Entergy Transmission Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 1

Topics • • 2005 – 2006 Transmission Reliability Projects 2006 – 2008 Transmission Expansion Projects 2009+ Transmission Target Areas 2005 Transmission Infrastructure Projects (Asset Management) 2

Caveats on Proposed Transmission Reliability Projects • Cost estimates provided, in most circumstances, are planning-level estimates. In addition, these costs do not include overhead and tax gross-up, which could be as high as 70% of the costs cited. • Siting of new generation and load growth could affect the timing and necessity of the proposed projects. • Most of the proposed projects, which are subject to Jurisdictional review and approval, have not yet been budgeted. External considerations (i. e. , out-of-cycle projects or budget adjustments during the year) could impact the proposed in-service dates. 3

Transmission Area Planners A. B. Little Rock W. Monroe Beaumont Jackson Baton Rouge New Orleans Note: Geographic boundaries are approximate. 4 Arkansas Stacy Hamilton (504) 310 -5451 Mississippi Mark Haydel (504) 310 -5856 C. Southeast Louisiana Barry Canzoneri (504) 310 -5813 D. Southwest Louisiana and North Louisiana Terrence Griffin (504) 310 -5817 E. Texas Steve Berry (504) 310 -5582 Manager: Doug Powell (504) 310 -5810

Transmission Project Development A. Arkansas Jerry Reed B. Mississippi and North Louisiana Rick Bewley 601 -368 -2005 C. Texas Chuck Hughes Ronnie Trevino 5 409 -347 -5118 409 -347 -5117 D. Southwestern Louisiana and North Louisiana Ed Brawner 337 -593 -7333 E. Southeast Louisiana Russell Saliba 504 -310 -5874 David Waddell 504 -310 -5873 Manager: Tom Lanigan Note: Geographic boundaries are approximate. 501 -490 -4703 504 -310 -5866

Transmission Services A. 6 (501) 490 -5643 B. Mississippi Dennis Broussard (504) 310 -5878 James Howard (504) 310 -5881 C. N. Louisiana, SMEPA Bob Mc. Queen (504) 310 -5867 D. Texas Carl Olson (936) 525 -2040 SW Louisiana IPPs & Cogens La. Gen Coops Carl Olson Bob Mc. Queen Analyst: Kim Mitchell (504) 310 -5879 Manager: Ollie Burke (504) 310 -5864 E. Note: Geographic boundaries are approximate. Arkansas Mike Doyle

OASIS-Posted Information Entergy’s OASIS Web Site Address: http: //oasis. e-terrasolutions. com/OASIS/EES – Planning models – Generation interconnection studies status Check out the brand-new link for Planning Summit Information! 7

New Link 8

All presentations for this Summit http: //oasis. e-terrasolutions. com/OASIS/EES 9

Load Growth Projections Hot Springs Record System Peak: 22, 052 MW 1 EAI 5, 533 MW with AECC 6, 865 EGSI 7, 042 MW ELI 5, 124 MW EMI 3, 130 MW ENOI 1, 223 MW Little Rock Jackson (1) This demand level is the all-time peak demand on the Entergy system less AECC, which occurred on 8 -30 -2000. With AECC, the peak was 23, 384 MW. W. Monroe Baton Rouge Conroe New Orleans Beaumont 10
- Slides: 10