ETA Accidents- 2/15 Type Date Puncture to left hand 2/27/15 Dept. Description Severity ESDR While drawing First Aid chemical out of bottle with syringe, needle pulled out and punctured hand. Status Accident investigation being set-up.
ETA Accidents- By Type 3 2 Other Cut/Abrasion 1 Contusion 0 Other Respiratory Eye Cut/Abrasion Contusion Burn Chem Contact Fracture/Break Repetitive Strain-Back/Leg Strain-Arm/Hand Jan '14 Feb '14 Mar '14 Cut/Abrasion Fracture/Break Apr '14 May '14 Jun '14 1 Strain-Back/Leg Respiratory Repetitive Jul '14 Aug '14 Sep '14 Oct '14 Cut/Abrasion Nov '14 Dec '14 Jan '15 Feb '15 1 1 1 1
0 First Aid Recordable Lost Work Feb '15 Jan '15 Dec '14 Nov '14 Oct '14 Sep '14 Aug '14 Jul '14 Jun '14 May '14 Apr '14 Mar '14 Feb '14 Jan '14 ETA Accidents- Severity 3 2 1
Emergency Incidents- 2/15 Date Incident Area Status 2/17/15 Coolant leak from Mo. Wi. TT trailer into parking lot. B 64 Leak cleaned up by Facilities. Mo. Wi. TT The cooling system will be changed to a water-only system. All system fittings and components need to be inspected and repaired where needed.
Ergonomic Assessments- By Month 10 9 Assessments 8 7 6 5 4 3 2 1 0 Open Completed Jan '14 0 4 Feb '14 0 5 Mar '14 0 9 Apr '14 0 4 May '14 0 3 Jun '14 0 7 Jul '14 0 6 Aug '14 0 6 Sep '14 0 3 Oct '14 0 4 Nov '14 2 4 Dec '14 0 3 Jan '15 1 2 Feb '15 4 0
Open EETD Ergonomic Assessments Date Requested Dept. Type 2/27/15 EAEI Preventative Assigned 2/20/15 EAEI Discomfort Actions Pending 2/19/15 EAEI Discomfort Actions Pending 2/6/15 ESDR High Risk Assigned 1/9/15 BTUS Discomfort Open Assessments by Dept. Status Actions Pending 11/25/14 DIV Preventative Actions Pending 11/4/14 EAEI Discomfort Actions Pending 1 ESDR 1 BTUS 4 1 EAEI DIV
ETA Job Hazard Analysis (JHA)- Pending 18 16 14 JHA’s Due 12 10 8 6 4 2 0 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Expired >30 Days 0 0 0 Expired <30 Days 1 1 2 0 0 1 New Hire >30 Days 0 1 0 2 1 0 New Hire <30 Days 2 4 14 2 1 9 Jul '14 0 3 1 2 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 1 0 0 0 2 0 0 0 0 4 10 2 0 3 4 3 New Hire vs. Expired Metric Started Sep ‘ 13
Job Hazard Analysis- % Completion 100 99 99, 5 99 98 98 100 99, 5 99 98 97 96 94 92 % 92 91 90 90 91 91 91 90 90 88 86 84 82 80 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 ETA % Aug '14 Sep '14 LBNL % Oct '14 Nov '14 Dec '14 Jan '15 Feb '15
ETA Incomplete Training Assignments 150 116 100 93 92 91 78 76 66 66 59 89 93 88 48 91 84 65 64 50 97 81 78 73 92 69 75 52 t' 1 No 3 v' 1 De 3 c' 13 Ja n '1 4 Fe b '1 M 4 ar '1 4 Ap r' 1 M 4 ay '1 4 Ju n '1 4 Ju l '1 Au 4 g' 14 Se p '1 4 Oc t' 1 No 4 v' 1 De 4 c' 14 Ja n '1 5 '1 3 Oc 13 Se p 3 3 g' Au l '1 Ju '1 3 n '1 Ju ay r' 13 M '1 3 Ap ar '1 3 M Fe b Ja n '1 3 0 Incomplete Assignments * Does not include SEC 0203 “External Monitoring” Notice or “FSM” courses
Training % Completion Status 100 98, 5 99, 5 99 98, 5 99 98, 5 99 98 96 95 95 94 94 93 93 93 Nov '14 Dec '14 Jan '15 92 % 90 88 86 84 82 80 Jan '14 Feb '14 Mar '14 Apr '14 May '14 Jun '14 Jul '14 ETA % Aug '14 LBNL % Sep '14 Oct '14 Feb '15
Incomplete Training by Course Type (Total Incomplete Assignments = 73 ) Pressure; 2 Trafficking; 1 Ladder; 1 Haz Waste; 2 Electrical/LOTO; 2 New Employee; 2 GERT; 2 Ergonomics; 23 Supervisor; 3 Overview of EHS; 3 Hosting Foreign; 4 UC COI/Ethics; 4 Fire Extinguisher; 10 Cyber Security; 9 Chemical Hygiene; 5
Training Assignments Due (Total = 73) Open Assignments by Division Open Assignments by Hire Date 40 36 35 30 EAEI; 14 25 BTUS; 30 23 20 14 15 10 ESDR; 29 5 0 < 1 Month 2 to 6 Months Assignments > 6 Month
ETA Training Assignments Due Assignments due by Job Type Renewal Training Assignments- 22 Total 35 30 2 >2 Months 25 20 33 15 5 1 -2 Months 10 14 5 6 3 3 2 1 0 0 re er L St im ud ite en d t Te Ass rm t. Ap p Fa t. c Po ulty st Do c. GS Re RA Vi h R sit et Re ire se Co arc nt h ra ct or 5 15 <1 Month Ca Af fi lia te 0 6 0 5 10 15 20
