ETA Environmental Health and Safety Monthly Metrics September
ETA Environmental Health and Safety Monthly Metrics September, 2017
ETA Accidents- 9/17 Type Date Div. Description Severity Status No ETA accidents reported in September
ETA Accidents- By Type 2 Other 1 Cut/Abrasion 0 Other Respiratory Eye Cut/Abrasion Contusion Burn Chem Contact Fracture/Break Repetitive Strain-Back/Leg Strain-Arm/Hand Oct '16 Nov '16 Dec '16 Jan '17 1 Repetitive Feb '17 Mar '17 Contusion Apr '17 May '17 Jun '17 Jul '17 1 1 1 Aug '17 Sep '17
0 First Aid Recordable Lost Work Sep '17 Aug '17 Jul '17 Jun '17 May '17 Apr '17 Mar '17 Feb '17 Jan '17 Dec '16 Nov '16 Oct '16 ETA Accidents- Severity 2 1
ETA Emergency Incidents- 9/17 Date Incident Area Status 9/15/17 Building Evacuation. False Alarm B 70 Fire alarm system activated during hydrogen sensor calibration. Wrong panel bypassed. 9/25/17 Building Evacuation. False Alarm B 90 Fire alarm system activated by a smoke detector. Fire Dept. response and no smoke identified.
Assessments ETA Ergonomic Assessments- By Month 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Open Completed Oct '16 0 3 Nov '16 0 0 Dec '16 0 0 Jan '17 0 4 Feb '17 0 2 Mar '17 0 7 Apr '17 0 3 May '17 0 6 Includes Telecommuter Assessments Jun '17 1 10 Jul '17 0 9 Aug '17 6 9 Sep '17 4 1
Open ETA Ergonomic Assessments Date Requested Div. Type Status 9/27/17 BTUS Telecommute In Progress 9/26/17 EAEI Telecommute In Progress 9/22/17 ETA Discomfort Actions Pending 9/19/17 ESDR Preventative Actions Pending 8/29/17 BTUS Preventative In Progress 8/23/17 EAEI Telecommute Assigned 8/18/17 EAEI Telecommute Actions Pending 8/14/17 BTUS Telecommute Actions Pending 8/11/17 EAEI Telecommute Actions Pending 8/3/17 EAEI Telecommute Actions Pending 6/30/17 EAEI Telecommute Actions Pending Open Assessments by Div. 1 3 1 EAEI BTUS 6 ESDR ETA CYL RD
ETA Incomplete Training Assignments 139 118 104 100 97 92 83 82 81 66 76 88 75 80 81 74 71 83 89 80 88 83 71 63 61 54 50 1 De 5 c' 15 Ja n '1 6 Fe b '1 M 6 ar '1 6 Ap r' 1 M 6 ay '1 6 Ju n '1 6 Ju l '1 Au 6 g' 16 Se p '1 6 Oc t' 1 No 6 v' 1 De 6 c' 16 Ja n '1 7 Fe b '1 M 7 ar '1 7 Ap r' 1 M 7 ay '1 7 Ju n '1 7 Ju l '1 Au 7 g' 17 Se p '1 7 v' No t' 15 Oc Se p '1 5 0 Incomplete Assignments *Does not include SEC 0203 “External Notification”
% Training Completion Status 100 98 98. 5 98. 5 99 98. 5 97. 5 96 94 94 92 % 93 93 92 92 92 Feb '17 Mar '17 93 93 93 Apr '17 May '17 Jun '17 94 93 90 88 86 84 82 80 Sep '16 Oct '16 Nov '16 Dec '16 Jan '17 ETA % LBNL % Jul '17 Aug '17 Sep '17
Incomplete Training by Course Type (Total Incomplete Assignments = 88 ) Haz Waste; 2 Radiation; 1 Pressure Safety; 2 Laser; 2 Hosting Foreign; 3 Other; 5 Ergonomics; 17 RII UC Ethics; 5 Cyber Security; 12 Chem Safety; 6 Fire Extinguisher; 11 GERT; 7 Electrical; 7 LBL 0010; 8
Training Assignments Due (Total = 88) Open Assignments by Division ETA; 6 CYL RD; 12 EAEI; 31 BTUS; 15 ESDR; 24 Open Assignments by Hire Date 50 45 40 35 30 25 20 15 10 5 0 45 29 14 < 1 Month 2 to 6 Months Assignments > 6 Month
ETA Training Assignments Due Renewal Training Assignments- 36 Total Assignments due by Job Type 45 40 35 >2 Months 6 1 -2 Months 6 30 25 42 20 15 21 10 5 8 3 3 1 0 0 0 re e Fa r cu lty GS Po RA St st D ud en oc. t Te Ass rm t. Ap p Lim t. Re ite d h Re Co tir e Vi ntra sit c Re tor se ar ch 4 24 <1 Month Ca Af fi lia te 0 6 0 10 20 30
0 0 4 0 0 0 1 0 Developing 1 Jan '17 EHS Collaboration 1 3 1 7 Approvals 6 2 4 10 8 1 2 2 Sep '17 0 1 6 Aug '17 1 Jul '17 25 Jun '17 0 15 May '17 1 Apr '17 7 Mar '17 6 Feb '17 0 1 1 1 Dec '16 0 1 0 2 Nov '16 5 Oct '16 Sep '16 16 Aug '16 10 20 Jul '16 20 Jun '16 25 May '16 15 Apr '16 1 0 1 2 Mar '16 5 Feb '16 Pending ETA Work Activities 30 2 2 1 5 1 0 8 0 5
ETA Work Activity Summary (Active) 160 140 120 61 61 56 59 61 56 54 56 56 54 54 48 49 50 51 50 100 51 80 46 60 33 36 39 41 47 48 50 51 52 52 54 56 58 58 59 61 61 32 28 30 40 20 34 34 36 38 39 38 35 28 27 27 27 0 b Fe '16 r Ma '16 r Ap '16 y Ma '16 n Ju '16 l Ju '16 g Au '16 Level 1 Hazards p Se '16 6 t '1 Oc v No '16 c De '16 n Ja '17 b Fe Level 2 Hazards '17 r Ma '17 r Ap '17 y Ma '17 n Ju '17 l Ju Level 3 Hazards '17 17 g' Au 17 p' Se
