ELCITA UPDATE July 2019 FOB 3 ELEVATORS OPENED
ELCITA UPDATE July 2019
FOB – 3 ELEVATORS OPENED TO PUBLIC ON 04 -07 -19
RCC DRAIN & FOOTPATH West Avenue 10 (Towards Fire station) West Lane 1 (Titan Opp Side)
3 M RELINQUISHED LAND FOR JUNCTION WIDENING COMPLETED WITH ASPHALTING
Implementation of 11 Traffic signals Shantipura junction Wipro junction Yokogawa junction Canara bank junction Velankani junction Oterra junction Print point junction Petrol pump junction Newtown junction
Implementation of Dynamic traffic control system - 6 Junctions Oterra Signal junction
4 Shuttle Bus – User’s data Ø April - 5998 Ø May - 9155 Ø June - 16231
Sewage Treatment Plant Sl. NO. Month Total Raw Water Total Treated Water Efficiency 1 June 5264 5093 96. 75% 2 May 5756 5617 97. 5% 3 April 5859 5686 97. 04% Sl. No. STP with Quantity 1 CSTP -300 KLD Description of Work Status of work Purchased Consumables and oil for maintenance Work completed Sewage submersible pump service Work completed Flow meter – Repair & service Work completed 2. E-SBR 7 KLD Filter Feed Pump service Work completed 3. SEPTAGE MANAGEMENT Project completed with Final report submission Work completed 4. SBT 8 KLD Panel revamping work Work completed Removed unwanted grass and declogging of pipeline throughout SBT Bed Work completed
Sl. No. 4. STP with Quantity ABR SBT - 9 KLD Description of Work Status of work Reconstructed the Grease trap chamber 1 & 2 at 9 KLD ABR STP Work completed Removal of scum over all 4 ABR chamber Work completed Jet aerator and Pump re-connection and service Work completed Joint inspection has done with Eram scientific & Mom prepared regarding the inspection Work completed Requesting for strickering quotation for 7 Units Work under progress Re-welded floor of E-toilet at ELCIA complex Work Completed Replacement of Temporary gasket to the old kam-avida vehicle (KA 51 6287) Work Completed Replacement of Temporary gasket to the NEW kam-avida vehicle and Minor repair has been done by Prerana Motors (KA 51 0225) Work completed Mechanical Oil skimmer – Repair and service work Work completed DEWATS 3 4. 5 E-Toilets Kam –avida vehicles KSSIDC
Scum Removal work at ABR STP -9 KLD Floor re-welded work at E-toilets Servicing work of Flow meter at 300 KLD CSTP
Replacement of gasket – KA 51 6287 Replacement of gasket – KA 51 0225 Repair & service – oil skimmer at KSSIDC
PROPOSED LAND TO BE ACQUIRED FOR JN IMPROVEMENT (survey done by TTIC (2007)) o YOKOGAWA JUNCTION o IFIM – 120 SQM o INFOSYS MLCP – 100 SQM o VELANKANI JUNCTION o VELANKANI – 64 SQM o KPTCL – 45 SQM o BHEL JUNCTION o o o BHEL (Erkadi Side) – 238 SQM BHEL (Equinox Side) – 236 SQM 3 M (Erkadi Side) – 252 SQM OPTO CIRCUIT– 12 SQM ERKADI JUNCTION o ERKADI SYSTEMS– 20 SQM o SIEMENS JUNCTION o EDGE VERVE – 90 SQM o PETROL BUNK JUNCTION o PETROL BUNK – 37 SQM o C DOT – 25 SQM o RS JUNCTION o o o RS ELECTRONICS – 71 SQM CELSTREAM – 68 SQM ITI – 90 SQM INTERPLEX – 74 SQM OTTERA JUNCTION o TIMKEN – 78 SQM o ELCITA FOOTPATH – 91 SQM
