ETA Environmental Health and Safety Monthly Metrics May, 2019

ETA Environmental Health and Safety Monthly Metrics May, 2019

ETA Accidents- 5/19 Type Date Div. Area Description Severity Status Repetitive Motion. Shoulders/Arms 5/13/19

ETA Accidents- 5/19 Type Date Div. Area Description Severity Status Repetitive Motion. Shoulders/Arms 5/13/19 ESDR 62 -314 First Aid Ergo evaluation completed. Work area reconfigured. Completed Electrical Shock 5/23/19 ESDR 70 -279 Worker suspected strain from frequent torqueing on pressure reactors. Further investigation identified work station set-up as primary cause. Worker touched the top of an ozone generator equipment and received a minor 2 milliamp shock. First Aid Equipment evaluated and no obvious problems, but there is electrical leakage when the equipment is initially turned on. Tagged out of service. Further follow-up needed regarding awareness of timely reporting.

ETA Accidents- By Type 4 Other 3 2 Contusion Respiratory Other Repetitive Shock 1

ETA Accidents- By Type 4 Other 3 2 Contusion Respiratory Other Repetitive Shock 1 Repetitive. Strain-Back/Leg. Repetitive 0 Other Respiratory Shock Eye Cut/Abrasion Contusion Burn Chem Contact Fracture/Break Repetitive Strain-Back/Leg Strain-Arm/Hand May '18 Jun '18 Jul '17 Aug '18 1 Repetitive Sep '18 1 Strain-Arm/Hand, Strain-Back/Leg 1 Oct '18 Nov '18 Dec '18 Jan '19 Feb '19 Repetitive Mar '19 Apr '19 May '19 1 1 2 1 1 1

0 First Aid Recordable Lost Work May '19 Apr '19 Mar '19 Feb '19

0 First Aid Recordable Lost Work May '19 Apr '19 Mar '19 Feb '19 Jan '19 Dec '18 Nov '18 Oct '18 Sep '18 Aug '18 Jul '18 Jun '18 May '18 4 ETA Accidents- Severity 3 2 1

ETA Emergency Incidents- 5/19 Date Incident Area Status No ETA-related emergencies in May

ETA Emergency Incidents- 5/19 Date Incident Area Status No ETA-related emergencies in May

Assessments ETA Ergonomic Assessments- By Month 20 19 18 17 16 15 14 13

Assessments ETA Ergonomic Assessments- By Month 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Open Completed May '18 0 2 Jun '18 0 1 Jul '18 0 3 Aug '18 0 5 Sep '18 0 6 Oct '18 0 5 Nov '18 0 2 Dec '18 1 18 Jan '19 0 2 Includes Telecommuter Home Office Assessments Feb '19 1 5 Mar '19 1 2 Apr '19 3 6 May '19 7 1

Open ETA Ergonomic Assessments 2 4 EAEI ESDR CYL RD BTUS 3 ETA 4

Open ETA Ergonomic Assessments 2 4 EAEI ESDR CYL RD BTUS 3 ETA 4

v' 1 De 7 c' 17 Ja n '1 8 Fe b '1 M

v' 1 De 7 c' 17 Ja n '1 8 Fe b '1 M 8 ar '1 8 Ap r' 1 M 8 ay '1 8 Ju n '1 8 Ju l '1 Au 8 g' 18 Se p '1 8 Oc t' 1 No 8 v' 1 De 8 c' 18 Ja n '1 9 Fe b '1 M 9 ar '1 9 Ap r' 1 M 9 ay '1 9 63 No t' 17 '1 7 17 83 Oc Se p 7 l '1 7 '1 g' Au Ju n ay Ju M ETA Incomplete Training Assignments 100 88 85 71 74 54 50 77 60 59 49 52 57 Incomplete Assignments 62 80 69 63 57 62 61 Linear(Incomplete Assignments) 69 73 68 56 0

