ENTSO-E and CIM User Group meeting, Prague, 10 -13 May 2011 Chavdar Ivanov, Ph.

ENTSO-E and CIM User Group meeting, Prague, 10 -13 May 2011 Chavdar Ivanov, Ph. D Research and Development Advisor, ENTSO-E Secretariat

ENTSO-E is THE European TSO platform • Founded 19 December 2008 and fully operational

ENTSO-E is THE European TSO platform • Founded 19 December 2008 and fully operational since 1 July 2009 • Represents 41 TSOs from 34 countries • 532 million citizens served • 880 GW net generation • 305, 000 Km of transition lines managed by the TSOs • 3, 200 TWh/year demand • 380 TWh/year exchanges • Replaces former TSO organisations: ATSOI, BALTSO, RTSO, NORDEL, UCTE, UKTSOA ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 2 of 33

ENTSO-E has significant role in delivering European energy and climate change objectives Key activities

ENTSO-E has significant role in delivering European energy and climate change objectives Key activities set out in Regulation 714/2009 (on cross-border electricity trade, part of the 3 rd Internal Energy Market Package) • Deliver network codes • Deliver network plans European / regional view of system needs (Ten-Year Network Development Plan “TYNDP”) • Deliver crucial aspects of market integration (“market coupling”) • R&D Plan (fully included in EEGI – European Electricity Grid Initiative, part of the SET Plan) Through its members deliver the infrastructure to: • enable markets to function, • secure energy supply, • meet climate change objectives through connecting RES ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 3 of 33

ENTSO-E: Organised to deliver a range of services 1 - Research & Development Plan

ENTSO-E: Organised to deliver a range of services 1 - Research & Development Plan 2 - Monitoring and Knowledge Sharing ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 4 of 33

Network Codes: Process + content areas defined in Reg. 714/2009 6 months Regulation 714/2009

Network Codes: Process + content areas defined in Reg. 714/2009 6 months Regulation 714/2009 Main resp. Planning, priorities EC Framework Guidelines ACER 12 months Draft Code(s*) ENTSO-E 3 months ACER ? Comitology EC, MS Monitoring ACER, E’E Network Codes (in twelve areas) Network connection Balancing incl. network-related reserve management Network security and reliability Operational procedures in an emergency Third-party access Data exchange and settlement Interoperability rules Capacity-allocation and congestion Trading Transparency Harmonized transmission tariff structures (incl. locational signals and TSO compensation) Energy efficiency regarding electricity networks ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 5 of 33

Pilot network code: ACER & ENTSO-E Network Codes FWGL Electricity Grid Connection Grid connection

Pilot network code: ACER & ENTSO-E Network Codes FWGL Electricity Grid Connection Grid connection requirements for generators Grid connection requirements for end customers Grid connection requirements for DSOs Grid connection requirements for HVDC links Grid connection procedures ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 6 of 33

Ten-Year Network Development Plan - TYNDP Assessment Assist Sustainability Competitiveness Policy Inform Action TYNDP

Ten-Year Network Development Plan - TYNDP Assessment Assist Sustainability Competitiveness Policy Inform Action TYNDP Coordinat Security of Supply Evaluate Monitoring e TYNDP = Ten-Year Network Development Plan “ENTSO-E shall adopt a non-binding Community-wide tenyear network development plan” • Transparency • Decision making process • Networks/scenarios/generation outlook/resilience ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 7 of 33

TYNDP summary The TYNDP projects represent ~14% of existing lines € 23 to 28

TYNDP summary The TYNDP projects represent ~14% of existing lines € 23 to 28 billion for grid expansions for the first five years ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 8 of 33

R&D Research and innovation clusters: Smart grids and with DSOs play a major part

R&D Research and innovation clusters: Smart grids and with DSOs play a major part in the R&D Plan, Plan: cooperation partly because of the balancing challenge ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 9 of 33

European Electricity Grid Initiative: Program budget - summary § Total program cost estimation is