Electrical Equipment Inspection Failure Status (Red Dot) 18 16 14 12 >180 Days Due 10 8 31 -180 Days Due 6 <30 Days Due 4 2 0 Nov '14 Dec '14 Jan '15 Feb '15 Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (3/3/15) Equipment Date Days Failed Dept. Area Status Fixture Current Sensor 1/9/09 2244 BTUS 46 -231 Unable to locate unit Waveform Generator 4/7/11 1426 BTUS 46 -115 Unable to locate unit Dual Seal Vacuum Pump 4/27/11 1406 EAEI 63 -101 Unable to locate unit Aethalometer 4/28/11 1405 EAEI 63 -101 Unable to locate unit AC Line Conditioner 6/6/12 1000 EAEI 70 -278 Power cord needs to be replaced Blower 6/11/12 995 EAEI 70 -289 Power cord needs strain relief Appliance Monitors 10/18/12 866 ESDR 90 -1141 Units may never have been built. Request closure. Tracer Emitter Units (Multiple) 11/20/12 833 BTUS 70 -217 Units placed out of service Particle Samplers (multiple units) 2/5/13 756 EAEI 71 -106 Units placed out of service Residential Furnace 10/18/13 501 BTUS 70 -173 Unit being used for parts Turbine Meter Readout 10/21/13 498 BTUS 70 -173 Unable to locate unit MFC Pump 12/2/13 447 EAEI Sacto Waiting for pump to be brought back from field Power Supply #1 11/7/14 116 EAEI 70 -278 Uncovered AC terminal strip Power Supply #2 11/7/14 116 EAEI 70 -278 Power cord needs replacement Power Supply 12/10/14 83 ESDR 70 -173 Unlanded conductors, ground bond not attached
2 '13 3 3 Completed Open '14 4 4 Jan '1 5 Feb '15 Dec '1 Nov '1 Oct '1 4 4 Sep '1 Aug '1 '14 Jun '1 4 Jul '1 4 May Apr '1 4 Mar Feb '1 3 Dec '13 Jan '1 4 Nov '1 Oct '1 3 3 Sep '1 Aug '1 '13 Jun '1 3 Jul '1 3 May Apr '1 3 Mar Feb '1 2 Dec '12 Jan '1 3 Nov '1 Oct '1 2 Aug '12 Sep '12 0 Jul '1 Safety Concerns Submittals- ETA 10 9 8 7 6 5 4 3 2 1
ETA Safety Concerns Status # Date Concern Type Status 1180 9/23/14 Need steps from B 90 shuttle stop up to sidewalk. Uneven surface. Traffic- Ped CATS submitted for funding 1189 10/22/14 Poor lighting near B 90 stairways Building Maint. Open- Waiting for FWR closure. 1198 11/22/14 Trash bin located at B 63 is causing damage to exterior water pipe. Also blocking access ramp. Building Maint. Open- Facilities needs to find a new location. 1211 1/23/15 Flashing crosswalk on Cyclotron Rd. is not operating properly Traffic Open- Waiting for FWR closure
Corrective Action Reports (CATS)- 2/15 CAT # Date Description Lead Status 9675 7/29/14 Seismically secure the laser table near the 70 -157 entrance. DOE assessment follow-up item. X. Mao Facilities work request submitted for installation. 9706 9/9/14 Ensure air changes in 70 -174 meet fire code requirements S. Synarski Facilities work request completed. Cannot close CATS until FWR is finalized in system by Facilities.
Audits and Inspection Status- 2/15 Type Date Lead Status DOE-BSO 2/24/15 Walkthrough of B 70 1 st floor K. Abbott/R. Completed Scholtz DOE-BSO Walkthrough of B 70 2 nd floor K. Abbott/R. Scheduled Scholtz 3/3/15
Significant Safety Achievements- 2/15 • Continue set-up of Work Planning and Control (WPC) projects/activities for ESDR. Several hands-on training sessions were organized to assist activity leads in learning how to use Activity Manager. • The glove box self assessment project continues. A survey was distributed to PI’s and each glove box was surveyed by the assessment team. Data has been collected and is being compiled. • The chemical container/sample clean-out of the B 62 (Kerr) lab areas is nearly completed. A CMS inventory reconciliation resulted in the elimination of 800 containers that no longer exist. • An ETA Safety Committee meeting was held 2/5/15. • Alan Biocca has agreed to serve as the ETA Electrical Safety Officer (ESO). • Participated in a DOE-BSO walkthrough of Building 70 lab areas. Efforts to eliminate old unused equipment needs to continue.
Short Term Safety Outlook- 3/15 • Continue the set-up of the Work Planning and Control (WPC) “projects” and “activities” framework for ETA. Additional “handson” training classes are planned. • Complete the Glove Box Operation Self-Assessment project report for submittal. • Conduct the annual review and update of the ETA Integrated Safety Management (ISM) Plan. • Provide follow-up for findings generated as a result of the B 70 fire incident. A final ORPS report will be generated with findings. • Continue old chemical/sample clean-outs in 62 -310, 62 -220, and 62 -246. Remaining inventory is being updated in the CMS. • Assist with the set-up for new lab areas 70 -143, B 33 JCESR, and B 60 test chambers.