% Training Completion Status 100 98 98. 5 98. 5 96 94 94 93

% Training Completion Status 100 98 98. 5 98. 5 96 94 94 93 93 Oct '18 Nov '18 93 93 93 Jan '19 Feb '19 Mar '19 Apr '19 May '19 92 % 90 88 86 84 82 80 May '18 Jun '18 Jul '18 Aug '18 Sep '18 ETA % Dec '18 LBNL %

Incomplete Training by Course Type (Total Incomplete Assignments = 68 ) Haz Waste; 3

Incomplete Training by Course Type (Total Incomplete Assignments = 68 ) Haz Waste; 3 Other; 2 Emergency Preparedness; 3 Foreign Nationals; 4 Ergonomics; 13 Fall/Ladder; 4 Chem Safety; 10 GERT; 4 [CATEGORY NAME], [VALUE] Fire Extinguisher; 8 ETA 0010 Safety Orientation; 6 [CATEGORY NAME], [VALUE]

Training Assignments Due (Total = 68) Open Assignments by Division Open Assignments by Hire

Training Assignments Due (Total = 68) Open Assignments by Division Open Assignments by Hire Date 35 ETA; 5 31 30 30 25 EAEI; 8 CYL RD; 29 BTUS; 11 20 15 10 ESDR; 15 7 5 0 < 1 Month 2 to 6 Months Assignments > 6 Month

ETA Training Assignments Due Overdue Training Assignments- 20 Total Assignments due by Job Type

ETA Training Assignments Due Overdue Training Assignments- 20 Total Assignments due by Job Type 45 40 35 4 >2 Months 30 25 20 40 15 10 1 1 -2 Months 14 5 5 3 2 1 0 0 r Po eer st Te Do rm c. Ap pt. GS R Fa A Re cult y h St Re ud tir en e t. A ss Lim t. Co ite d Vi ntra sit c Re tor se ar ch 3 15 <1 Month Ca Af fi lia te 0 0 5 10 15 20

ETA Activity Manager Work Activities Summary 180 160 140 120 100 51 62 62

ETA Activity Manager Work Activities Summary 180 160 140 120 100 51 62 62 63 63 66 65 65 65 66 64 66 59 59 59 62 61 61 63 59 61 56 56 54 54 49 50 54 54 54 48 51 50 80 46 60 61 61 61 62 62 59 59 63 64 65 65 66 66 66 67 63 63 36 39 41 58 58 59 61 61 61 56 33 54 52 52 32 47 48 50 51 28 30 40 20 34 34 36 38 39 38 35 28 27 27 27 27 29 28 29 27 27 28 28 28 27 27 0 16 b' Fe 6 r '1 Ap Jun '16 Au 16 g' 7 8 9 7 8 7 6 8 7 9 8 7 8 6 7 8 t '1 ec '1 eb '1 pr '1 un '1 ug '1 t '1 ec '1 eb '1 pr '1 J J Oc Oc A A A F F F D D D A A Oc Level 1 Hazards Level 2 Hazards Level 3 Hazards 8 Work Activities are pending for renewal under EHS Collaboration

ETA Activity Manager Assignments ETA Total Personnel- 906 Assigned Not Accepted; 1; 0. 11%

ETA Activity Manager Assignments ETA Total Personnel- 906 Assigned Not Accepted; 1; 0. 11% Opt Out; 191; 21. 08% Assigned Accepted; 714; 78. 81% 41 workers assigned but with ”Not Authorized To Work” status

Electrical Equipment Inspection Failure Status (Red Tag) 6 5 4 3 5 2 5

Electrical Equipment Inspection Failure Status (Red Tag) 6 5 4 3 5 2 5 4 4 4 3 1 1 May '19 0 Mar '19 0 Feb '19 0 Jan '19 0 Dec '18 0 Nov '18 Oct '18 Sep '18 Aug '18 Jul '18 Jun '18 May '18 Apr '18 0 Jan '18 0 Dec '17 0 Nov '17 Oct '17 0 1 Mar '18 1 Feb '18 1 Sep '17 Aug '17 Jul '17 Jun '17 May '17 Apr '17 0 1 Apr '19 2 1 0 3 # Failed Items Equipment listed in the EEIP database as “failed” and requires repair prior to use.