European Electricity Grid Initiative: Program budget - summary § Total program cost estimation is around € 2 bn in 9 years (2010 – 2018) § The cost estimation of the priority actions that need to start in 2010 -2012 is around € 1 bn Priority projects costs (€M) Other projects costs (€M) Start 2010 -12 Start 2013 - Transmission/distribution coordination 68 162 230 Transmission networks 108 452 560 Distribution networks 830 370 1, 200 Total 1, 006 984 1, 990 Roadmap § Total costs (€M) The results are beneficial for the whole European energy value chain, requiring a comprehensive funding that must involve EC, the Member States, the regulators and industry. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 10 of 33

ENTSO-E and CIM Ø ENTSO-E needs and wants to have only one data exchange

ENTSO-E and CIM Ø ENTSO-E needs and wants to have only one data exchange format Ø ENTSO-E organizes yearly Interoperability tests to ensure right and stable development Ø The Roadmap for the implementation of next updates of the ENTSO-E CIM Profile avoids frequent changes in the ENTSO-E CIM Profile ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 11 of 33

Current ENTSO-E CIM/XML Profile Ø Current ENTSO-E Profile is the profile tested in UCTE

Current ENTSO-E CIM/XML Profile Ø Current ENTSO-E Profile is the profile tested in UCTE IOP in March 2009 in Paris. THIS IS THE PROFILE THAT MUST BE IMPLEMENTED BY ENTSO-E MEMBERS. Updates of this profile should follow the approved Roadmap Ø Proposals for changes are welcome and will be discussed within ENTSO-E, IEC and will be tested in the ENTSO-E IOP once agreed among IOP participants. Ø Current ENTSO-E CIM/XML profile is published on ENTSO-E web site (CIM part: http: //www. entsoe. eu/index. php? id=237) Ø ENTSO-E Boundary Set is available here: https: //www. entsoe. eu/resources/cim/profiles/ Ø A draft version of the 2 nd edition of the ENTSO-E CIM/XML profile was developed for the ENTSO-E interoperability test in July 2010. It is also available on the ENTSO-E web site (https: //www. entsoe. eu/fileadmin/user_upload/_library/resources/CIM/Interoperability_T ests/ENTSO-E_CIM_Model_Exchange_Profile_v 2_draft_7_IOPversion_12 July 2010. zip ) ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 12 of 33

Roadmap for future implementation of CIM Ø The aim: to structure the implementation effort.

Roadmap for future implementation of CIM Ø The aim: to structure the implementation effort. No yearly implementation. An exception could be only if a change is introduced which is critical for ENTSO-E processes Ø The implementation process is foreseen to last one year. Ø On regular basis the implementation effort is foreseen every three years, if necessary. Ø Next versions of the ENTSO-E Profile have to be approved by System Development Committee (SDC). In case of changes that affect operational data, System Operations Committee (SOC) decision is also required. Ø SDC or SDC&SOC decision ensures one year implementation period. Coming into force date is fixed and mandatory for TSOs EXAMPLE: if the updated version of the 2 nd ENTSO-E Profile for IOP 2011 is OK: - Approval by SDC and SOC - 2012 implementation year - Jan 2013 ENTSO-E switches to 2 nd edition of the profile for all exchanges. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 13 of 33

ENTSO-E CIM Interoperability Tests – 11 July 2011 (5 days) Registered vendors Ø BCP

ENTSO-E CIM Interoperability Tests – 11 July 2011 (5 days) Registered vendors Ø BCP Busarello + Cott + Partner AG (NEPLAN) Ø Open Grid Systems (Cimphony) Ø Intercompro AG (ISPEN) Ø TIBCO (Intelli. EDGE) Ø SISCO (UIB Adapter for PI-AF and UIB Core) Ø Siemens Power Technologies International (PSS/ODMS) Ø GE Energy (PSLF) Ø EKC&DMS (Transmission Network Analyzer) Ø RTE (Convergence) Ø FGH (INTEGRAL 7) Ø Tractebel and RTE (EUROSTAG) Ø Ventyx/ABB (Network Manager SCADA/EMS) Ø CESI (SPIRA; CRESO; SICRE) Ø EPS (Power System Analyzer, PSA) Ø PSI AG (PSIcontrol) Ø DIg. SILENT Gmb. H (Power. Factory 14. 1) Ø EDF R&D (GEDEON Database; CIMclipse; CIM-ENTSO-E Converters) Ø Alstom Grid (e-terrasource) Ø GE Energy Services (Enterprise Gateway) Ø Nexant In addition to the above vendors, ABB (BMS CIM Explorer) requested to participate in the preparation leading up to the interoperability test. Zemiren (Cim. Contextor) will participate in the test and will support preparation of profiles to be used in the test. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 14 of 33

