ETA Accidents- 3/17 Type Date Div. Description Repetitive Motionshoulder, arms, back 3/28/17 CYRD Pain

ETA Accidents- 3/17 Type Date Div. Description Repetitive Motionshoulder, arms, back 3/28/17 CYRD Pain in neck, back, Recordable elbow, wrist, and both shoulders Severity Status Ergonomic evaluation completed 3/31. Actions pending.

ETA Accidents- By Type

ETA Accidents- By Type

ETA Accidents- Severity

ETA Accidents- Severity

ETA Emergency Incidents- 3/17 Date Incident Area Status No ETA emergencies reported in March

ETA Emergency Incidents- 3/17 Date Incident Area Status No ETA emergencies reported in March

ETA Ergonomic Assessments- By Month

ETA Ergonomic Assessments- By Month

Open ETA Ergonomic Assessments Date Requested Div. Type Status 3/28/17 CYRD Discomfort. Recordable Actions

Open ETA Ergonomic Assessments Date Requested Div. Type Status 3/28/17 CYRD Discomfort. Recordable Actions Pending 3/10/17 ESDR High Risk Actions Pending 3/9/17 EAEI Discomfort Actions Pending

ETA Incomplete Training Assignments 139 118 105 100 104 97 92 89 83 79

ETA Incomplete Training Assignments 139 118 105 100 104 97 92 89 83 79 82 81 66 66 76 88 75 80 81 74 83 89 71 61 50 36 v' 15 De c' 15 Ja n '1 6 Fe b '1 M 6 ar '1 6 Ap r' 1 M 6 ay '1 6 Ju n '1 6 Ju l '1 6 Au g' 16 Se p '1 6 Oc t' 16 No v' 16 De c' 16 Ja n '1 7 Fe b '1 M 7 ar '1 7 No t' 15 '1 5 Oc 15 Se p g' 5 Au l '1 5 Ju n '1 5 '1 Ju ay M Ap r' 15 0 Incomplete Assignments *Does not include SEC 0203 “External Notification”

% Training Completion Status 100 99 98. 5 98. 5 97. 5 96 94

% Training Completion Status 100 99 98. 5 98. 5 97. 5 96 94 92 % 93 92 92 92 Apr '16 May '16 Jun '16 Jul '16 Aug '16 Sep '16 93 93 93 92 92 Feb '17 Mar '17 90 88 86 84 82 80 ETA % Oct '16 LBNL % Nov '16 Dec '16 Jan '17

Incomplete Training by Course Type (Total Incomplete Assignments = 89) Hosting Foreign; 1 Haz

Incomplete Training by Course Type (Total Incomplete Assignments = 89) Hosting Foreign; 1 Haz Waste; 2 Electrical; 2 Pressure; 4 Other; 4 Fire Extinguisher; 18 LBL 0010; 5 UC Conflict; 5 Cyber Security; 14 PSD 0135; 7 Ergonomics; 7 Chemical; 12 GERT; 8

Training Assignments Due (Total = 89) Open Assignments by Division ETA; 6 BTUS; 9

Training Assignments Due (Total = 89) Open Assignments by Division ETA; 6 BTUS; 9 EAEI; 27 CYL RD; 20 ESDR; 27 Open Assignments by Hire Date 50 45 40 35 30 25 20 15 10 5 0 45 34 10 < 1 Month 2 to 6 Months Assignments > 6 Month

ETA Training Assignments Due Renewal Training Assignments- 27 Total Assignments due by Job Type

ETA Training Assignments Due Renewal Training Assignments- 27 Total Assignments due by Job Type 60 50 2 >2 Months 40 30 52 7 1 -2 Months 20 21 10 5 4 2 1 0 0 re e Fa r cu Po lty st Do Lim c. Te ite rm d Ap pt. GS Re RA h St Re ud tir en e t Co Ass t Vi ntra. sit ct Re or se ar ch 4 18 <1 Month Ca Af fi lia te 0 0 5 10 15 20

Pending ETA Work Activities

Pending ETA Work Activities

ETA Work Activity Summary (Active)

ETA Work Activity Summary (Active)

ETA Activity Manager Assignments ETA Total Personnel- 803

ETA Activity Manager Assignments ETA Total Personnel- 803

Electrical Equipment Inspection Failure Status (Red Tag) Equipment listed in the EEIP database as

Electrical Equipment Inspection Failure Status (Red Tag) Equipment listed in the EEIP database as “failed” and requires repair prior to use.

ETA Failed “Red Tag” Electrical Equipment Status (4/3/17) Barcode 27073 Building Room 70 157

ETA Failed “Red Tag” Electrical Equipment Status (4/3/17) Barcode 27073 Building Room 70 157 (Hallway) Equipment Name Single Axis Monitor 301 -DIV Responsible Person V. Zormpa DIV ESDR 27056 70 215 (Hallway) Power Supply T. Kirchstetter EAEI 27057 70 215 (Hallway) Power Supply T. Kirchstetter EAEI 27079 70 215 (Hallway) Electrostatic Classifier T. Kirchstetter EAEI 27042 70 293 (Hallway) Syringe Pump Cairns ESDR 27049 70 293 (Hallway) Potentiostat Cairns ESDR

Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) Equipment listed in the EEIP database as

Electrical Equipment “Conditionally Accepted” Status (Yellow Tag) Equipment listed in the EEIP database as “Conditionally Accepted” and requires repair within 120 days.

