Electric Road Systems An option for the Future

  • Slides: 10
Download presentation
Electric Road Systems An option for the Future of Core Network Corridors May 2015

Electric Road Systems An option for the Future of Core Network Corridors May 2015 Restricted © Siemens AG 2015 All rights reserved. siemens. com/answers

EU Transport challenges. The WHY and the HOW. • Road freight CO 2 -emissions

EU Transport challenges. The WHY and the HOW. • Road freight CO 2 -emissions are forecast to continue rising WHY • Avoid-Shift-Reduce • Road freight will continue to play a large role in the transportation system Electric Road System (ERS) • Electrification is twice as energy efficient and enables the use of renewable energy • Battery power for long distance road haulage is not practical HOW • On heavily used roads, continuous and dynamic supply of electricity is an option. This is called Electric Road System (ERS) Restricted © Siemens AG 2015 All rights reserved. Page 2 2015 -04 -21 Siemens AG / MO TI EH / Akerman

Siemens e. Highway test track today - What an electric road on a corridor

Siemens e. Highway test track today - What an electric road on a corridor could look like Film clip http: //www. mobility. siemens. com/mobility/global/en/interurban-mobility/road-solutions/electric-powered-hgv-traffice. Highway/electric-mobility-in-commercial-vehicles/Pages/electric-mobility-in-commercial-vehicles. aspx Scania © Restricted © Siemens AG 2015 All rights reserved. Page 3 2015 -04 -21 Siemens AG / MO TI EH / Akerman

Road electrification is especially attractive on highly frequented routes e. Highway application fields Shuttle

Road electrification is especially attractive on highly frequented routes e. Highway application fields Shuttle transport Electrified mine transport Electrified long-haul traffic § Solution for high frequency shuttle transport over short and medium distances (<50 km) § Connection of pits and mines to storage or transit locations § Economical and sustainable alternative for road freight transport § Minimization of harmful emissions § Significant reduction of CO 2 emissions § Sustainable, clean and economical mine operation § Substantial cost savings for freight carriers § Lower fuel consumption and longer lifetime § Reduction of air and noise pollution Restricted © Siemens AG 2015 All rights reserved. Page 4 2015 -05 -06 Siemens AG / MO TI EH / Akerman

Scan. Med Corridor as the start of an EU-wide ERS • Sweden is procuring

Scan. Med Corridor as the start of an EU-wide ERS • Sweden is procuring ERS demonstrations in June 2015 • Germany is already funding ERS developement • Scan. Med corridor could play a vital role to accellerate implementation • Pilot projects along or on the corridor • Evaluation of ERS implementation on the whole corridor • Exploring synergies with other Core Network Corridors on the topic of ERS Restricted © Siemens AG 2015 All rights reserved. Page 5 2015 -05 -06 Siemens AG / MO TI EH / Akerman

Thank you for listening! Tina Karlberg City Account Manager Siemens AB Phone: +46 8

Thank you for listening! Tina Karlberg City Account Manager Siemens AB Phone: +46 8 728 12 89 tina. karlberg@siemens. com Innovating the electrical world. Restricted © Siemens AG 2015 All rights reserved. Page 6 2015 -05 -06 Siemens AG / MO TI EH / Akerman

Renewable energy offers a solution, but there are significant differences in efficiency of energy

Renewable energy offers a solution, but there are significant differences in efficiency of energy paths Pathway Range Cost per km Efficiency WTW Example vehicle Electric Road Systems Grid (incl. e- catenary) e- 96 k. Wh e. Truck (Catenary. Hybrid) 60 km 19 ct/km 77 % 48 km 20 ct/km 62 % 24 km 55 ct/km 29 % 17 km 70 ct/km 20 % 1, 6 k. Wh/km 12 ct/k. Wh Battery e- e- Grid 96 k. Wh e. Truck (Battery) 2 k. Wh/km 10 ct/k. Wh Hydrogen Fuel cell truck 2, 7 k. Wh/km Power-to-Gas Gas-truck Restricted © Siemens AG 2015 All rights reserved. Page 7 2015 -05 -06 Source: German Ministry of Environment 3, 2 k. Wh/km Siemens AG / MO TI EH / Akerman

Yes, but does it work? No concessions on truck availability and performance § No

Yes, but does it work? No concessions on truck availability and performance § No decrease on axle weight rating and load capacity § Full electric operation up to maximum highway speed Operability in all traffic situations § Passing § Cutting in / out of lanes § Full electric idling Adaptable to all situations § Overhead line solutions for bridges, interchanges, tunnels and low clearances § No system change in established point-to-point connections Restricted © Siemens AG 2015 All rights reserved. Page 8 2015 -05 -06 Siemens AG / MO TI EH / Akerman

ERS in Sweden Pre-Commercial Procurement of demonstration Process Specifics § Trafikverket (the Swedish Transport

ERS in Sweden Pre-Commercial Procurement of demonstration Process Specifics § Trafikverket (the Swedish Transport Administration) initiated an Pre-Commercial Procurement Process (PCP) for demonstration projects with electric road systems (ERS) for heavy transport (>16 tons) with a budget of app. 11, 5 M€ § Aim of the call: Realization of demonstration projects to evaluate different ERStechnologies prior to a potential introduction on the Swedish road network Time line as announced by the customer Phase 1: Phase 0: Submission 1) Concept Call issued of Application description 07/13 1) Each 10/13 12/13 Phase 2: Awarding Submission 1) of concept description detailed design 02/14 05/14 Submission 1) of detailed design Phase 3: Awarding realization Project Start & 2 years demonstration 03/15 05/15 06/15 submission is followed by an evaluation by the customer with a Go/No. Go for the process as a whole and the individual competitors Project scope § 2 km of infrastructure on a highway § Hybrid trucks supplied in cooperation with Scania Restricted © Siemens AG 2015 All rights reserved. Page 9 2015 -05 -06 Siemens AG / MO TI EH / Akerman

ERS in the U. S. Demonstration project General project information § Very high volume

ERS in the U. S. Demonstration project General project information § Very high volume of road freight traffic due to the ports. AQMD (Air Quality Management District) is pursuing environmental relief for the LA metropolitan area § Siemens e. Highway concept as chosen solution § Goal: To promote the implementation of zero emission goods movement technologies, and to demonstrate the most viable technology to be adopted for a future, regional zero-emissions corridor Timeline Proposal submitted 02/13 AQMD Board approval 04/13 Start of project External approvals received 07/14 03/15 Infrastructure commissioned and start of demonstration Fall 15 End of Final report and Demonstration project close-out Fall 16 12/16 Project scope § One mile of infrastructure on Alameda St as connection to near-dock rail terminals. § Different hybrid and zero-emission trucks supplied by Volvo Trucks and local truck manufacturers Restricted © Siemens AG 2015 All rights reserved. Page 10 2015 -05 -06 Siemens AG / MO TI EH / Akerman