ENTSO-E IOP 2011 – test topics • • • Interoperability using the last Unified

ENTSO-E IOP 2011 – test topics • • • Interoperability using the last Unified Modeling Language (v 15 + Dynamics + any modifications agreed among test participants) – new draft of the 2 nd edition of the profile Interoperability using 1 st and 2 nd editions of the profile, including naming convention Model Authority Sets (MAS), file headers, model assembling process Incremental exchange Exchange of short-circuit data according to IEC 60909 Exchange of dynamic models (standard models, user-defined models, proprietary models) – Further developments in the part of dynamics are not expected due to lack of the time Diagram layout – 61970 -453; GIS data Exchange “operations to planning” – The goal: detailed model to be exported to fit to ENTSO-E profile and imported by planning applications. ENTSO-E Equipment profile is the 452 one. “operational to operational exchange can also be demonstrated” ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 15 of 33

CIM extensions needed For the IOP 2011 • additional attributes to fully cover IEC

CIM extensions needed For the IOP 2011 • additional attributes to fully cover IEC 60909 short circuit data exchange. Discussion with WG 13 – next week For 2012: • HVDC modelling • Extension of Dynamics package ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 16 of 33

Model assembling TSO A: one MAS; set of files - zipped TSO B: one

Model assembling TSO A: one MAS; set of files - zipped TSO B: one MAS; set of files - zipped 2 nd step Import TSO N: one MAS; set of files - zipped Boundary MAS (equipment and topology files) - zipped Software for power flow/simulations 1. Import – all MAS (TSOs and Boundary) 2. Set Sv. Injection for tie-lines to zero 3. Run power flow/simulations 4. User modifies assembled model including data in the individual MAS, if necessary and runs power flow/simulations 5. Export of assembled model – per MAS including all modifications introduced using the tool 1 st step-Import 3 rd step Export Assembled power system model – one zip file; multiple MAS representing TSOs models and boundary MAS TSO A: one MAS; equipment, topology, dynamics, diagram files TSO N: one MAS; equipment, topology, dynamics, diagram files Boundary MAS – equipment and topology files A State variables file exported by the merging MAS

ENTSO-E IOP Report 2010 Ø Finalized and published in mid August 2010 Ø Available

ENTSO-E IOP Report 2010 Ø Finalized and published in mid August 2010 Ø Available on the ENTSO-E web site: https: //www. entsoe. eu/index. php? id=240 Ø Identified CIM issues were listed in the final report and submitted to IEC WG 13 for further discussion. CIM 15 resolves most of the issues ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 18 of 33

ENTSO-E exchanges in CIM – migration process to CIM Two main ENTSO-E processes are

ENTSO-E exchanges in CIM – migration process to CIM Two main ENTSO-E processes are subject to CIM migration System development • Still in migration period. • First data exchanges in CIM started in February 2010. “Planning exchanges” – required for TYNDP, regional initiatives, i. e. EU 3 rd Energy Package DACF process • The goal is to complete migration stage by the end of 2011 • First test exchanges started on 8 June 2010 and finished in the end of August 2010 • Now the second stage of tests for DACF is running. TSOs are exchanging 6 files per day in CIM (one day in a week). The goal is to verify the procedures and test Communication channels. • TSOs are building their converters to CIM (operational systems to CIM) Day-Ahead Congestion Forecast process – stable exchange needed to support system operation ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 19 of 33

ENTSO-E exchanges in CIM – migration process to CIM Why after two successful IOPs

ENTSO-E exchanges in CIM – migration process to CIM Why after two successful IOPs (March 2009 and November 2009) the real interoperability with 1 st edition of the ENTSO-E CIM profile is still a very difficult task? ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 20 of 33

ENTSO-E exchanges in CIM – Lessons learned Ø Testing with real data is necessary.

