Smart City Project Initiatives for Test bed M/s Velankani (By Design) have provided 50

Smart City Project Initiatives for Test bed M/s Velankani (By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress. 4

Smart City Project Initiatives for Test bed 43 Nos of Modified Street light poles

Smart City Project Initiatives for Test bed 43 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road. 4

Smart City Project Initiatives for Test bed Smart Water Meter supplied by M/s GAIA

Smart City Project Initiatives for Test bed Smart Water Meter supplied by M/s GAIA has been installed in IFIM. TCL are providing the network Connectivity. 4

Smart City Project Initiatives for Test bed � � M/s Tejas Network are providing

Smart City Project Initiatives for Test bed � � M/s Tejas Network are providing Network design for entire EC & POE switches for the cameras on the test bed. M/s Multiproe have been finalized for supply & installation of Video wall at our command Centre. M/s Wipro Ltd are the integrated partner for Smart City Interface. M/s P Park E are providing parking sensors through LORA network. 4

LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase

LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to

PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSED 400 KLD STP at KSSIDC COMPLEX

PROPOSED 400 KLD STP at KSSIDC COMPLEX

Estate Management 1. Modification of existing street light poles with LED lights, Splitters, Camera,

Estate Management 1. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc � West Avenue 1 –Infosys avenue � West Avenue 8 – Pump house Road 2. E – Toilets 3. Estate survey ◦ Final Data check & Software Training work in progress � 20 e-toilets Installed & Operational 4

Footpath Works – Completed Footpath Work along East Avenue 1 (TCS Road) Footpath Work

Footpath Works – Completed Footpath Work along East Avenue 1 (TCS Road) Footpath Work along West Lane 1 (MSME Road)

Footpath Works – Completed Footpath & Drain Work along East Lane 1 (Hical Road)

Footpath Works – Completed Footpath & Drain Work along East Lane 1 (Hical Road)

Footpath Works – Completed RCC Culvert near Erkadi Systems – West Avenue 2 Footpath

Footpath Works – Completed RCC Culvert near Erkadi Systems – West Avenue 2 Footpath works near Erkadi Systems – West Avenue 2

Footpath & Drain Works – Under Progress West Avenue-9 (Petrol Bunk Road) 13 West

Footpath & Drain Works – Under Progress West Avenue-9 (Petrol Bunk Road) 13 West Avenue-8 (Police Station Side)

Footpath Works – Under Progress Footpath works near Siemens – West Avenue 1 Pavers

Footpath Works – Under Progress Footpath works near Siemens – West Avenue 1 Pavers Laying Work near C-dot (West Avenue – 1)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (HP Avenue)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (HP Avenue) 3 KL Capacity UG Sump for EToilet (BWSSB)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (Opp DMart)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (Opp DMart) 3 KL Capacity UG Sump for EToilet (Tech Mahindra)

Fabrication Work – Under Progress Providing MS Railing for pedestrian safety – West Avenue

Fabrication Work – Under Progress Providing MS Railing for pedestrian safety – West Avenue 1 (Infosys Avenue)

Other Works – Completed 2 Nos of Cattle trap at 300 KLD STP Sewer

Other Works – Completed 2 Nos of Cattle trap at 300 KLD STP Sewer line works opp HICAL East Avenue 3 (Tech Mahindra Road)

Fabrication Work – Completed Chain-link fencing for Siemens RMU Yard

Fabrication Work – Completed Chain-link fencing for Siemens RMU Yard

Estate Management Contract Awarded • • Proposed construction of Drains, laying of Pavers, Kerb

Estate Management Contract Awarded • • Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase Providing and laying of Asphalting using 60/70 grade bitumen • from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase • Along Café Corner & JP IT Park Road 20

Estate Management Contracts on Anvil • • • Providing House Keeping Services to ELCITA

Estate Management Contracts on Anvil • • • Providing House Keeping Services to ELCITA within e-city Industrial Township Area. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs • Erkadi System to Arvind Mills (West Phase) Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase. 21

SUSTAINABILITY Total E-waste Disposed – 4 Tons Total compost Sold and used – 6

SUSTAINABILITY Total E-waste Disposed – 4 Tons Total compost Sold and used – 6 Tons Total waste managed for last two years Paper recycled 255. 7 Tons Plastic recycled 370. 8 Tons Metal recycled 21. 5 Tons Glass recycled 87 Tons Other Dry waste recycled 57. 6 Tons Total Dry Waste recycled 792 Tons Average capacity use of ELCITA STP - 200 KLD