ETA Failed “Red Tag” Electrical Equipment Status (6/7/19) Barcode 52985 Building 70 Room 143

ETA Failed “Red Tag” Electrical Equipment Status (6/7/19) Barcode 52985 Building 70 Room 143 Equipment Name Film Coater Responsible Person A. Kusoglu DIV ESDR

16 Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) 14 12 10 8 14 14

16 Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) 14 12 10 8 14 14 6 12 12 10 6 4 4 3 1 1 # Conditionally Accepted Items Equipment listed in the EEIP database as “Conditionally Accepted” and requires repair within 120 days. 0 0 1 May '19 3 Apr '19 Aug '18 Jul '18 Jun '18 May '18 Apr '18 Mar '18 Feb '18 Jan '18 Dec '17 Nov '17 Oct '17 Sep '17 Aug '17 Jul '17 Jun '17 May '17 Apr '17 0 4 Mar '19 2 Feb '19 6 Jan '19 6 Dec '18 7 9 8 Nov '18 6 8 Oct '18 8 Sep '18 4 11 11

ETA “Conditionally Accepted” Electrical Equipment Summary (6/7/19) Bar Code Bldg. Room Equipment Responsible Div

ETA “Conditionally Accepted” Electrical Equipment Summary (6/7/19) Bar Code Bldg. Room Equipment Responsible Div CA Expiration Date 52929 62 135 Thinky AR-100 Conditioning Mixer M. Doeff ESDR 7/1/19 Conditionally Accepted must be repaired or salvaged within 120 days

Corrective Action Reports (CATS/ORPS)- 5/19 # Date Description Lead Status None

Corrective Action Reports (CATS/ORPS)- 5/19 # Date Description Lead Status None

Audits and Inspection Status- 5/18 Type Date Lead Status EAEI Management Walkthrough 6/12/19 A.

Audits and Inspection Status- 5/18 Type Date Lead Status EAEI Management Walkthrough 6/12/19 A. Lekov Scheduled Fire Marshal Building Inspection- FLEXLAB 6/28/19 M. Torkelson Scheduled SAA Hazardous Waste Inspections July K. Etherington Not Scheduled

Significant Safety Achievements- 5/19 • The new ”Electrical Equipment Procurement Guide” has been finalized

Significant Safety Achievements- 5/19 • The new ”Electrical Equipment Procurement Guide” has been finalized and made available to ETA personnel. I have also been sharing this document with other interested LBNL divisions. • Provided follow-up to the electrical shock incident in 70 -279. A component inside an ozone generator has failed. It caused a low level 2 milliamp shock to a researcher. • An ETA Safety Alert was issued for Bicycle Safety Awareness. This includes transportation modes that are prohibited at LBNL. • Annual updates/renewals of Level 3 Work Activities continues. • We had a large influx of new personnel during the month. A great deal of effort went into ensuring required training was completed. • Clean-up of 62 -220 continues. Old/abandoned tubing and equipment was salvaged. General clutter being reduced. More to come. • I completed my 8 -hour Hazardous Waste Operations and Emergency Response (Hazwoper) renewal training.

Short Term Safety Outlook 6/19 • Complete the Lab Area Safety Lead self-assessment project.

Short Term Safety Outlook 6/19 • Complete the Lab Area Safety Lead self-assessment project. • Complete an annual update of the ETA Integrated Safety Management (ISM) Plan. • Develop guidelines for purchase and operation of microwave ovens, lab ovens/furnaces, and hot plates used in lab areas. This is a project for the LBNL Laboratory Safety Committee. • Continue work on completing telecommute home office ergonomic assessments. • Follow-up on the numerous moves taking place in the B 51 F, B 63, and B 64 areas. Some waste disposal is needed. Door placards, etc. need to be updated. • Provide support for the new Cyclotron Road cohort. This includes development of new work activities and lab area set-up. • Provide follow-up on worker awareness regarding timely reporting of suspected shock incidents to Health Services. In addition, this will include more awareness about general emergency notification procedures (calling 911 or X 6999).