ENTSO-E exchanges in CIM – Lessons learned Ø Testing with real data is necessary. IOP test cases cannot fully represent all modelling approaches Ø More complex test models are needed. The role of CIMug and IEC in test models preparation is to be discussed Ø Some vendors introduced post IOP changes which made real interoperability not possible. Ø More strict rules on interoperability are needed to ensure that commercial products are really fully compliant with the Profile Ø Intensive communication between vendors and users is necessary to ensure right modelling and usage of right tools ØVendors should demonstrate their readiness to support ENTSO-E Profile ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 21 of 33

ENTSO-E exchanges in CIM – What ENTSO-E is doing. . . Ø To reach

ENTSO-E exchanges in CIM – What ENTSO-E is doing. . . Ø To reach interoperability with 1 st edition of the ENTSO-E Profile: § TSOs are kept informed on the efforts to be done: ENTSO-E Committees meetings, various workshops § Actions have been taken to improve communication between TSO and vendors § ENTSO-E Secretariat is contacting involved vendors on daily basis Ø To ensure future interoperability and improve business process: § ENTSO-E IOP 2011 will test both 1 st and 2 nd edition of the profile § Strict validation of the naming convention will be done during IOP 2011 § Vendors will be asked to export test models that they already have and demonstrate interoperability § The 2 nd edition of the profile is fully based on the 452, 456, 453, 552, etc. standards. Exchange flexibilities are improved. Open issues are clarified § ENTSO-E will implement a Network Modelling Database ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 22 of 33

Overall concept of Power System Database Network Modelling Database (NMD) as a part of

Overall concept of Power System Database Network Modelling Database (NMD) as a part of the Power System Database concept ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 23 of 33

Network Modelling Database – time schedule, objectives ü ü Preparation work and ENTSO-E decisions

Network Modelling Database – time schedule, objectives ü ü Preparation work and ENTSO-E decisions in 2010 EU tender started in Dec 2010; offers assessment is ongoing Contract expected in July 2011; NMD fully operational Jan 2012. Objectives: ü To adapt ENTSO-E business process to an automatic CIM based data exchange ü To have a system that supports the official ENTSO-E CIM profile and supports development of next editions of the profile. In Jan 2012 NMD should support 1 st and the 2 nd (July 2011) editions of the profile ü Provide automatic model assembling functionalities based on the ENTSO-E CIM profile, i. e. MAS, boundary sets. ü Allow users to maintain TSO, regional, pan-European models; store scenarios; import/export full, partial, differential files ü Allow specific queries, etc. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 24 of 33

Common CIM Tools used by TSOs Ø CIMdesk Ø Validation, visualization and editing tool

Common CIM Tools used by TSOs Ø CIMdesk Ø Validation, visualization and editing tool developed by Power. Info LLC, US Ø Provides users with possibilities for direct editing of CIM files and graphical visualization Ø It is not related to the migration process. It will be used and maintained as long as CIM /XML format is used Ø Maintenance contact has been prolonged. A re-licensing rules were agreed with ENTSO-E. Non ENTSO-E members can buy a license of CIMdesk. Requests should be addressed to Power. Info LLC. Ø Migration converter Ø Developed by EDF R&D, FR Ø Converts from UCTE CIM to UCTE DEF (current version: version 02) and vice versa Ø To be used during the migration stage; useful only for DACF exchanges in the RG Continental Europe Ø Maintenance contract was prolonged until 31 Dec 2011. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 25 of 33

CIM and ENTSO-E web site (www. entsoe. eu) ENTSO-E and CIM | Chavdar Ivanov

CIM and ENTSO-E web site (www. entsoe. eu) ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 26 of 33

ENTSO-E CIM in the CIMug web site ENTSO-E and CIM | Chavdar Ivanov |

ENTSO-E CIM in the CIMug web site ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 27 of 33

Additional slides WG 16 topics) ENTSO-E and CIM | Chavdar Ivanov | 11 May

Additional slides WG 16 topics) ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 28 of 33

