ESD SYSTEM OVERVIEW Transport rod Cu Sample 1 Butterfly valve 2 Bias Sample Holder plate Electrometer RGA B-A gauge Pumping group Filament Conductance Gas Injection Line Full Range Gauge Filament Power Supply Bias Filament
ESD SYSTEM OVERVIEW
Cu SAMPLES
Circuit 35 KV A 2 -3 A +15 V V A V
Cu Samples main steps: Machining Cleaning Heat treatment ESD
Bake – out: lower part 9 8 7 6/11 1 2 3 5 10 4
Bake – out: upper part 3 B 4 B 2 B 1 B
RGA scans
RGA scans (valve closed)
Degassing: 9 Cycles @ 0. 35 KV H 2 % H 2 O% N 2/CO % O 2 % F% Ar % CO 2 % 9. 56 34. 1 16. 9 13 12. 4 9. 25 36. 9
Degassing: 9 Cycles @ 0. 70 KV H 2 % H 2 O% N 2/CO % O 2 % F% Ar % CO 2 % 23 34 30. 8 40 18. 9 16. 2 44. 9
Degassing: 9 Cycles @ 1. 5 KV H 2 % H 2 O% N 2/CO % O 2 % F% Ar % CO 2 % 0. 94 -0. 22 0. 77 3. 7 -0. 44 -3. 29 1. 47
Calibration: H 2 Calibration Factor
Calibration: N 2 Calibration Factor
Calibration: N 2 nd 2 set of data Calibration Factor
Degassing: 30 Cycles @ 0. 35 KV
CURRENT!!!!!
Desorption Yield
Desorption Yield • 15 RGA Cycles for background Signal + biassing of the sample • 15 RGA Cycles with the filament switched on • filament + sample degassing
Desorption Yield • switch on the filament • 15 RGA Cycles for background pressure • 15 RGA Cycles with the sample biased
Desorption Yield @ 0. 35 KV
Desorption Yield @ 10 KV
N 2 calibration
Energy correlation
Desorption Mechanisms
Desorption Mechanisms
Stopping power and Range Kinetic energy Stopping Power (Me. V cm 2/gr) Me. V Collision Radiative Total 1. 00 E-02 1. 32 E+01 1. 21 E-02 1. 32 E+01
Stopping power and Range Kinetic Energy Me. V Range gr/cm 2 Thickness cm 1. 00 E-02 4. 601 E-04 5. 15 E-05