Estate Management 1. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc at West Phase � � � 2. West Avenue 1 –Infosys avenue West Avenue 2 – Velankani Road West Avenue 6 – Teknic to Wipro Gate 5 West Avenue 8 – Pump house Road West Avenue 9 – Petrol Bunk Road TOTAL – 17 Nos - 25 Nos – 16 Nos - 31 Nos – 18 Nos = 107 Nos Installation of New Street light pole at East Phase � East Avenue 1– Print to Tech Mahindra Rear Gate - 10 Nos � East Avenue 4 – Shanthipura Road – 14 Nos TOTAL = 24 Nos 4
Street Light Details 35 30 Axis Title 25 20 15 10 5 0 September October Total West Venue 6 West Avenue 8 West Avenue 1 West Avenue 2 (Teknic to Wipro (Pump House (Infosys Avenue) (Velankani Drive) Road 10 16 16 31 17 25 16 31 7 9 0 0 West Avenue 9 (Petrol Bunk Road) 18 0 18
Estate Management 3. Pavement with Tiles Completed = 900 Sqm 4. Pavement with Pavers Completed = 2500 Sqm 5. Road Asphalting works = 5. 30 Kms (Work not yet started due to Continuous Rainfall) 6. Foot Over Bridge – BETPL Approval forwarded to NHAI, Final Approval from NHAI is awaited. 7. House Keeping Tender Documents forwarded to Financial Consultant (Mr. Nagaraj) for final verification.
Footpath Work – Under Progress East Avenue-4 (Shanthipura Road) East Avenue-2 (Xime Road)
Footpath Work – Completed West Avenue-8 (Near Pump House) East Lane-2 (Quasitum Road)
Road Widening – Completed West Lane-7 (Amphenol Road)
Road Widening – Completed East Avenue-1 (TCS Road)
Footpath Work – Under Progress West Avenue-9 (NRN Holdings side) West Avenue-9 (MRO Tek side)
Footpath Work – Under Progress Drain Cleaning at East Avenue-4 (Shanthipura Road) Pavers Laying opp Pump house
Footpath Work – Under Progress RCC Culvert East Avenue-4 (Near Continental) Foundation for UPS (Pump house)
Electrical Work – Completed 5 Way RMU Installed in the Electrical Yard of MGM & Amitronics
14 No’s ONT Installed and Working Camera installation in progress Midspan of Single Fibre, ONT & Camera Installation Optical Splitter installed for ONT connection
TOWN PLANNING Details FY FY 2014 FY 2015 - FY 2016 - FY 2017 2013 -15 16 17 -18 -14 Khatha 6 18 12 11 Building License 3 13 22 31 6 12 Commencement Certificate 1 4 7 17 5 Occupancy Certificate 1 Nil 6 13 5
SUSTAINABILITY E- waste collected from the following companies in September � � � Amphenol Lemon Tree hotel Hical Technologies ISBR Institute Svenska design hotel Total E- waste picked up is 650 Kg’s Compost Sold • Xysis • Ishwarya Hi Tech • Outsiders • Flextronics • Exa Thermometrics • ELCITA Trust • Hical • ELCITA Garden Total compost sold is 656 Kgs
SUSTAINABILITY Analytics and charts on Zoho software for 300 KLD STP. Data generated from Zoho software for billing and analysis from September.
SUSTAINABILITY Training of Wellingkar students on waste management. E- waste management awareness program at STPI
SUSTAINABILITY Used Pavers re-laid at SWM facility. . SWM authorization for 5 years from KSPCB.
Contract Awarded 1. Providing and laying of Asphalting using 60/70 grade bitumen from Edizi Tools to TCS gate no 3 via YJunction, (East Avenue 1& 4). East Phase. – Work not yet started due to Continuous Rainfall.
Tender Evaluation Completed 1. Replacing Existing 6 Way old type MEI make conventional type RMU by 6 Way Compact type Schneider RMU DAS specification for F-5 Feeder Eminating from Keonics Muss near M/s BHEL Ltd, Electronics City West Phase, Bangalore 560100. 2. Providing and Laying Asphalting 60 70 grade bitumen from 3 m Junction to Petrol Bunk Junction, West Lane 6 and West Avenue 9, Electronics City West Phase, Bangalore 560 100. 3. Providing & Laying Asphalting 60 70 grade bitumen along West Lane 7, 8, 9 and 10, West Avenue 11 Electronics City West Phase, Bangalore 560 100. 4. Providing & Laying Asphalting 60 70 grade bitumen from Konar to KPTCL, West Avenue 3 and 5 Electronics City West Phase, Bangalore 560 100. 5. Providing & Laying Asphalting 60 70 grade bitumen along East Avenue 5 Electronics City West Phase, Bangalore 560 100.
Tender Under Evaluation 1. Shifting of Pole, Erecting of Spun Pole, Relocation of Transformer & Raising of Transformer by installing new Spun Pole for Junction Improvements at 3 m & BHEL Side, Electronics City West Phase, Bangalore 560100.
Contracts on Anvil 1. Providing House Keeping Services to ELCITA within e-city Industrial Township Area. 2. Providing Services for Solid Waste Management to ELCITA within ecity Industrial Township Area. 3. Providing Services for lifting sewage/Treated water by using Tanker Vehicle within e-city Industrial Township Area. 4. Construction of 400 KLD STP in KSSIDC Land, West Phase. 5. Construction of 500 KLD STP in KIADB Land, East Phase.
Thank You
- Slides: 23