TENDERS ANVIL INFRASTRUCTURE WORKS ◦ RCC Drain & Footpath (West Avenue 2) Velankani Drive – 175 Lakhs ◦ RCC Drain & Footpath (West Avenue 4) IFIM Side – 39 Lakhs ◦ RCC Drain & Footpath West Avenue 3 (KPTCL Junction to Yokogawa Junction both sides) – 168 Lakhs ◦ RCC Drain & Footpath (West Avenue 9) INTERPLEX SIDE – 75 Lakhs ◦ Asphalting - West Avenue -10 (Coffee day Jn to Fire Station Jn) – 27. 5 Lakhs ◦ Concrete Road - Fire Station Inside roads – 15 Lakhs ◦ MS Railing (West Avenue 9) Both Side – 72 lakhs ◦ MS Railing (West Avenue 6) Both Side – 62 Lakhs ◦ Providing and laying asphalt along East Avenue 3 – 43 Lakhs ◦ Construction of Median along East Avenue 3 – 35 Lakhs
TENDERS ANVIL ELECTRICAL WORKS ◦ The 7 –Way RMU shifting in West Avenue-3 ( Near Timken) – 20 Lakhs ◦ Over Head line converting to UG cable in West Avenue-10 ( Canara Bank to Fire station) – 70 Lakhs ◦ New Compact RMU to be installed in West Lane-10 ( Near Bank of India) - 31 Lakhs
TENDERS ANVIL SUTAINABILITY WORKS ◦ ◦ ◦ DG set for SWM facility– 6 Lakhs Baling machine for SWM facility – 5 Lakhs SWM vehicle for collecting food waste (TATA 407) - 10 Lakhs Blower repair and Diffusers - 2 Lakhs DO Sensor – 50 Lakhs Online monitoring system – 50 Lakhs
TOWN PLANNING KHATHA CERTIFICATES, BUILDING LICENSE , COMMENCEMENT CERTIFICATES AND OCCUPANCY CERTIFICATES ISSUED SINCE 2013 - 2014 ONWARDS Details FY 2013 FY 2016 FY 2018 -19 (As FY 2014 -15 FY 2015 -16 FY 2017 -18 14 17 on 30. 03. 2019 FY 2019 -20 (As on 05. 07. 2019 ) Khatha 6 18 12 11 11 28 5 Building License 2 13 25 35 32 40 14 Commencement Certificate 1 4 7 17 9 11 3 Occupancy Certificate 1 Nil 6 14 24 24 7
Inspection on Waste and Water Management at Industries for Issue of Trade License. ◦ ◦ ◦ ◦ Velankani Information Systems Ltd – Oterra Hotel Velankani Information Systems Ltd – 46 Ounce Juice Maker Daily Dose - M. R. Shanthakumar Building Kumaon Entertainment & Hospitalities Pvt Ltd. , Yum Restaurant - KFC Celsa Hotels Pvt Ltd - Lemon Tree Zone by the Park - Shreetronics building
ELCITA SWM presentation at NGT meeting Visit of 20 health inspectors from State Institute of Urban Development (SIUD), ATI Campus Visit from DMA office.
Clean Air for ELCITA. – Received the report
Broken Syntex drums used for reject waste at SWM plant Cigarette bin installed in front of Gill instruments
Statistics : Description No of companies Qty of waste No of people ELCITA SWM 110 9. 4 Tons 36 Nursery No of saplings distributed Saplings acquired last month Saplings at the nursery ELCITA Nursery 3828 1350 3360
WATER MANAGEMENT � � Proposal of increase the rate of BWSSB water Change of water billing cycle of ELCITA Current billing cycle Recommended billing cycle 1 st to last date of the month From 5 th of every month to 4 th of next month • Note: This change is to align to the BWSSB billing cycle
Security and Traffic Related � Joint mock drill by CISF Ecity, CISF Infosys and Garuda Force conducted on 29 June 2019 in Infosys M&P Campus � Installation of 16 Signals completed, 6 Signals operating on Dynamic Mode using Google Maps. � 3 Nos passenger lifts functional at Skywalk across Hosur Road since 04 July 2019 � FAE public shared Elecric two wheelers inducted in ECity. � 2 Nos Hero Splendor for Traffic Patrol have been delivered
Security and Traffic Related � Yulu Statistics June 2019 Yulu Miracle Usage No of Trips Total Users Distance Covered Carbon Reduced (gms) 18066 6952 198643. 46 19864342
THANK YOU
- Slides: 25