East Hall under construction 1962 East Area Renovation

  • Slides: 5
Download presentation
East Hall under construction - 1962 East Area Renovation Supply of control rooms b.

East Hall under construction - 1962 East Area Renovation Supply of control rooms b. 157 Aboubakr Ebn Rahmoun / EN-EA, 07 -05 -2019 East Area Renovation

Integration: IT, T 09 & T 10 T 11 8, 6 x 4, 5

Integration: IT, T 09 & T 10 T 11 8, 6 x 4, 5 x 2. 5 m With separation T 10 6, 2 x 6 x 2. 5 m A. Ebn Rahmoun, 07 -05 -2019 IT 3, 7 x 3, 23 x 2. 5 m EN-EA East Area Equipment Review T 09 8 x 4 x 2. 5 m 2

Supply • Planning for installation Task Name Install new control rooms Baseline Duration Start

Supply • Planning for installation Task Name Install new control rooms Baseline Duration Start 3 wks Fri 10/07/20 • Process • Quotation from STIC: 150 k. CHF >200 KCHF, DR Start specification September 2019 (4 month) Comments and validation (HSE etc. ) (2 month) A. Ebn Rahmoun, 07 -05 -2019 Materials/planning preparation of factory (3 month) Backup Access, authorization etc. (1 month) EN-EA East Area Equipment Review delivery and installation (1 month) 3

Iteration Done • EN-CV • Technical specification and characteristic of the installations • Thermal

Iteration Done • EN-CV • Technical specification and characteristic of the installations • Thermal study need be approved by CV and the maintenance will be supported Next meeting • Users • Thermal loads by control room, (equipments and people) • EN-EL 1. Need to check, comments & approve the electrical installation from the factory 2. Make the specification for the purchase 3. To keep in charge the electrical installation • HSE • Safety aspect, ventilation (air neuf), seismic risks, composition of control rooms conform with IS 41 A. Ebn Rahmoun, 07 -05 -2019 EN-EA East Area Equipment Review 4

Thanks for your attention! East Area Renovation A. Ebn Rahmoun, 07 -052019 EN-EA East

Thanks for your attention! East Area Renovation A. Ebn Rahmoun, 07 -052019 EN-EA East Area Equipment Review 5