Engineer Training XL 1200 Pneumatics Engineer Training Working

  • Slides: 14
Download presentation
Engineer Training XL 1200 Pneumatics

Engineer Training XL 1200 Pneumatics

Engineer Training Working Concept Overview: The Pneumatic System is comprised of: q Y Pistons

Engineer Training Working Concept Overview: The Pneumatic System is comprised of: q Y Pistons q Z Pistons q Ink Purge q Pneumatic Panel Confidential XL 1200 Pneumatics 2

Engineer Training Y Pressure Roller Pistons q The pistons are controlled by the Pneumatic

Engineer Training Y Pressure Roller Pistons q The pistons are controlled by the Pneumatic Panel, and they work with an air pressure of 2. 5 bar. q The pressure roller has a total of 3 -5 pistons depending on the machine. q The speed of these pistons can be regulated. Confidential XL 1200 Pneumatics 3

Engineer Training Z Shaft q This shaft is controlled by two pistons, which hold

Engineer Training Z Shaft q This shaft is controlled by two pistons, which hold the Z rubber Roller. q The Pressure used is 4. 5 Bar. q The speed of those pistons can also be controlled, and for safety reasons it should be very slow. q The Off position in this Axes, is when the pistons are UP. If there is a loss of pressure, the roller has two springs which lift or maintain the roller in the upward position. Confidential XL 1200 Pneumatics 4

Engineer Training Ink Purge We use air pressure of 0. 8 bar to clean

Engineer Training Ink Purge We use air pressure of 0. 8 bar to clean the heads q For this we have two air valves for each color. q Each air valve controls 4 heads, and the valve splits to two outputs, one for each partition of the secondary tank. Confidential XL 1200 Pneumatics 5

Engineer Training Pneumatic Panel q This Panel controls the Z pistons and Y pistons.

Engineer Training Pneumatic Panel q This Panel controls the Z pistons and Y pistons. It also regulates and displays the air pressure for the pistons as well as for the Ink Purge. q The Panel is also included in the safety system. If the Emergency Stop button is pressed, all air supply to the system will be cut off. Confidential XL 1200 Pneumatics 6

Engineer Training Pneumatic Panel The Panel is comprised of the following: On / Off

Engineer Training Pneumatic Panel The Panel is comprised of the following: On / Off Buttons: q 3 Valves q 2 Filters q 2 timers q 3 Gauges q Pressure Regulators q Main switch Confidential XL 1200 Pneumatics 7

Engineer Training ON / OFF Buttons These 4 buttons control the Z and Y

Engineer Training ON / OFF Buttons These 4 buttons control the Z and Y pistons in the following way. q On Y, when the Green Button is pressed, the pressure roller goes UP. The green button lights. q On Z, when The Green Button is pressed, the rubber shaft goes down. The green button lights. q Pressing either Red Button, turns OFF each Shaft; Y goes down, Z goes UP. Red Button Lights. Confidential XL 1200 Pneumatics 8

Engineer Training TIMERS There are 2 safety timers which control the delay of each

Engineer Training TIMERS There are 2 safety timers which control the delay of each shaft before it starts to move. After pressing any button, an alarm goes off, while the delay is present. You can adjust this delay in the timers, by rotating the little dial in them, and setting the desired number. The units are in seconds, but this can be changed. The timer has 4 dip switches. The first 2, define the time range and the last 2 the mode. The Correct setting, should be 1 up, and the rest down, so that the range is in seconds. Confidential XL 1200 Pneumatics 9

Engineer Training REGULATORS AND FILTERS There are 2 water filters in the panel. The

Engineer Training REGULATORS AND FILTERS There are 2 water filters in the panel. The first one on the bottom, filters the whole system from water, and the second one is for Ink purge, because it is more sensitive. There are 3 regulators, one for each function, Z, Y, and Ink Purge. Adjust the pressure by Turning the black top cap. Confidential XL 1200 Pneumatics 10

Engineer Training Gauges and Main Air Valve There are three gauges, one for each

Engineer Training Gauges and Main Air Valve There are three gauges, one for each section. They display the current pressure applied: q The first for Ink Purge (0. 8 bar) q Second Y pistons (2. 5 Bar) q Third Z pistons (4. 5 Bar) The main Ink Valve, opens and closes the entrance of Air to the whole system. Confidential XL 1200 Pneumatics 11

Engineer Training VALVES There are 3 electronic valves in the panel. One is for

Engineer Training VALVES There are 3 electronic valves in the panel. One is for the safety system, which cuts all air entrance if emergency is pressed. And the other two are for the Y and Z piston control. Confidential XL 1200 Pneumatics 12

Engineer Training Confidential General Diagram. XL 1200 Pneumatics 13

Engineer Training Confidential General Diagram. XL 1200 Pneumatics 13

Confidential 14

Confidential 14