ELCITA UPDATE April 2017 Smart City Project Initiatives

  • Slides: 33
Download presentation
ELCITA UPDATE April 2017

ELCITA UPDATE April 2017

Smart City Project Initiatives for Test bed M/s Velankani (By Design) have provided 50

Smart City Project Initiatives for Test bed M/s Velankani (By Design) have provided 50 Nos of 5 MP Cameras. 14 have been installed & the balance installation is in progress. 4

Smart City Project Initiatives for Test bed 58 Nos of Modified Street light poles

Smart City Project Initiatives for Test bed 58 Nos of Modified Street light poles have been erected on Infosys Avenue & Pump house road. 4

Smart City Project Initiatives for Test bed 2 more Smart Water Meters has been

Smart City Project Initiatives for Test bed 2 more Smart Water Meters has been supplied by M/s GAIA integrated with TCL network. 4

Smart City Project Initiatives for Test bed Environment Sensor Monitoring : Air Quality Temperature

Smart City Project Initiatives for Test bed Environment Sensor Monitoring : Air Quality Temperature Humidity Ambient Light Sound CO 2 NO 2 (PAQS)Personal Air Quality Systems Pvt Ltd 4

Smart City Project Initiatives for Test bed � � � M/s Tejas Network have

Smart City Project Initiatives for Test bed � � � M/s Tejas Network have provided Network design for the Pilot ring main from ELCITA office Via Lord Plaza, Paramount, BHEL & back. They are providing GPON switches for all the Camera poles. M/s Multiproe have started the Installation of Video wall at our command Centre. M/s Wipro Ltd are the integrated partner for Smart City Interface. 4

Smart City Project Initiatives for Test bed � � M/s P Park E have

Smart City Project Initiatives for Test bed � � M/s P Park E have supplied 20 Nos parking sensors through LORA network & installation work is in progress. TCL have Supplied one LED street light fixture integrated with LORA Network. Configuration of other applications is in progress apart from Switching On & Off. � 4

LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase

LOCATION MAP FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to

PROPOSAL FOR RELOCATING SKYWALK FROM HP to ELECTRONICS CITY SIGNAL (from West Phase to East Phase)

PROPOSED 400 KLD STP at KSSIDC COMPLEX

PROPOSED 400 KLD STP at KSSIDC COMPLEX

Estate Management 1. Modification of existing street light poles with LED lights, Splitters, Camera,

Estate Management 1. Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc � � West Avenue 1 7 8 9 –Infosys avenue – Wipro Neeladri Road – Pump house Road – Petrol Bunk Road 2. E – Toilets 3. Estate survey ◦ Software Training work in progress � 20 e-toilets Installed & Operational 4

Footpath – Completed East Avenue 1 (TCS Road) 12 East lane 1(Hical Road)

Footpath – Completed East Avenue 1 (TCS Road) 12 East lane 1(Hical Road)

Footpath & Drain Works – Under Progress West Avenue-9 (Petrol Bunk Road) - Completed

Footpath & Drain Works – Under Progress West Avenue-9 (Petrol Bunk Road) - Completed 13 West Avenue-8 (Police Station Side)

Road Works – Under progress Wet Mix Laying – East Avenue 1

Road Works – Under progress Wet Mix Laying – East Avenue 1

Culvert Works – Completed RCC Culvert Opp Namtech – West lane 1 RCC Culvert

Culvert Works – Completed RCC Culvert Opp Namtech – West lane 1 RCC Culvert opp SYSCON West Avenue 8

Footpath Works – Under Progress RCC drain (XIME)– East Avenue 2 RCC drain (Siemens)–

Footpath Works – Under Progress RCC drain (XIME)– East Avenue 2 RCC drain (Siemens)– West Avenue 1

Fabrication Work– Completed Providing SS Bar screen at Equalization Tank (300 KLD STP) Barbed

Fabrication Work– Completed Providing SS Bar screen at Equalization Tank (300 KLD STP) Barbed Wire Fencing – East Avenue 2

Footpath & Drain Works – Under Progress RCC Slab (West lane 1) 18 Kerbstone

Footpath & Drain Works – Under Progress RCC Slab (West lane 1) 18 Kerbstone Footpath using Old (Pump House)

Drain & Compound wall Works – Under progress Drain work– West Lane 12 (Arvind

Drain & Compound wall Works – Under progress Drain work– West Lane 12 (Arvind Mills Road) Compound Wall– Pump House

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (Below Fly

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (Below Fly over East Phase) 3 KL Capacity UG Sump for EToilet (Edizi Tools)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (HP Avenue)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (HP Avenue) 3 KL Capacity UG Sump for EToilet (BWSSB)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (We school)

Sump Works – Under Progress 3 KL Capacity UG Sump for EToilet (We school) 3 KL Capacity UG Sump for EToilet (Tech Mahindra)

Road Marking – Completed Road Side lane, Speed Hump & Pedestrian Marking (Electronics City

Road Marking – Completed Road Side lane, Speed Hump & Pedestrian Marking (Electronics City West & East Phase)

Direction Signage Board– Completed

Direction Signage Board– Completed

Fabrication Work– Under Progress Providing Chequer Sheet Cover to Avoid Smell going to the

Fabrication Work– Under Progress Providing Chequer Sheet Cover to Avoid Smell going to the nearby companies

7 KLD STP– Under Progress Construction of 7 KLD STP ESBR Technology at ELCITA

7 KLD STP– Under Progress Construction of 7 KLD STP ESBR Technology at ELCITA office

Improvement in quantity of dry waste sold after Conveyor. Jan - 32 tons sold

Improvement in quantity of dry waste sold after Conveyor. Jan - 32 tons sold Feb - 37 tons sold March - 41 Tons dry waste sold

Compost Santhe organised by Go. K � Was part of 40 participants at Vidhana

Compost Santhe organised by Go. K � Was part of 40 participants at Vidhana Soudha � Stall was visited by the chief minister. � Sold compost and got contacts for compost sales.

Earth day initiatives • Seized single use disposables at E-city were used to create

Earth day initiatives • Seized single use disposables at E-city were used to create awareness around E-city for non usage. • Tree plantation at Maragondanahalli lake and also installation of solar lights.

Estate Management Contract Awarded • • Proposed construction of Drains, laying of Pavers, Kerb

Estate Management Contract Awarded • • Proposed construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs from Xime Junction to Tata power rear gate & TCS Gate no 2 to Edizi Tools junction (East Avenue 2 & 4), East Phase Providing and laying of Asphalting using 60/70 grade bitumen • from Edizi Tools to TCS gate no 3 via Y-Junction, (East Avenue 1& 4). East Phase • Along Café Corner & JP IT Park Road 30

Estate Management Contract Published � � Modification of existing street light poles with LED

Estate Management Contract Published � � Modification of existing street light poles with LED lights, Splitters, Camera, Advertisement Board, etc Providing House Keeping Services to ELCITA within e-city Industrial Township Area. 31

Estate Management Contracts on Anvil • • Construction of Concrete Drains, laying of Pavers,

Estate Management Contracts on Anvil • • Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs • Erkadi System to Arvind Mills (West Phase) Construction of 400 KLD STP in KSSIDC Land, West Phase. Construction of 500 KLD STP in KIADB Land, East Phase. Replacing the Existing RMU with New Compact RMU near M/s BHEL Ltd. 32