f Accelerator Physics Center Status FNAL Steering Group

  • Slides: 11
Download presentation
f Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev

f Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev

f Fermilab’s Accelerator Physics Center Director Associate Director for Accelerators Accelerator Technical Division Physics

f Fermilab’s Accelerator Physics Center Director Associate Director for Accelerators Accelerator Technical Division Physics Division Center 2007 APC & Y 2 K – Shiltsev 2

f § § Accelerator Physics Center: Mission Coordinate and conduct accelerator R&D aimed at

f § § Accelerator Physics Center: Mission Coordinate and conduct accelerator R&D aimed at next-generation and beyond accelerator facilities Provide accelerator physics support for existing operational programs and the evolution thereof Train accelerator scientists and engineers Provide leadership and coordination in establishing the necessary facilities for a broad range of accelerator R&D that can be accessed by both Fermilab staff and the world HEP community 2007 APC & Y 2 K – Shiltsev 3

f APC: Organization Structure APC Head Admin. Support Theory, Experimental Beam Physics Design &

f APC: Organization Structure APC Head Admin. Support Theory, Experimental Beam Physics Design & Beam Education & Modeling Research Training 2007 APC & Y 2 K – Shiltsev 4

f APC: Components APC Head Admin Support ILC Beam Muon Collider Accelerator Physics R&D

f APC: Components APC Head Admin Support ILC Beam Muon Collider Accelerator Physics R&D Group Ph. D Program Theory & Modeling HINS Group LHC Accel. Syst. US Particle Accel. School Summer Student Energy Experimental Deposition AARD 2007 APC & Y 2 K – Shiltsev Acc. Phys. Program Peoples Fellows 5

f APC Status: Org Chart, Dates, etc 2007 APC & Y 2 K –

f APC Status: Org Chart, Dates, etc 2007 APC & Y 2 K – Shiltsev 6

f APC Status: Org Chart, Dates, Space, etc People: § APC offices will be

f APC Status: Org Chart, Dates, Space, etc People: § APC offices will be at : 35 Directly assigned 8 guests 8 grad students 4 joint appts. 26 in (…) Target date: June 1 st, 2007 Budget in work Ø WH 13 • • HQ (South X-over) Muon R&D (WH 13 E) Theory & Run II (WH 13 E) ILC (X-over and WH 13 W) CD CPA group (moved from WH 9 to WH 13 W) US PAS (WH 13 W) Grad students/visitors (WH 13 E) • • ED group LARP Mike Kriss ILC Ø WH 12 E Ø Transf, linac, X-glry, BTW: • HINS (Trsf Glry, X-, BTW) • Muon R&D (Linac Glry, BTW) • Theory/Run II (BTW) Ø TD • HINS, ILC, Muon magnets 2007 APC & Y 2 K – Shiltsev 7

f FNAL Steering Group: Charge § “…The group should develop a strategic roadmap of

f FNAL Steering Group: Charge § “…The group should develop a strategic roadmap of accelerator-based HEP that: Ø supports the international R&D and engineering design for as early a start of the ILC as possible and supports the development of Fermilab as a potential host site for the ILC; Ø develops options for an accelerator-based high energy physics program in the event the start of the ILC construction is slower than the technically-limited schedule; and Ø includes the steps necessary to explore higher energy colliders that might follow the ILC or be needed should the results from LHC point toward a higher energy than that planned for the ILC. “ § Y. K. Kim to chair the Steering Group. § SG's report should be delivered to P. Oddone by Aug. 1, ‘ 07 2007 APC & Y 2 K – Shiltsev 8

f FNAL Steering Group: Membership § Consultants: Neutrino physics group (8) + Flavor physics

f FNAL Steering Group: Membership § Consultants: Neutrino physics group (8) + Flavor physics group (9) + Guests (11) = Do. E, ILC, etc 2007 APC & Y 2 K – Shiltsev 9

f SG work: § http: //www. fnal. gov/directorate/Longrange/Steering_ Public/index. html § Weekly meetings (5

f SG work: § http: //www. fnal. gov/directorate/Longrange/Steering_ Public/index. html § Weekly meetings (5 so far), satellite meetings, etc Webex § Two “in person” meetings – in June and July § Long list of possible facilities was pulled together at the very first meeting (16), started to sort things out § At the last meeting, 4 sub-groups were formed: Ø #1 and #2: Neutrino and Flavor Physics Ø #3 Accelerator Facilities (S. H. and all accel fellas) Ø #4 HEP colliders beyond ILC (Helen, Maury, VS) § Besides that – off-the-box discussions encouraged (YKK lunches, DM, VS, SN among AD and TD, etc) – please speak up! 2007 APC & Y 2 K – Shiltsev 10

§ § § f Status: we’ve discussed ILC and ILC test facilities Ø T.

§ § § f Status: we’ve discussed ILC and ILC test facilities Ø T. Himel (SLAC), S. Ozaki (BNL), S. Nagaitsev (FNAL) Ø sure – need NML like facility Ø under discussion – 2% demonstration facility (5 Ge. V SC RF linac) How to recycle existing facilities Ø D. Mc. Ginnis (FNAL) Ø Most you have heard of (>1 MW neutrino, m 2 e, Recycler boomerang) Ø New (Syphers): Tevatron as stretcher ring +SC RF separation = factor of 100 best koan physics facility LHC and LHC upgrades: Ø S. Peggs (BNL) – lumi upgrades and LARP and IRUP Ø V. Shiltsev (FNAL) – DLHC (double energy upgrade) Muon Collider and neutrino factory: Ø S. Geer (FNAL) on current activities and short term plans of MCTF and NFMCC Ø V. Shiltsev (FNAL) on large scale muon complex vision VLHC-I and VLHC-II: Ø V. Shiltsev (FNAL) on design work, R&D needed Ø SF machine in Tev tunnel - ? 2007 APC & Y 2 K – Shiltsev 11