Domino Sugar �Refinery is in Arabi, La �Produce 8 million pounds of sugar per day on average �It is the third largest sugar refinery in the world
Domino Sugar
Evaporator Optimization Project �Steam is one of the most expensive resources for a refinery • Take the current operation of the evaporators and make it more efficient • Take the current operation of the melters and eliminate the steam
Evaporators � Evaporator uses steam in a vacuum to heat the sugar liquor and lower its density � Left over vapors from this process is what we are trying to optimize
Melter �Takes the raw sugar and uses steam to melt this sugar into a liquid. �It uses direct steam injection �Vapors from evaporator will be rerouted to power the melter
Current Operation
Current Operation
Deliverables � Sketch of future operation (Nov) � Energy of vapors (Nov) � Vapor Flow Rate (Nov) � Energy Required to melt sugar (Nov) � Residence time of melters (Dec) � Design new melter (Dec) • Designing the new melters based on energy requirements and availability � Design condenser (Dec) • Flow Rates, Pressure and Temperature Differences • Energy Transfer
Deliverables �Design • • Vapor and liquor Pipeline (Dec) Determine pipe size Stress Analysis Material Selection Minimize Energy Loss �Design Heat Exchangers (Feb) • Size of Heat Exchangers • Materials of Heat Exchangers • Energy Transfer
Deliverables �Design Pipeline Support Structure • Deflection • Stress Analysis on Structure • Distance between supports • Material Selection �COMSOL (March) • Pipeline stress analysis • Structural Support Stress Analysis • Pipeline Deflection • Beam Deflection (Feb)
Deliverables �Design New System Layout (March) • ACAD Sketch • Instruments Selection • Space Requirements �Control Sequence (April) • Safety • Ladder Logic (PLC)
Deliverables �Cost Analysis (April) • Yearly savings from cutting down steam consumption �Project Cost (April) • Cost of New Materials and Machines • Cost of a Contractor installing all Materials and Machines
James Project Responsibilities �Sketch of Future Operation �Energy Required to Melt Sugar �Residence Time �Design Melters �Design Sugar Liquor Pipeline �Design Structural Support System �COMSOL �Design New System Layout �Control Sequence
Bryan’s Project Responsibilies �Sketch of Future Operation �Energy of Vapors �Vapor Flow Rate �Design Condenser �Design Vapor pipeline �Design Heat Exchanger �COMSOL �Design New System Layout �Cost Analysis, Project Cost Analysis