Enterprise Engineering The ModelBased Engineering MBE Diamond A

Enterprise Engineering The Model-Based Engineering (MBE) Diamond A Framework for Digital Transformation DIGITAL THREAD INCOSE International Workshop 2020 January 25, 2020 Daniel Seal Senior Manager, PLM Boeing Defense, Space & Security daniel. w. seal@boeing. com Copyright © 2020 Boeing. All rights reserved. Data Approved for Public Release (RROI 19 -00371 -BDS) Models Twins |1

Enterprise Engineering Background - The Traditional SE “V” Symbol § Product focused development Lifecycle Processes ion § “Document-centric” focus an d § Fails to depict integrative & iterative nature of product development Time Line § Historical attempts to update the “V” symbol increased complexity § A new symbol is needed that better represents the complex interactions of an MBE ecosystem Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Acceptance) Unit / Device Test Plan Int Re egra co tio mp n a os nd itio n System Verification Plan (System Acceptance) Subsystem Verification Plan (Subsystem it os mp co ion De finit De § Implies a sequential process System Validation Plan SOURCE: US DOT Federal Highway Administration Document/Approval Implementation Development Processes SOURCE: The Boeing Company The Systems Engineering “Engine” Approved for Public Release (RROI 18 -00101 -BDS) |2

Enterprise Engineering Tenets for Depicting the SE Process in an MBE Environment § Represent MBE as a multidimensional, iterative process encompassing both physical and virtual implementations Lifecycle Processes System Validation Plan D nd ion nit itio n eg efi Time Line an Unit / Device Test Plan rat ion na d. R itio ec (Subsystem Acceptance) os § Communicate how SE process is different by using MBE om Subsystem Verification Plan mp § Show relationships spanning business domains (e. g. Product, Production, Support & Services) po s co De System Verification Plan (System Acceptance) Int § Reflect the integrated nature of MBE, linked with feedback to related lifecycle elements SOURCE: US DOT Federal Highway Administration Document/Approval Implementation Development Processes § Easy to understand, but flexible and tailorable Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 18 -00101 -BDS) |3

Enterprise Engineering MBE Diamond Symbol - a Framework for MBE § The bottom-half of the Diamond represents Physical System (retaining traditional SE “V” flow) § The top-half of the Diamond represents the “Virtual” Systems (i. e. the virtual representation of the physical systems) § The interior of the Diamond represents the “Digital Thread” linking models/simulations to the physical systems design Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 18 -00101 -BDS) |4

Enterprise Engineering NEEDS SOLUTIONS AS-NEEDED AS-SUPPORTED AS-DELIVERED AS-CERTIFIED AS-DESIGNED AS-PLANNED DE L N G IV SI DE ASSPECIFIED ER Y AS-OFFERED AS-TESTED AS-BUILT PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) |5

Enterprise Engineering VIRTUAL PRODUCTION MODELS VIRTUAL ASSEMBLY & INTEGRATION COMPONENT MODELS VIRTUAL CERTIFICATION VIRTUAL OPERATIONS N M O TI O DE LA LI U SYSTEM MODEL M PRODUCT MODEL SI NG VIRTUAL QUALIFICATION VIRTUAL SUPPORT SYSTEM OF SYSTEMS MODEL NEEDS DE L N G IV SI DE ER Y SOLUTIONS PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) |6

Enterprise Engineering VIRTUAL PRODUCTION MODELS N M O TI O DE LA LI U SYSTEM MODEL M PRODUCT MODEL SI NG COMPONENT MODELS SYSTEM OF SYSTEMS MODEL NEEDS SOLUTIONS AS-NEEDED AS-DESIGNED DE L N G IV SI DE ASSPECIFIED ER Y AS-OFFERED AS-PLANNED PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) |7

Enterprise Engineering VIRTUAL ASSEMBLY & INTEGRATION VIRTUAL CERTIFICATION TI O DE LA LI U M SI NG VIRTUAL QUALIFICATION N M O VIRTUAL OPERATIONS VIRTUAL SUPPORT NEEDS SOLUTIONS AS-SUPPORTED AS-CERTIFIED DE L N G IV SI DE ER Y AS-DELIVERED AS-TESTED AS-BUILT PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) |8

Enterprise Engineering N M O TI O DE LA LI U M SI NG VIRTUAL NEEDS DE L N G IV SI DE ER Y SOLUTIONS PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 18 -00101 -BDS) |9

Enterprise Engineering MBE Diamond Symbol N M O TI O DE LA LI U M SI NG VIRTUAL DIGITAL THREAD SOLUTIONS DE L N G IV SI DE ER Y NEEDS PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) | 10

Enterprise Engineering MBE Diamond Symbol VIRTUAL NG N M O TI O DE LA LI U M DIGITAL THREAD DE L N G IV SI DE The bottom-half of the diamond represents the physical systems (retaining the traditional SE “V” flow) The Virtual and Physical paths are concurrent and inform each other across the lifecycle ER Y Integrated NEEDS physical & virtual development is represent from left to right. The interior of the diamond represents the Digital Thread linking models or simulations to the design of the physical systems SI The top-half of the diamond represents the virtual representation of the physical systems The circle represents the integrated development of the product, production system, and services and support systems PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 18 -00101 -BDS) | 11

Enterprise Engineering Transforming Systems Engineering to an MBE Environment 2020 s MBE Diamond O ion M po sit ec om N d. R rat VE RY N LI G SI Implementation Development Processes DE Int n Document/Approval DE itio eg fin De ion Unit / Device Test Plan nd DIGITAL THREAD an na itio os Subsystem Verification Plan (Subsystem Acceptance) O mp co De System Verification Plan (System Acceptance) TI DE LI LA U M System Validation Plan SI Lifecycle Processes NG 1990 s SE V SOURCE: US Department of Transportation Federal Highway Administration Source: Boeing Moving from a document era to a digital engineering era with information flow across the lifecycle Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) | 12

Enterprise Engineering Questions? d e s a B l ing e d Mo gineer ad En st a f u j s i SOURCE: https: //knowyourmeme. com/photos/1346065 -steven-crowders-change-my-mind-campus-sign Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. | 13

Enterprise Engineering Copyright © 2020 Boeing. All rights reserved.

Enterprise Engineering MBE Diamond Symbol VIRTUAL MODEL BASED PRODUCTION PLANNING VIRTUAL CERTIFICATION VIRTUAL OPERATIONS NG N M O TI O DE LA LI U M MODEL BASED SYSTEMS ENGINEERING BUSINESS MODEL VIRTUAL QUALIFICATION SI MODEL BASED DEFINITION VIRTUAL PRODUCTION SYSTEM MARKET (MISSION) MODEL VIRTUAL SUPPORT DIGITAL THREAD NEEDS SOLUTIONS AS-NEEDED AS-SUPPORTED AS-OFFERED AS-DELIVERED AS-CERTIFIED N DE L G IV SI ER Y DE ASSPECIFIED AS-DESIGNED AS-PLANNED AS-TESTED AS-BUILT PHYSICAL Copyright Boeing. Allrights reserved. Copyright©© 2020 Boeing. reserved. Approved for Public Release (RROI 19 -00155 -BDS) | 15
- Slides: 15