Development and Implementation of CIM in ENTSO-E Ø November 2007: UCTE agreed to launch

Development and Implementation of CIM in ENTSO-E Ø November 2007: UCTE agreed to launch an initiative for development of new UCTE XML based data exchange format that will considered as a standard for exchange of load flow and dynamic data and allows performing of all kind of analyses as follows: steady state, unbalanced short circuit and dynamic analyses. Ø Ah. G UCTE format was established. Ø May 2008: UCTE Steering Committee approved ü Cooperation of Ah. G “UCTE format” with international organizations aiming at inclusion of UCTE needs into international standard ü UCTE participation in EPRI project (CIM for Dynamics) Ø Summer 2008: UCTE joins the EPRI Project and creates a liaison with IEC TC 57. UCTE CIM TF is established during CIM user Group meeting in Vasteras (June 2008) ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 29 of 33

Development and Implementation of CIM in ENTSO-E Ø January 2009: UCTE Steering Committee approved

Development and Implementation of CIM in ENTSO-E Ø January 2009: UCTE Steering Committee approved Migration Policy. Priority of migration of “planning” models is given. Ø March 2009: UCTE IOP. Successful interoperability among IOP participants Ø May 2009: UCTE Profile finalized and submitted to IEC Ø July 2009: ENTSO-E is fully operational: new work organization related to CIM is implemented ü All contracts and agreements have been transferred from UCTE to ENTSO-E has liaisons with IEC TC 57 (WG 13 and WG 16) and it is a member of EPRI project “CIM for Dynamics”, etc. Ø July 2009: CIMdesk and Migration Converter provided to ENTSO-E members Ø Nov 2009: First IOP CIM for Dynamics. The concept is proved ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 30 of 33

Development and Implementation of CIM in ENTSO-E Ø July 2010: ENTSO-E IOP “CIM for

Development and Implementation of CIM in ENTSO-E Ø July 2010: ENTSO-E IOP “CIM for System Development and Operations” 2010. Draft version of the second edition of the ENTSO-E CIM Profile. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 31 of 33

Important ENTSO-E decisions Ø 1 Oct 2009: System Development Committee (SDC) agreed that CIM/XML

Important ENTSO-E decisions Ø 1 Oct 2009: System Development Committee (SDC) agreed that CIM/XML will be used in ENTSO-E data exchanges related to SDC activities (system studies, planning data exchanges) Ø 2 Sep 2009: System Operations Committee (SOC) recommends: Ø Regional Group Continental Europe: The change from the UCTE format to CIM was decided by the UCTE Steering Committee. The goal is to switch to the new format before the end of 2010 at the latest (DACF exchanges) Ø Other Regional Groups to consider implementation of the standard with an aim of the pan-European harmonization Ø 2 Dec 2009: SDC and SOC: Approved the roadmap for future development and implementation of updates of the CIM/XML format Ø 11 Dec 2009: SDC, SOC and Market Committee: Approved ENTSO-E CIM Interoperability tests Ø Nov 2010: SDC, SOC decision on the second edition of the ENTSO-E CIM profile. Implementation postponed for after IOP 2011. ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 32 of 33

ENTSO-E Secretariat serves as a central function of coordination, maintenance and support of Common

ENTSO-E Secretariat serves as a central function of coordination, maintenance and support of Common Information Model (CIM) related issues and therefore, it is the interface to international organizations International organizations: IEC, EPRI, CIMug, … ENTSO-E Data Expert Group - Discussion on Committees/WGs requests; - Information on IEC opinion; - Possible solutions - etc. SG NMFT in RG CE WG System Development Committee - Liaisons, - Submitting ENTSO-E needs, - - Participation in the discussion, - etc Secretariat - Maintenance ENTSO-E CIM tools; - contacts with providers Requests that concern CIM must be submitted to Secretariat Operations Committee CIM tools CIMdesk; Migration Converter Market Committee NM&D WG EDI WGs defining needs ENTSO-E and CIM | Chavdar Ivanov | 11 May 20110 | Page 33 of 33