ECE 476 Power System Analysis Lecture 6 Power
- Slides: 31
ECE 476 Power System Analysis Lecture 6: Power System Operations, Transmission Line Parameters Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign overbye@illinois. edu
Announcements • Please read Chapter 4 • Quiz today on HW 2 • HW 3 is 4. 8, 4. 10, 4. 18, 4. 23 • • • It does not need to be turned in, but will be covered by an in-class quiz on Sept 17 Positive sequence is same as per phase; it will be covered in Chapter 8 Use Table A. 4 values to determine the Geometric Mean Radius of the wires (i. e. , the ninth column).
Generator Costs • There are many fixed and variable costs associated with power system operation. • The major variable cost is associated with generation. • Cost to generate a MWh can vary widely. • For some types of units (such as hydro and nuclear) it is difficult to quantify. • For thermal units it is much easier. These costs will be discussed later in the course. 2
Economic Dispatch • Economic dispatch (ED) determines the least cost dispatch of generation for an area. • For a lossless system, the ED occurs when all the generators have equal marginal costs. IC 1(PG, 1) = IC 2(PG, 2) = … = ICm(PG, m) 3
Power Transactions • Power transactions are contracts between areas to do power transactions. • Contracts can be for any amount of time at any price for any amount of power. • Scheduled power transactions are implemented by modifying the area ACE: ACE = Pactual, tie-flow - Psched 4
100 MW Transaction Net tie-line flow is now 100 MW Scheduled 100 MW Transaction from Left to Right 5
Security Constrained ED • Transmission constraints often limit system economics. • Such limits required a constrained dispatch in order to maintain system security. • In three bus case the generation at bus 3 must be constrained to avoid overloading the line from bus 2 to bus 3. 6
Security Constrained Dispatch is no longer optimal due to need to keep line from bus 2 to bus 3 from overloading 7
Multi-Area Operation • If Areas have direct interconnections, then they may directly transact up to the capacity of their tielines. • Actual power flows through the entire network according to the impedance of the transmission lines. • Flow through other areas is known as “parallel path” or “loop flows. ” 8
Seven Bus Case: One-line System has three areas Area left has one bus Area top has five buses Area right has one bus 9
Seven Bus Case: Area View Actual flow between areas System has 40 MW of “Loop Flow” Scheduled flow Loop flow can result in higher losses 10
Seven Bus - Loop Flow? Note that Top’s Losses have increased from 7. 09 MW to 9. 44 MW 100 MW Transaction between Left and Right Transaction has actually decreased the loop flow 11
Pricing Electricity • Cost to supply electricity to bus is called the locational marginal price (LMP) • Presently some electric makets post LMPs on the web • In an ideal electricity market with no transmission limitations the LMPs are equal • Transmission constraints can segment a market, resulting in differing LMP • Determination of LMPs requires the solution on an Optimal Power Flow (OPF) 12
3 BUS LMPS - OVERLOAD IGNORED Gen 2’s cost is $12 per MWh Gen 1’s cost is $10 per MWh Line from Bus 1 to Bus 3 is over-loaded; all buses have same marginal cost 13
LINE OVERLOAD ENFORCED Line from 1 to 3 is no longer overloaded, but now the marginal cost of electricity at 3 is $14 / MWh 14
MISO LMPs 9/5/15 at 8: 45 AM https: //www. misoenergy. org/LMPContour. Map/MISO_All. html
Development of Line Models • Goals of this section are 1) develop a simple model for transmission lines 2) gain an intuitive feel for how the geometry of the transmission line affects the model parameters
Primary Methods for Power Transfer • The most common methods for transfer of electric power are – – – Overhead ac Underground ac Overhead dc Underground dc other
345 k. V+ Transmission Growth at a Glance 18
345 k. V+ Transmission Growth at a Glance 19
345 k. V+ Transmission Growth at a Glance 20
345 k. V+ Transmission Growth at a Glance 21
345 k. V+ Transmission Growth at a Glance 22
Grid Weakness
Ameren Illinois Rivers 345 k. V Project • Ameren is in the process of building a number of 345 k. V transmission lines across Central Illinois. • Locally this includes a line between Sidney and Rising in Champaign County http: //www. ilriverstransmission. com/maps
Sidney to Bunsonville 345 k. V
Sidney to Kansas (IL) 345
Sidney to Rising 345 k. V
Sidney to Rising 345 k. V
Champaign-Urbana Part of Grid
Line Conductors • Typical transmission lines use multi-strand conductors • ACSR (aluminum conductor steel reinforced) conductors are most common. A typical Al. to St. ratio is about 4 to 1.
- Symmetrical components in power system pdf
- Ece 476
- Power systems
- Ece 476
- Ece 476
- Ece 476
- Ece 476
- Ece 476
- Ece 476
- Ece 476
- Power system analysis lecture notes
- 01:640:244 lecture notes - lecture 15: plat, idah, farad
- Power system dynamics and stability lecture notes
- Power system dynamics and stability lecture notes
- Roman (500 b.c.– a.d. 476)
- Cs 476
- What are compatible numbers
- 476 a 1453
- Solange ferradura
- Paminklas
- 476 a 1453
- That "rome fell in a.d. 476" means
- When was the roman empire at its peak
- Ccip ccrp
- Hasil dari 476:17+41×12
- 476 bus times
- R 476
- Ie 476
- Ntp 476
- I.sz. 476
- 476 ce
- Active power reactive power apparent power