EVS-06 -09 e EVS gtr task force 4 (REESS in use test ptotocol) status

EVS-06 -09 e EVS gtr task force 4 (REESS in use test ptotocol) status report Telcon 03. 11. 2014

EVS gtr task force 4 telcon 03. 11. 2014 status report Actions 2014/2015: 01

EVS gtr task force 4 telcon 03. 11. 2014 status report Actions 2014/2015: 01 -11/14 Discussion (5 phone calls and two face 2 face meetings of the TF group) § Improving of the TF draft regarding procedure and requirement § Development of aditional draft proposals regarding 48 V in use, post crash and working voltage definition and providing them to the IWG for further discussion 11/14 status report to the informal group, providing a current TF draft to the IWG (version 10) 01 -12/15 ongoing discussion about open issues additional face to face meeting are be necessary - reviewing test procedures - reviewing rationales - enabling the draft for all certifcation systems 12/15 closing the discussion (based on the comments available today) and provide a final report to the informal group

EVS gtr task force 4 (REESS in use test ptotocol) gtr meeting Washington 12.

EVS gtr task force 4 (REESS in use test ptotocol) gtr meeting Washington 12. 05. 2014 status report Main open items: § Vibration: consideration of ISI 12405 and rediscussion if new informtion is available § Thermal cycling: max. temperature, thermal stabilization time § Mechanical shock: post test requirement § Mechanical integrity: application of crush force, directions to be considered § Short circuit: required resistance § Enable REESS test protocol to all approval systems