PBN - Where are we now? • Current PBN concept – Globally harmonized navigation specification based on existing national or regional requirement – Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation 02 July 2012 page 2
PBN - Where are we now? • PBN concept developments – Builds on existing requirements – Adds new specifications to address operational requirements – Curtails the proliferation of number of navigation specifications • Updated PBN Manual (Advance copy): – 1 st week of July 2012 02 July 2012 New E dition page 3
PBN - Where are we now? • Updated PBN Manual - highlights • RNP 2 – High continuity (typically oceanic/remote applications) – Low continuity (typically continental applications) • RNP 0. 3 – Intended for slow moving aircraft • • • 02 July 2012 Radius-to-fix (RF) (terminal and approach) Fixed Radius Transitions (FRT) (en-route) Advanced RNP (umbrella navigation specification) High level ops approval guidance Improved implementation process description page 4
Advanced RNP Optional Performance/Functionality RNP Scalability RNP 2 oceanic/remote Fixed Radius Transition (FRT) Time of Arrival Control Barometric VNAV A-RNP + options A-RNP RF legs Parallel offset RNAV holding RNAV 1 RNAV 2 02 July 2012 Continental en-route: RNP 2, 1 Final approach: RNP 0. 3 RNAV 5 RNP 1 RNP APCH RNAV 10 RNP 4 page 5
Just Published Flight Validation 02 July 2012 page 6
Validation Process 02 July 2012 page 7
ATM / Airspace Planning and Design Support • Continuous Climb Operations (CCO) Manual – Advance copy by July 2012 • PBN Airspace Concepts Manual – Advance copy by July 2012 • ilearn information/workshop package on PBN airspace design – August 2012 02 July 2012 page 8
Flight Operations Support • PBN Operations Approval Manual – Under review by PBN Operations Approval Tiger Team – Advance copy by September 2012 • ilearn information/workshop package on PBN Operations Approval – September 2012 02 July 2012 page 9
PBN General • PBN Manual next edition – Advance copy July 2012 • ilearn information/workshop package on PBN overview – September 2012 • Online PBN implementation status tool – September 2012 02 July 2012 page 10
PBN General • PBN Implementation toolkit addressing: – Executives – Regulators – ANSPs – Aircraft operators – Manufacturers • September 2012 02 July 2012 page 11
PBN General Instrument Flight Procedures (a summary) • Criteria to support new edition of PBN Manual • Improved Baro-VNAV criteria • Helicopter criteria • Sample charts – State Letter after IFPP/11 (December 2012) 02 July 2012 page 12
PBN General (Planning) • ilearn information/workshop/training package on PBN for other domains – ATC – Pilots – Flight validation • Endorsement programme for service providers 02 July 2012 Planning page 13
PBN General (Planning) • Collision Risk Model for PBN obstacle clearance and air-to-air separation – Combined effort IFPP and SASP • PBN Procedure Design Safety Assessment Manual • Advanced RNP support document Planning 02 July 2012 page 14
Objectives • New PBN documentation information • Status of global implementation • Identify implementation issues and problems • Development of a global action plan to support implementation • Plan to be presented to ANC/12 Register at 02 July 2012 www. icao. int/meetings/pbn-symposium page 15