ETA “Conditionally Accepted” Electrical Equipment Summary (4/3/17) Bar Code Bldg. Room Equipment Responsible Div

ETA “Conditionally Accepted” Electrical Equipment Summary (4/3/17) Bar Code Bldg. Room Equipment Responsible Div Status 48471 70 134 Power Meter (LBNL Made) W. Delp EAEI 605 days 28758 70 291 Glove Box- Heater Control E. Cairns ESDR 419 days 51846 977 274 8 Channel Battery Analyzer (New) D. Boysen CYRD 245 days 51979 977 274 BTS 4000 Battery Analyzer D. Boysen CYRD 161 days 51981 977 274 Vacuum Drying Oven D. Boysen CYRD 161 days 27052 70 215 (Hallway) CAPS NO 2 Monitor T. Kirchstetter EAEI 103 days 27053 70 215 (Hallway) CAPS PMEX Monitor T. Kirchstetter EAEI 103 days 27045 70 293 (Hallway) Potentiostat E. Cairns ESDR 103 days 27048 70 293 (Hallway) Universal Programmer E. Cairns ESDR 103 days 47821 46 115 Intelligent Outlet Chasis A. Harding EAEI 103 days 27075 70 157 (Hallway) Illuminating Power Supply V. Zormpa ESDR 102 days 47877 66 224 40 Channel Battery Analyzer B. Van Tassell CYRD 73 Days

Corrective Action Reports (CATS)- 3/17 CATS # Date Description Lead Status 10094 3/13/17 Ensure

Corrective Action Reports (CATS)- 3/17 CATS # Date Description Lead Status 10094 3/13/17 Ensure all 16 non-NRTL ovens/furnaces are inspected and receive “green dot” R. Scholtz Self-assessment item. Scheduling inspections. 10095 3/13/17 Ensure all ovens/furnaces have adequate seismic restraint. R. Scholtz Self-assessment item. Initial discussions with seismic restraint vendor. 10096 3/13/17 Develop a system for placing defective equipment out of service. Communicate process to ETA personnel. R. Scholtz Self-assessment item. Prototype procedure developed. Need to run by Electrical Safety Committee. 10097 3/13/17 Ensure oven observed connected R. Scholtz to multiple outlet strip is corrected. Communicate high amp equipment should be plugged directly to outlet. Self-assessment item. Completed

Audits and Inspection Status- 3/17 Type Date Lead Status Quarterly SAA Inspection April, 2017

Audits and Inspection Status- 3/17 Type Date Lead Status Quarterly SAA Inspection April, 2017 R. Scholtz 4/24/17 EHS Division Walkthroughs of ETA Areas April-June, 2017 H. Madison Scheduling. Areas identified.

Significant Safety Achievements- 3/17 • • The Oven/Furnace Self Assessment project report has been

Significant Safety Achievements- 3/17 • • The Oven/Furnace Self Assessment project report has been completed and submitted to OCA. Several Work Activities were renewed during March. A number were also updated in anticipation of many due for renewal in May. Followed up on the 70 -263 hood valve identification issue. A valve identified as nitrogen was connected to natural gas. Performed a survey of all 63 ETA hoods. Follow-up is being planned for survey results. A large old chemical clean-out was performed for the 62 -220, 246, 308, and 310 lab areas. A total of 211 containers were disposed. Disposal of cleaners, paints, and asphalt containers identified in the B 90 hallway storage cabinets was completed. Follow-up on PSD 0135 “Emergency Management Awareness” training continues. ETA started with 410 assignments and now has only 7 assignments that remain pending. Coordinated repair of hood flammables cabinet door repairs in 62 -320, 70 -269 and 70 -279.

Short Term Safety Outlook 4/17 • • • Many of the Level 2 and

Short Term Safety Outlook 4/17 • • • Many of the Level 2 and Level 3 Work Activities are due for semiannual/annual renewal over the next 2 months. Continue follow-up on the list of open “Failed” and “Conditionally Accepted” electrical equipment items. Follow-up on remaining items identified from the B 70 fire inspection. This includes replacement of plastic hydrogen gas lines. Start the Telecommuter Ergonomic Self-Assessment project. We will be working in conjunction with several other divisions. Follow-up on the action items identified from the recent ETA hood survey. This includes pipe labels, gas valve repairs, and light repairs. Continue participation in the Hazardous Waste Requisition improvement team. Participate in the effectiveness review team for the Electrical Safety Improvement Plan (ESIP). Coordinate the annual non-returnable gas cylinder disposal project. Complete the quarterly SAA inspections of ETA lab areas.