ETA Activity Manager Assignments ETA Total Personnel- 805 Assigned Not Accepted; 9; 1. 12% Unassigned; 2; 0. 25% Opt Out; 144; 17. 89% Assigned Accepted; 650; 80. 75%
0 1 1 Jun '16 May '16 Apr '16 Mar '16 0 0 0 0 # Failed Items Equipment listed in the EEIP database as “failed” and requires repair prior to use. Sep '17 Aug '17 Jul '17 5 Jun '17 6 May '17 4 Apr '17 7 Mar '17 Feb '17 Jan '17 Dec '16 Nov '16 Oct '16 Sep '16 Aug '16 Jul '16 2 Feb '16 Jan '15 3 Dec '15 2 Nov '15 Oct '15 4 Sep '15 Aug '15 July '15 6 Jun '15 May '15 15 15 Apr '15 Mar '15 8 Feb '15 Electrical Equipment Inspection Failure Status (Red Tag) 18 16 14 12 10 16 16 13 11 11 9 9 4 1 1 1
ETA Failed “Red Tag” Electrical Equipment Status (10/2/17) Barcode 38563 Building 70 Room 274 Equipment Name Tube Furnace Controller Responsible Person J. Slack DIV BTUS
Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) 30 25 20 # Conditionally Accepted Items Equipment listed in the EEIP database as “Conditionally Accepted” and requires repair within 120 days. Sep '17 8 8 6 7 Aug '17 8 Jul '17 10 Jun '17 Mar '17 Feb '17 Nov '16 7 7 Oct '16 Sep '16 4 3 4 Aug '16 Jun '16 May '16 Apr '16 Mar '16 Feb '16 Dec '15 Nov '15 7 Oct '15 0 13 13 13 12 Jul '16 5 Apr '17 15 14 14 May '17 20 Jan '17 10 24 Dec '16 27 Jan '16 15
ETA “Conditionally Accepted” Electrical Equipment Summary (10/2/17) Bar Code Bldg. Room Equipment Responsible Div Status 51846 977 271 8 Channel Battery Analyzer (New) R. Wang CYRD 427 days 51979 977 271 BTS 4000 Battery Analyzer R. Wang CYRD 343 days 51981 977 271 Vacuum Drying Oven R. Wang CYRD 343 days 27240 70 114 Tube Furnace Control Console G. Liu ESDR 34 27241 70 114 Tube Furnace G. Liu ESDR 34 27242 70 264 Temperature Controller R. Kostecki ESDR 34 27255 977 271 Mixer P. Taynton CYRD 21 27253 977 271 Lab Oven P. Taynton CYRD 21
Corrective Action Reports (CATS)- 9/17 CATS # Date Description Lead Status No CATS currently open
Audits and Inspection Status- 9/17 Type Date Lead Status ALD Walkthrough- CYR Division Sept. 2017 D. Boyson Completed ALD Follow-up on identified priority issues (EDSR, BTUS, EAAI) Sept. 2017 R. Ramesh Items being addressed. Need to schedule Ramesh to verify completion. Quarterly SAA Inspections October, 2017 R. Scholtz Scheduled for 10/25/17
Significant Safety Achievements- 9/17 • • • A walkthrough was performed of all ETA work areas in response to the labwide electrical equipment demolition “pause”. No issues related to the pause were identified. The 70 -218 sulfur glove box was cleaned-out. A batch of old chemicals and samples was sent out for waste disposal. All remaining items were bar coded and entered into the CMS. Home ergonomic evaluations continue. Only a few more remain. Assisted with set-up of a lab area in 62 -138. Cyclotron Road performed a safety walkthrough on 9/13/17. I followed up on several issues identified. A batch of old chemicals was disposed in B 63. I am also making arrangements for the return of 10 sulfur hexafluoride gas cylinders. The hydrogen sensors in 70 -257 received their annual calibration. Work on the Molecular Foundry’s “Effectiveness Review” for three incidents has started. I am leading the review team. I gave two safety presentations at the County of Santa Clara’s 32 nd annual Safety Seminar.
Short Term Safety Outlook 10/17 • Generate the 2018 Self-Assessment Plan for ETA. The top three projects have been identified. • Continue Level 2 and Level 3 Work Activities renewals. Only a few more to go in 2017. • Complete the telecommuter ergonomic assessments. • Start self-assessment project involving evaluation of Activity Manager use by assigned workers. • Provide follow-up on the recent issue involving a sample sent offsite that self-heated. • Assist divisions complete follow-up on action items generated from the recent ALD walkthroughs. • Participate as the lead for an Effectiveness Review the Molecular Foundry has requested regarding corrective actions taken on the three same-day hazardous materials incidents they experienced last year.