Electronics City Industrial Township Authority Town Hall 15 th December 2017

Electronics City Industrial Township Authority Town Hall 15 th December 2017

ELCITA Committee 2017 -2020 1. 2. 3. 4. 5. 6. Mr. Hari Hegde –

ELCITA Committee 2017 -2020 1. 2. 3. 4. 5. 6. Mr. Hari Hegde – Chairman, ELCITA Mr. Charles Henry Hawkes – Committee Member Mr. Kiron Shah – Committee Member Mr. Babu Rangaswamy – Committee Member Mr. Ramachandran R – Committee Member Mr. Raghunandan – Invited Member (President, ELCIA) 7. Mr. Ramesh R – Committee Member, Director, Industries and Commerce Dept, Go. K 8. Mr. Prakash GT – Committee Member, Deputy Secretary, Urban Development Dept, Go. K 9. Mr. Anil Kumar – Committee Member, President, Doddathogur Panchayat

Township Management

Township Management

Roads Completed West Lane 9 East Avenue 5 Roads completed – 5. 7 km

Roads Completed West Lane 9 East Avenue 5 Roads completed – 5. 7 km Roads planned – 1. 0 km

Drains and Pavements RCC drains completed – 1. 7 km Pavements completed – 3.

Drains and Pavements RCC drains completed – 1. 7 km Pavements completed – 3. 0 km RCC drains planned – 3. 2 km Pavements planned – 3. 0 km

Junction Improvements - Completed J 036 Junction J 003 Junction J 021 Junction

Junction Improvements - Completed J 036 Junction J 003 Junction J 021 Junction

Junction Improvements – Planned J 005 Junction J 069 – Y Junction East phase

Junction Improvements – Planned J 005 Junction J 069 – Y Junction East phase

Reclaiming of Pavement - Completed West Avenue 8 – Pump house road

Reclaiming of Pavement - Completed West Avenue 8 – Pump house road

Reclaiming of Pavement – In progress Compact RMUs installation under progress – 5 Nos

Reclaiming of Pavement – In progress Compact RMUs installation under progress – 5 Nos Compact RMUs installed – 3 Nos UPS 6 KVA installed – 3 Nos

Thank you - Citizens Junction improvement and reclaiming pavement ØInfosys ØWipro ØSiemens ØSritronics Ø

Thank you - Citizens Junction improvement and reclaiming pavement ØInfosys ØWipro ØSiemens ØSritronics Ø 3 M – final approval awaited

Street Light Poles and LED Modified street light pole – 112 New street light

Street Light Poles and LED Modified street light pole – 112 New street light poles installed – 28 Pole modification planned – 111 New street light pole planned – 192

Town Planning SLA for License – 1 week, if all the documents are in

Town Planning SLA for License – 1 week, if all the documents are in order

Water Management • Two 15 HP pumps installed • New water tanker procured <5%

Water Management • Two 15 HP pumps installed • New water tanker procured <5% leakage Digital water meters planned

Solid Waste Management First Batch • Target – Recycling to Increase by 20% •

Solid Waste Management First Batch • Target – Recycling to Increase by 20% • Achieved – 20. 4 % Second Batch • Target – Recycling to increase by 20% Partners

Organic Waste Treatment Plant Segregation of road waste as leaf litter, dry waste and

Organic Waste Treatment Plant Segregation of road waste as leaf litter, dry waste and reject waste Dry waste sent for recycling Leaf litter composted Organically Ø 15 tons of compost produced Ø About 7 tons of compost sold Ø Companies can buy compost from ELCITA

E-Waste Disposal for Small & Medium Companies E- Waste Collection Centre Segregated E- Waste

E-Waste Disposal for Small & Medium Companies E- Waste Collection Centre Segregated E- Waste Total tubelights/ CFLs saved from land filling - 4 tons X Companies

Sewage Treatment Plant 300 KLD CSTP Extended aeration activated sludge system 8 KLD Soil

Sewage Treatment Plant 300 KLD CSTP Extended aeration activated sludge system 8 KLD Soil Biotechnology STP 7 KLD e-SBR STP Operational • 300 KLD at ELCIA Park • 7 KLD at ELCITA Office • 8 KLD at Fire Station STP Planned • KIADB • PUMP HOUSE

