EPRI CIM for Planning Project CIM Planning Profiles

  • Slides: 14
Download presentation
EPRI CIM for Planning Project CIM Planning Profiles Presented By Margaret Goodrich Project Consultants,

EPRI CIM for Planning Project CIM Planning Profiles Presented By Margaret Goodrich Project Consultants, LLC margaretgoodrich@earthlink. net Presented to CIM for Planning Workshop Dallas, TX April 10 -11, 2007

Topics • Profile Basis • Profile Legend • Set of Profiles • Description of

Topics • Profile Basis • Profile Legend • Set of Profiles • Description of Profiles © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 2

Profile Basis • All profiles are based on the Planning Data Requirements document •

Profile Basis • All profiles are based on the Planning Data Requirements document • Began by using the CPSM profile • Deleted classes that are not contained or referenced in the Planning Data Requirements document (unless I thought the class should be included or I wanted the group to provide input) • Currently have two profiles ready for review: – Steady State – Short Circuit © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 3

Profile Legend • Immediately following the class name, an indicator is provided to define

Profile Legend • Immediately following the class name, an indicator is provided to define whether the class is in the original CPSM, in the Planning Requirement or in Both…Examples: – – – • Transformer. Winding (Both) Busbar. Section (CPSM) Company (Planning) All classes and attributes listed are required unless an “(Optional)” tag is listed beside the element…Examples: – – Generating. Unit (Both) tcul. Control. Mode 2 nd and 3 rd winding) – All CPSM only classes have an Optional tag © 2005 Project Consultants, LLC All rights reserved. TX (Optional) (Transformer. Control. Mode) (Optional for CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 4

Profile Legend • Any new Package, Class or Attribute is specified as “New” listed

Profile Legend • Any new Package, Class or Attribute is specified as “New” listed to the right of the element in Red letters…Example: – – – • • Service. Date (Planning) New Class for Planning Topological. Node (Topological. Node) New Association for Planning service. Status (String) New Attribute for Planning Native or Inherited Roles were defined and included in the profile based on the element path listed in the requirements Most of the Notes and Comments columns in the requirements were included in the profile in the notes section. © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 5

Set of Profiles • Steady State Power Flow Network Model (NM Profile) – –

Set of Profiles • Steady State Power Flow Network Model (NM Profile) – – • • Short circuit network model (assumes NM profile) Incremental Power Flow and Short circuit models – • Historical or planning configurations or alternatives Dynamic model exchange – – • • • Equipment and connectivity Includes model tag, description, dates, solution method, etc. Standard WECC and IEEE models User-developed models Complex contingency & protection schemes Reporting (zones, subset definitions, etc. ) Relays and protection © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 6

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – CPSM

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – CPSM Only Classes included in this profile: • iec 61970 CIMVersion (CPSM) • Geographical Region (CPSM) • Sub. Control. Area (CPSM) • Sub. Geographical Region (CPSM) • Substation (CPSM) • Busbar. Section (CPSM) • Equivalent. Load (CPSM) • Load. Area (CPSM) • Non. Conform. Load. Schedule (CPSM) • Season (CPSM) • Hydro. Generating. Unit (CPSM) • Thermal. Generating. Unit (CPSM) © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 7

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – New

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – New Planning Classes included in this profile: • • • Interchange. Area (Planning) New Class for Planning Ownership (Planning) New Class for Planning. Area (Planning) New Class for Planning. Zone (Planning) New Class for Planning Service. Date (Planning) New Class for Planning © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 8

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – Issues

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – Issues for Discussion: – In the MVAr. Capability. Curve Class • x. Unit (Called Curve. Data. x. Value in Planning Doc. ? ) • y 1 Unit (Called Curve. Data. y 1 Value in Planning Doc. ? ) • y 2 Unit (Called Curve. Data. y 2 Value in Planning Doc. ? ) – Need to determine the type for some of the new attributes – these have question marks (? ? ) in parenthesis after the attribute © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 9

Description of Profiles – (Normative String Table) Class Attribute Valid Values Tap. Changer tcul.

Description of Profiles – (Normative String Table) Class Attribute Valid Values Tap. Changer tcul. Control. Mode m. VAr MW Volt Off Measurement. Type name Active. Power Reactive. Power Analog Name Constant. Real. Power Constant. Reactive. Power © 2005 Project Consultants, LLC All rights reserved. TX Constant. Current. Real. Powe r CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 10

Description of Profiles • Short Circuit Profile – CPSM Only Classes included in this

Description of Profiles • Short Circuit Profile – CPSM Only Classes included in this profile: • iec 61970 CIMVersion (CPSM) • Geographical Region (CPSM) • Sub. Control. Area (CPSM) • Sub. Geographical Region (CPSM) • Substation (CPSM) • Busbar. Section (CPSM) • Equivalent. Load (CPSM) • Load. Area (CPSM) • Non. Conform. Load. Schedule (CPSM) • Season (CPSM) • Hydro. Generating. Unit (CPSM) • Thermal. Generating. Unit (CPSM) © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 11

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – New

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – New Planning Classes included in this profile: • • • Interchange. Area (Planning) New Class for Planning Mutual Coupling (Planning) New Class for Planning Ownership (Planning) New Class for Planning. Area (Planning) New Class for Planning. Zone (Planning) New Class for Planning Service. Date (Planning) New Class for Planning © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 12

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – Issues

Description of Profiles • Steady State Power Flow Network Model (NM Profile) – Issues for Discussion: – In the MVAr. Capability. Curve Class • x. Unit (Called Curve. Data. x. Value in Planning Doc. ? ) • y 1 Unit (Called Curve. Data. y 1 Value in Planning Doc. ? ) • y 2 Unit (Called Curve. Data. y 2 Value in Planning Doc. ? ) – Need to determine the type for some of the new attributes – these have question marks (? ? ) in parenthesis after the attribute © 2005 Project Consultants, LLC All rights reserved. TX CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 13

Description of Profiles – (Normative String Table) Class Attribute Valid Values Tap. Changer tcul.

Description of Profiles – (Normative String Table) Class Attribute Valid Values Tap. Changer tcul. Control. Mode m. VAr MW Volt Off Measurement. Type name Active. Power Reactive. Power Analog Name Constant. Real. Power Constant. Reactive. Power © 2005 Project Consultants, LLC All rights reserved. TX Constant. Current. Real. Powe r CIM for Planning Workshop – April 10 -11, 2007 – Dallas, 14