East Hall under construction 1962 East Area Renovation

  • Slides: 5
Download presentation
East Hall under construction - 1962 East Area Renovation Project Decabling/Cabling campaign preparation Status

East Hall under construction - 1962 East Area Renovation Project Decabling/Cabling campaign preparation Status 20/04/2018 Erwan Harrouch / EN-EA, 23 -02 -2018

DEC Summary 7000 26 cables need for CLOUD RUN 6000 Will not be removed

DEC Summary 7000 26 cables need for CLOUD RUN 6000 Will not be removed 5000 Require more investigation 4000 3000 Sure to be removed at the beginning of LS 2 2000 1000 0 Result after identification Cables that will need to be removed at the beginning of LS 2 Cables not found but obsolete Cables Not treated Cables to be maintained Cables to be removed after CLOUD RUN in 2019 E. Harrouch, 20 -04 -2018 Project Team #19 2

Cable identifications - Summary • Good level of identification reached in a small time

Cable identifications - Summary • Good level of identification reached in a small time window. The input from the groups is globally very satisfying. • Missing contributions should be integrated to the Share. Point lists in the coming months : • EN-EL : Will be updated according to the renovation planned, • BE-ICS : Almost complete (SUSI Cables, …) ~40 cables to be treated • BE-CO (Partially) : Almost completed, identification in EBCR in progress • BE-BI (Partially) : ~300 cables to be treated • EN-CV, IT-CS : Not done yet Identification origine CES : Trouvé- en service- non impacté par le projet de rénovation DOV : Trouvé- obsolete-deconnecté-violet PT : Pas trouvé (A deposer si trouvé) OLS : Trouvé - Obsolète à partir du LS 2 - Scotché en violet NCLD : Trouvé - Nécessaire pour le run de CLOUD Cable restants : Non traités par les utilisateurs An nu le Au tre TE s -E PC IT -C S IR RA D HS ERP EN -E L EN -C V BE -IC S BE -C O BE -B I EN -S TI EN -E A 120% 100% 80% 60% 40% 20% 0% CES DOV PT OLS NCLD Câbles restants E. Harrouch, 20 -04 -2018 Project Team #19 3

DIC Summary Number Caller Organic Unit RQF 0844633 Nicolas Broca BE-ICS-AS RQF 0863828 Jose

DIC Summary Number Caller Organic Unit RQF 0844633 Nicolas Broca BE-ICS-AS RQF 0863828 Jose Luis Gomez Costa RQF 0954940 Denis Raffourt RQF 0959969 Jerome Lendaro RQF 0959986 Jerome Lendaro RQF 0965683 Adrian Miranda Fontan RQF 0967931 Denis Raffourt RQF 0971375 Stephane Burger RQF 0971485 Erwan Harrouch RQF 0971704 Jeremy Rosset-Lanchet RQF 0971821 Philippe Carriere RQF 0979073 Boris Morand RQF 0981360 Boris Morand Complex PS COMPLEX EAST Area PS COMPLEX TE-EPC-CCE EAST Area PS COMPLEX BE-ICS-AS EAST Area PS COMPLEX EN-SMM-MRO EAST Area PS COMPLEX TE-MPE-MI EAST Area PS COMPLEX BE-ICS-AS EAST Area BE-BI-PM PS COMPLEX EAST Area EN-EA-EC PS COMPLEX EAST Area HSE-RP-IL PS COMPLEX EAST Area BE-BI-EA PS COMPLEX EAST Area BE-ICS-AC PS COMPLEX EAST Area Final deadline period Final plan project Final plan activity Created Number cables Total length LS 2 East Area - Renovation - Fixed Gas-ODH Det. - SGGAZ- 00144 -MX 62 - B 157 Zone Est - Zone 24 - by new S 10771 26. 09. 2017 16: 06 48 to be estimated 11461 20. 10. 2017 11: 15 63 to be estimated LS 2 RUN 2 Installation-Fire &Evacuation - Zone 24 11286 22. 02. 2018 14: 38 10 to be estimated LS 2 Control and OF cables for the East Area renovation 11262 01. 03. 2018 10: 05 42 to be estimated LS 2 Control and OF cables for the East Area renovation 11262 01. 03. 2018 10: 13 18 to be estimated LS 2 WIC - Deployment of the Magnet Interlock system for the East area 10812 08. 03. 2018 10: 09 120 Around 4000 meters - estimation by client LS 2 Installation-Fire &Evacuation - Zone 24 11286 12. 03. 2018 10: 37 20 1500 - estimation by client LS 2 Secondary beam instrumentation for the East Area renovation 11259 33 3500 LS 2 Gaz system installation for the East Area Renovation 11448 15 -03 -2018 11: 55: 50 15 -03 -2018 13: 41: 55 15 -03 -2018 15: 58: 20 15 -03 -2018 17: 26: 56 26 -03 -2018 14: 07: 54 28 -03 -2018 17: 13: 36 37 2610 60 1000 117 7000 14 7000 30 1050 LS 2 11259 LS 2 East Area Renovation 11287 LS 2 East Area Renovation 11288 • 13 DICs received by EN-EL, • Approx. 650 cables in the DICs on SNOW (~1000 cables are expected), • The project will contact the WPL to validate the following informations : • Ticket created for all the cables needed, • Plan-ID associated to DIC, • Budget allocated to signal cables clearly identified in EVM. E. Harrouch, 20 -04 -2018 Project Team #19 4

Thanks for your attention ! E. Harrouch, 20 -04 -2018 Project Team #19 5