintenance and inspection All interventions are carried out by chief skilled technicians
ABB SACE Maintenance Portfolio Preventive and Scheduled Maintenance for Emax Provides systematic and functional means of maintaining a specific breaker § Each ABB ACB series has its own schedule which is based on years of experience and knowledge of manufacturing and maintaining circuit breakers § Ordinary Maintenance Extraordinary Maintenance
ABB SACE Maintenance Portfolio Predictive maintenance: LEAP A system to optimize the efficiency of a New Emax CB with a periodical analysis of the aging level: § Monitoring of the health of the assets by means of data acquisitions § Recommendation of the required maintenance activities LEAP implements predictive maintenance algorithms § LEAP is integrated in FSM (Field Service Manager) for Service activities planning tool § © ABB Group November 23, 2020 | Slide 17
ABB SACE Maintenance Portfolio Predictive maintenance: LEAP is a condition based and predictive maintenance based on: § § © ABB Group November 23, 2020 | Slide 18 Inspection Monitoring on location and acquiring the normal operational parameters of the system Maintenance List of maintenance activities performed by the filed service engeneer: components substituted, cleaning, checks, test, … Analysis Studing and processing of the data gathered in the field, and establishing trend diagrams concerning efficiency and wear of the system that is monitored Report Generation of a detailed report that sums up the condition of the system inspected and the possible critical conditions
ABB SACE Maintenance Portfolio Predictive maintenance: LEAP Offers Predictive maintenance LEAP Easy AUDIT LEAP STAND ALONE LEAP + PMP
ABB SACE Maintenance Portfolio Predictive maintenance: LEAP Offers ABB Field Service Eng. / ABB certified partners ABB Personel LEAP Customer LEAP OFFERS Statistics Real Data Maintenance Multiple years Agreement © ABB Group November 23, 2020 | Slide 20 LEAP EASY AUDIT ree + LEAP AUDIT LEAP STAND ALONE PMP √ √ √ F √ √
ABB SACE Maintenance Portfolio LEAP Easy AUDIT (web) 1. User: Customer 2. Frequency: once for S/N / Customer 3. ACCESS: § Registration in ABB website § Login & Password § WEB Leap access 4. Limited Input data: § CB S/N, § Application segment, § Mech operations number, § Enviromental conditions 5. Maintenance: NO 6. Limited Report: - CBs factory data - Theoric CB life status 7. Free of charge
ABB SACE Maintenance Portfolio LEAP AUDIT 1. User: Service Promoters 2. Frequency: once for S/N / Customer 3. ACCESS: § Registration in ABB website § Login & Password § Leap access 4. Limited Input data: § Manual data § Automatic data from the TU 5. Maintenance: NO 6. Limited Report: - CBs factory data - Real CB life status 7. Free of charge
ABB SACE Maintenance Portfolio LEAP Stand Alone 1. User: ABB service technicians/ partners 2. Frequency: on demand 3. Data input: full set: = § Automatic data acquisition from the TU (PR 12 x) § Manual Data acquisition: § environmental, § application, § working conditions § maintenance carried out 4. Report and Analysis: • complete LEAP Report on selected CBs with maintenance • Limited LEAP report on remaining CBs without maintenance
ABB SACE Maintenance Portfolio LEAP + PMP 1. User: ABB service technicians/ partners 2. Frequency: PMP contracts: Heavy 6 months; Standard 12 months ; Light 18 months 3. Data input: full set: § Automatic data acquisition from the TU (PR 12 x) § Manual Data acquisition: § environmental, § application, § working conditions § maintenance carried out 4. Maintenance: YES according to the PMP program 5. Report: Complete with: § life analysis of the CB § suggested maintenance 6. Price: included into PMP
ABB SACE Maintenance Portfolio Architecture: LEAP + PMP USB Bluetooth or Ekip T&P Phase 2: Data Transfer and Elaboration Phase 1: LEAP CLIENT Automatic and manual Data acquisition WEB ADMINISTRATOR Phase 3: Data Analysis TECHNICIAN CUSTOMER Phase 4: Final report to Customer LEAP SERVER
ABB SACE Maintenance Portfolio LEAP: Data acquisition Automatic data acquisition Ekip Connect Software § Directly from Trip Unit of ACB: § CB type and relevant info § Electrical / Mechanical operations § Alarms / Trip History / Event logs § Number of operations (Open/Close) Manual data acquisition LEAP Client Software § Software for manual collection data § Electrical Plant Info § Enviromental data: • Temperature range/ Moisture / Saltness/ Dust level/ Corrosive level/ Altitude § Application data: Vibration/ Application/ Utilization/ Load Type/ Load Percentage
ABB SACE Maintenance Portfolio LEAP: Benefits § § § § § Circuit breaker efficiency/reliability preservation Extention of the CB life Guaranteeing the plant & people safety Probability of unwanted shut-downs reduction Providing the best management of maintenance costs § Direct costs: Direct maintenance : technicians, spare parts… § Indirect costs: non-production, accident, failure, maintenace management, … Customer support during all product life phases ABB professional competence guaranted: Preventive, predictive and corrective maintenance to increase: performances, reliability, availability of circuit breakers and systems Detailed and objective diagnostic for each circuit breaker Dedicated tool based on an ABB certified and unique algorithm
ABB SACE Maintenance Portfolio Summary § Maintenance management maximizes the value of circuit breakers and customers investments. § All the circuit breakers have aging and wearing in components: a proper preventive maintenance is required § Maintenance schedule specifies the recommended maintenance actions for preventive maintenance § LEAP Predictive maintenance: § detailed analysis of the CB aging § definition of specific actions to be performed § estimation of the residual life od the product.
- Slides: 24