Engineering H 193 - Team Project Final Report – An Overview Week 4 Day 2 Spring Quarter Gateway Engineering Education Coalition 1
Engineering H 193 - Team Project FINAL REPORT PURPOSE • Document what has been done so that: • Boss/Customer/Peers can evaluate your work • Others can duplicate your work (w/ the project notebook) AUDIENCES: • Upper Manager (no details) • Responsible line manager • Technical people Spring Quarter Gateway Engineering Education Coalition 2
Engineering H 193 - Team Project FINAL REPORT SECTIONS OF REPORT • • Title Page Executive Summary (one page or less) Body of Report Appendices Spring Quarter Gateway Engineering Education Coalition 3
Engineering H 193 - Team Project FINAL REPORT -- CONTENTS 1. Executive Summary 2. Table of Contents 3. List of Figures & List of Tables 4. Introduction 5. Preliminary Concepts 6. Design Analysis 7. Preliminary Testing and Refinements 8. Final Design 9. Final Competition 10. Summary and Conclusions 11. References 12. Appendices Spring Quarter Gateway Engineering Education Coalition 4
Engineering H 193 - Team Project FINAL REPORT TITLE PAGE • • Project Title Team Number/Name Team Members Course #, Date, Section, Instructor Spring Quarter Gateway Engineering Education Coalition 5
Engineering H 193 - Team Project FINAL REPORT EXECUTIVE SUMMARY (typical contents) • • • What was the problem Why was it important to solve What method was used to solve it What was the final design How well did the final design work What should be done to improve the performance next time Spring Quarter Gateway Engineering Education Coalition 6
Engineering H 193 - Team Project FINAL REPORT TABLE OF CONTENTS Section Spring Quarter Title Gateway Engineering Education Coalition Page 7
Engineering H 193 - Team Project FINAL REPORT LIST OF FIGURES Figure No. Figure Description Page LIST OF TABLES Table No. Spring Quarter Table Description Gateway Engineering Education Coalition Page 8
Engineering H 193 - Team Project FINAL REPORT INTRODUCTION – Statement of problem – Why is it important to solve problem – Organization of the report Spring Quarter Gateway Engineering Education Coalition 9
Engineering H 193 - Team Project FINAL REPORT PRELIMINARY CONCEPTS • Introduction • Requirements and constraints • Brainstorming • process • results • Descriptions of preliminary concepts • words • sketches • mockup • link words, sketches, mockup(s) Spring Quarter Gateway Engineering Education Coalition 10
Engineering H 193 - Team Project FINAL REPORT ANALYSIS • How you moved from preliminary concepts to final design – Indicate Decisions and why you made the decision • Analysis and calculations done • Tests conducted (including preliminary competition) • What was learned from the tests • How product was refined following tests Spring Quarter Gateway Engineering Education Coalition 11
Engineering H 193 - Team Project FINAL REPORT FINAL DESIGN • Description of final design • Features and Strengths • Drawings of robot • chassis • drive train (motor to wheels on the track) • electrical system & sensors • mechanism for picking & picking up objects • mechanism for depositing objects Spring Quarter Gateway Engineering Education Coalition 12
Engineering H 193 - Team Project FINAL REPORT FINAL COMPETITION • • Description of the competition Strategy your team followed Results of competition Brief analysis of reasons for success or failure Spring Quarter Gateway Engineering Education Coalition 13
Engineering H 193 - Team Project Final Report • Start putting the final report on disk(s) now. • Put in the outline – Add more detail to the outline provided on slide 4. Example – 5 – Preliminary Concepts • a – Idea one – i – features – Ii – potential problems • b – Idea two • c – Idea three • d – Mockup of Idea ? • Put in a page for the Table of Contents • Put in a page(s) for the Lists of Figures and Tables • Put in a page that says Appendices • Your outline is due Monday, Week 5 Spring Quarter Gateway Engineering Education Coalition 14
Engineering H 193 - Team Project Grade Sheet for Outline of Final Report Item Cover Page 1 Outline Format 6 Major Sections / Content 10 Clarity / Neatness 3 TOTAL Spring Quarter Points Gateway Engineering Education Coalition 20 15