Smart City Pilot Completed – West Avenue 1 Waste, environment, e-Toilet, parking Phase-1 under

Smart City Pilot Completed – West Avenue 1 Waste, environment, e-Toilet, parking Phase-1 under progress Ring 1 – ELCIA-West avenue 1, 8, 2, ELCIA

Smart City Pilot - completed • Command control platform and surveillance system Ø West

Smart City Pilot - completed • Command control platform and surveillance system Ø West Avenue 1 o SWM, environmental, e. Toilet, vehicle management, Parking, lighting o 14 cameras on Switch network using optical fibre Ø Waste management Phase 1 – in progress • Ring 1 optical fibre and GPON network completed • 50 cameras installed • Data and Video analytics for managing resources • Smart water meter and lighting for the entire ring 1

Urban Mobility

Urban Mobility

Traffic Management • Vehicular traffic inside Electronics City Ø Critical issue requiring urgent attention

Traffic Management • Vehicular traffic inside Electronics City Ø Critical issue requiring urgent attention • Options Ø Pooled vehicle use Ø Use of public transport Ø Metro Ø Staggered timings • Most important Ø Disciplined driving Ø Observing parking instructions • One way within West phase Ø Under discussion

Other Updates • Namma Metro Ø 90% of the land acquisition on Hosur Road

Other Updates • Namma Metro Ø 90% of the land acquisition on Hosur Road completed Ø Road from Toll to Petrol pump blocked - Will be opened within 3 months Ø Service road will be completed before starting other works • Parking Ø Seeking land for car park and helicopter service to KIA • Skywalk (FOB) will be started shortly Ø Approved by NHAI • Common Bus system Ø under consideration

Namma Metro Station 1

Namma Metro Station 1

Namma Metro Station 2

Namma Metro Station 2

Skywalk between East and West Phase

Skywalk between East and West Phase

Governance and Finance • • Credit rating for ELCITA being pursued Process simplification and

Governance and Finance • • Credit rating for ELCITA being pursued Process simplification and process metrics Process certification being pursued Town hall twice a year Review of all the IT systems and processes planned Revenue recognition at 87% Operational expenses 19% higher than revenue Under-recovery for CISF deployment

Budget update 27

Budget update 27

Budget update 28

Budget update 28

New Initiative - Biodiversity Transform Electronics City in to a major Ecological/ Bio-diversity Hub

New Initiative - Biodiversity Transform Electronics City in to a major Ecological/ Bio-diversity Hub • Enhancement of greenery, supporting migratory birds Ø Protection of Trees • Benchmark with the best cities to develop a set of leading operational practices for the Township • Plan for long term water sustainability – Lake rejuvenation, water conservation and reuse • Sustainable energy management – increase share of renewable energy; encourage energy saving measures • Plan and develop biodiversity parks

New Initiative - Beautification Make Electronic City a Green and Aesthetically appealing Township •

New Initiative - Beautification Make Electronic City a Green and Aesthetically appealing Township • Develop Beautification and Greening plans – Engage an architect or town planner to draw out the plans and execute them Ø Well designed, pedestrian friendly Roads, Pavements, Crossings Ø Junction Improvements Ø Green cover both inside and outside campuses Ø Beautification in common spaces Ø Development of an aesthetic norm for the Township

New Initiative- Culture and Communication • Electronics city Habba planned during mid 2018 Ø

New Initiative- Culture and Communication • Electronics city Habba planned during mid 2018 Ø 2/3 day festival to showcase various streams of arts, literature and culture Ø Spread across multiple (walkable) venues and interconnecting spaces as artistic boulevards Ø Service road will be completed before starting other works • Communication strategy Ø Internal and External

Thank You

Thank You

“ Our Objectives and Vision Make Electronic City a Model Township; In that, the

“ Our Objectives and Vision Make Electronic City a Model Township; In that, the practices and standards is a lighthouse not only in the country but is replicable in the developed world. • Key driver is to take ELCITA to the next level; build a smart city • Opportunity to be an urban lab to test and define parameters for future urban townships

Achieving the Vision Planning Greening and Beautification Governance and Finance Mobility Township Services Infrastructure

Achieving the Vision Planning Greening and Beautification Governance and Finance Mobility Township Services Infrastructure Plan Township Planning Smart City Ecological Sustainability Communicatio n and Cultural Integration