Environmental Health and Safety Japan TC Chapter Liaison

  • Slides: 14
Download presentation
Environmental, Health and Safety Japan TC Chapter Liaison Report North America EHS TC Chapter

Environmental, Health and Safety Japan TC Chapter Liaison Report North America EHS TC Chapter Meeting November 10, 2016

Leadership • Committee Co-chairs – Hidetoshi Sakura/ Nuflare • GCS voting member • EHS

Leadership • Committee Co-chairs – Hidetoshi Sakura/ Nuflare • GCS voting member • EHS Committee representative to the JRSC – Moray Crawford/ Hatsuta Seisakusho • GCS voting member – Supika Mashiro/ Tokyo Electron • Leadership Changes – None

TC Chapter Organization EHS Japn TC Chapter Hidetoshi Sakura/ Nuflare Moray Crawford/ Hatsuta Seisakusho

TC Chapter Organization EHS Japn TC Chapter Hidetoshi Sakura/ Nuflare Moray Crawford/ Hatsuta Seisakusho Supika Mashiro/ TEL FPD System Safety TF Naokatsu Nishiguchi/ Screen Semiconductor Solutions S 23 Revision Global TF George Hoshi / TEL Lauren Crane/ TEL STEP Planning WG Kenji Sugihara/ Panasonic GHG Emission Characterization TF George Hoshi / TEL Seismic Protection TF Naokatsu Nishiguchi/ Screen Semiconductor Solutions SDRCM TF Supika Mashiro/ TEL

Meeting Information • Previous Meetings – April 19, 2016 at SEMI Japan Office –

Meeting Information • Previous Meetings – April 19, 2016 at SEMI Japan Office – June 28, 2016 at SEMI Japan Office • Next Meeting – 10: 00 -14: 00, December 16, 2016 at Conference Tower, Tokyo Big Site, Tokyo, Japan

Ballot Result on June 28 and Ratification Ballot • Doc. 5556 B: Line Item

Ballot Result on June 28 and Ratification Ballot • Doc. 5556 B: Line Item Revision to SEMI S 2 -0715, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment, Revisions to § 19 “Seismic Protection” (In Delayed Effective Date Format) – Passed with editorial changes and technical changes • Ratification Ballot to validate all of the technical changes made by a TC Chapter during adjudication of 5556 B – Ratification Ballot R 5556 B submitted to be voted for Cycle 6 • Clear the condition to pass – Also both 5556 B and R 5556 B passed the A&R process

Ballot Result on June 28 and Ratification Ballot • Doc. 5947 A: Revision to

Ballot Result on June 28 and Ratification Ballot • Doc. 5947 A: Revision to SEMI S 23 -0813, with title change from “GUIDE FOR CONSERVATION OF ENERGY, UTILITIES AND MATERIALS USED BY SEMICONDUCTOR MANUFACTURING EQUIPMENT” to “GUIDE FOR ENERGY, UTILITIES AND MATERIALS USE EFFICIENCY OF SEMICONDUCTOR MANUFACTURING EQUIPMENT” – Passed with editorial changes and technical changes • Ratification Ballot to validate all of the technical changes made by a TC Chapter during adjudication of 5947 A – Ratification Ballot R 5947 A submitted to be voted for Cycle 6 • Clear the condition to pass – Also both 5947 A and R 5947 A passed the A&R process

Upcoming Ballots • NONE

Upcoming Ballots • NONE

TF/ WG/ SG Reports -1 • S 23 Revision Global Task Force – No

TF/ WG/ SG Reports -1 • S 23 Revision Global Task Force – No special report except Doc. 5947 A at the TC Chapter meeting on June. 29. • Passed the TC Chapter review on June 28, 2016 • Ratification Ballot R 5947 A will be submitted to Cycle 6, 2016 • R 5947 A passed A&R and now during publication process

TF/ WG/ SG Reports -2 • Greenhouse Gas (GHG) Emission Characterization Task Force –

TF/ WG/ SG Reports -2 • Greenhouse Gas (GHG) Emission Characterization Task Force – No special update from the last report

TF/ WG/ SG Reports -3 • FPD System Safety Task Force – Doc. 5875:

TF/ WG/ SG Reports -3 • FPD System Safety Task Force – Doc. 5875: Revision to S 26 -0415: Environmental, Health, and Safety Guideline for FPD Manufacturing System (Line Item Revision) • S 26 -0516 was published – No other special update from the last report, but task force disbandment is under consideration.

TF/ WG/ SG Reports -4 • Seismic Protection Task Force – Doc. 5556 B,

TF/ WG/ SG Reports -4 • Seismic Protection Task Force – Doc. 5556 B, Line Item Revisions to SEMI S 2 -0712, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment Revisions Related to Section 19 Seismic Protection • Passed the TC Chapter review on June 28, 2016 • Ratification Ballot R 5556 B will be submitted to Cycle 6, 2016 • R 5556 B passed A&R and now during publication process

TF/ WG/ SG Reports -5 • SDRCM (S Documents REG-PG-SM Conformance Maintenance) TF –

TF/ WG/ SG Reports -5 • SDRCM (S Documents REG-PG-SM Conformance Maintenance) TF – Doc. 5972: Reapproval of SEMI S 19 -031, Safety Guideline for Training of Manufacturing Equipment Installation, Maintenance and Service Personnel. • Submitted to Cycle 1, 2016 • Super clean

TF/ WG/ SG Reports -6 • STEP Planning Working Group – STEP/ SEMI S

TF/ WG/ SG Reports -6 • STEP Planning Working Group – STEP/ SEMI S 2 is held on November 22 at SEMI Japan Office.

Thank you! Staff contact Junko Collins SEMI Japan jcollins@semi. org

Thank you! Staff contact Junko Collins SEMI Japan jcollins@semi. org