ELIMEDELIMAIA Beamline development Gallo Giuseppe Costa Michele Jun
ELIMED-ELIMAIA Beamline development Gallo Giuseppe Costa Michele Jun 9, 2015 1
Outline 2 • Positioning of components and related loads. • Positioning of service channels. • Outline of vacuum systems. • Nominal size of the beam line respect to ground. • PMQ Chamber.
Positioning of components and related loads. 3 ~1, 5 t ~3, 5 t N. D. ~0, 2 t ELIMAIA interaction chamber PMQ CHAMBER Selector Conventional Quadrupoles ~1, 5 m 2 ~0, 8 m 2 Service channel ~0, 8 m 2 ND m 2 Dosimetry 2, 8 m 2
Positioning of components and related loads. whole ELIMED beam line. 2000 mm It is the bulkier and heavier element of the ~1100 mm Is helpful to see the dimensions of dipole. A procedure to carry and assembly the system in the experimental area must be provided. 90 0 m m m 900 m
Positioning of service channels This slide reports the positions of services channels compared to the end of the interaction chamber. Interaction chamber 644 mm 9700 mm SERVICE CHANNEL
• Outline of vacuum systems The remaining beam line, should be equipped with DN 100 CF Conflat standard flange. ISO F to CF standard flange adaptor
• Outline of vacuum systems So far , we foreseen two gate valves. . , On the PMQ chamber we use: • Penning and Pirani vacuum gauges for vacuum measurement. • Flanges, fittings and ancillary to connect roughing vacuum.
• Outline of vacuum systems As the PMQ’s chamber is connected to the Interaction chamber the «Roughing vacuum» , is common. «T. M. P. dry» , will be positioned …. , In particular this pump, will be equipped by ISO – F flange, moreover it will be water cooled. F. C.
• Outline of vacuum systems The «Backing vacuum » , will be made by T. M. P dumping, connect with the central system facility. To central system
1300 mm • Nominal size of the beam line as respect to floor.
• PMQ Chamber. 860 862 1080 Supplementary ways for: • • • Vacuum Mesurements Connectors All panels drills, are ISO F standard. Diagnostic Bea m lin e
• PMQ Chamber. End of Interaction chamber Pillar X A Design in progress. Interaction chamber bench «A» , final design is necessary to the determination of the pillar exact position.
• PMQ Chamber. «PMQ» components and devices integration’s, is in progress
• PMQ Chamber. …. however : SIDE 1 See Francesco’s talk!
CONCLUSION • Positioning of components and related loads. • • Partly defined. Positioning of service channels. • • Outline of vacuum systems. • • Defined, but, . . (required water cooling chracteristics) Nominal distance of the beam line respect to the floor. • • We need. PMQ Chamber. • Work in progress. …. Thank you for attention.