Dynamics 365 for Finance Operations China Mooncake release

  • Slides: 15
Download presentation
Dynamics 365 for Finance & Operations China Mooncake release – April 2019 Shailesh Nikam

Dynamics 365 for Finance & Operations China Mooncake release – April 2019 Shailesh Nikam (shailesn@microsoft. com)

D 365 FO – China Mooncake overview • Data residency (go-local) Geo map •

D 365 FO – China Mooncake overview • Data residency (go-local) Geo map • Release Timeline • Plan of Record • Service integration data flow • Azure dependencies • Feature parity • Lifecycle Services (LCS) • Infrastructure setup • 21 V support system integration • Compliance

D 365 FO – Geo expansion data center map

D 365 FO – Geo expansion data center map

D 365 FO – China Mooncake Plan of Record (POR-1) • Customer onboarding: •

D 365 FO – China Mooncake Plan of Record (POR-1) • Customer onboarding: • Private preview and general availability for go-local is limited to new or existing customers who are willing to start new LCS implementation project. • Migration of projects, BPM, assets, database from other regions to go-local is NOT supported for Preview or GA. • Dynamics. cn domain: • Go-local service will have China specific URL. Root “dynamics. cn” domain will be shared by all BAG teams and each team will create their subdomain under the same. • Dependency services • All dependent services containing customer data and integration will be setup within China go-local data centers. • Services which doesn't store any customer data and clean system diagnostics may reside in Hong Kong data center or US. (subject to GRC review) • Customer managed integration services (TFS, Sharepoint, Onedrive) • Customer's responsibility to setup integration points within go-local. We can’t restrict these settings in product however will provide guidance in documentation. • LCS project level customer owned TFS on-prem to be used for Dev ALM, deployable package management • Customer owned Share. Point/ One. Drive account for document storage related to LCS project

D 365 FO – China Mooncake Plan of Record (POR-2) • Region selection: •

D 365 FO – China Mooncake Plan of Record (POR-2) • Region selection: • Customers will NOT be presented with region selection experience during LCS login in China (region selection only available in Public go-local) • Service fabric vs Iaa. S • China preview setup will use Iaa. S based deployments. SF based deployment will NOT be available by GA • Version compatibility: • App 10. x latest version at time of preview/ GA will be made available. • Data centers: • As per capacity availability, all services will be setup within North 2 (primary) and East 2 (secondary) data centers • Products supported: • We will only support Operations and Retail for China GA. Talent, NAV are out of scope for this launch.

D 365 FO – China Mooncake Data Flow

D 365 FO – China Mooncake Data Flow

D 365 FO – China Mooncake Azure Dependencies

D 365 FO – China Mooncake Azure Dependencies

D 365 FO – China Mooncake Feature non-availability No. Unavailable feature 1 Development, build,

D 365 FO – China Mooncake Feature non-availability No. Unavailable feature 1 Development, build, and testing of customizations will be unavailable in Azure Dev. Ops in Mainland China; however, use of Currently no ETA Azure Dev. Ops on-premises will be available in China in April 2019. Also, Azure Dev. Ops can be used in other regions. 2 Retail cloud scale unit functionality will be unavailable; however, the Retail store scale unit and Retail Modern Store app will be available in April 2019. Vendor management and collaboration will be unavailable due to Azure Active Directory limitations. Certain mobile apps (e. g. , Warehousing and Project time entry mobile workspace) will be unavailable due to the Google Play Store not being available in China; however, alternatives are being considered. The mobile platform listed here will not be available because certain App store dependencies are unavailable in China. October 2019 The following Microsoft Dynamics Lifecycle Services (LCS) features will have a different experience or will be unavailable due to the dependencies that are not available: • APQC Business process model (BPM) Library will be unavailable; however, base BPM functionality will be available for custom models in April 2019. • Electronic reporting (ER) assets Electronic Reporting (ER) assetswill not be available automatically, but will have to be manually uploaded from the LCS global asset library. • Code upgrade will be unavailable for upgrades from Dynamics AX 2012. • Issue text search for KB articles will not be available; however, the KB list will be available in April 2019. • Service and Support requests will be available through a portal connected to 21 Vianet but may not be available through LCS. • Translation service will not be available. Embedded Power. Apps and connectivity to Microsoft Power. Apps and Microsoft Flow will be unavailable. Data integration by using Common Data Service will be unavailable. The following features will not be available due to certain current Azure Active Directory limitations in China: • The System administration > Setup > B 2 B Invitation configuration form will not be available due to B 2 B being unavailable in Azure Active Directory in China. See https: //docs. microsoft. com/en-us/azure/active-directory/b 2 b/what-is-b 2 b for details. Currently no ETA • Conditional access is an Azure Active Directory feature that is available for the Azure Active Directory Premium 2 SKU, which is unavailable in China.   Currently no ETA 3 4 5 6 7 8 9 Estimated Availability Timeline for Unavailable Features (ETA)5 Currently no ETA H 2 CY 2019 Currently no ETA

D 365 FO – China Mooncake Lifecycle Services Portal Link

D 365 FO – China Mooncake Lifecycle Services Portal Link

D 365 FO – China Mooncake Infrastructure "Core Services" estimated infrastructure requirement (for China

D 365 FO – China Mooncake Infrastructure "Core Services" estimated infrastructure requirement (for China ONLY): Below table shows approximate costing for setting up local services for LCS, DSU, CLX, Telemetry spread across two deployments (TEST, PROD). Category Description Total units SQL database V 12 S 0 -2 & P 0 -6 types of database Storage account Block blob (GB) Compute services A 3/ A 4 cloud service VMs (avg 6 cores) 51 195 44 "Per Customer" estimated infrastructure requirement: Below table shows infra needs for each customer default deployment. Category Description Total units Compute services DV 2 (D 12, D 13) series PROD-6, Sandbox-3, Dev. Test-1 = 10 SQL database V 12 P 2 PROD-3, DR-3, Sandbox-3 = 9

D 365 FO – China Mooncake Incident Management

D 365 FO – China Mooncake Incident Management

D 365 FO – China Mooncake 21 V Support integration Link

D 365 FO – China Mooncake 21 V Support integration Link

D 365 FO – China Mooncake 21 V Azul support case

D 365 FO – China Mooncake 21 V Azul support case

D 365 FO – China Mooncake Compliance • GB Certifications • GB 18030 -

D 365 FO – China Mooncake Compliance • GB Certifications • GB 18030 - Chinese Char Set (F&O, LCS, Retail) • GB/T 24589 - Accounting schema (F&O, LCS, Retail) • GDPR • Data streams – All telemetry streams are located here • Tagging – All in-scope streams are tagged as per GDPR tagging guidance. • DSR jobs – • All DSR jobs are configured to process DSR requests. • These requests can be processed

D 365 FO – China Mooncake Links • LCS: https: //lcs. dynamics. cn/ •

D 365 FO – China Mooncake Links • LCS: https: //lcs. dynamics. cn/ • F&O: https: //<customertenant>. operations. dynamics. cn/ • Docs wiki: • F&O - https: //docs. microsoft. com/en-us/dynamics 365/unified-operations/fin -and-ops/ • LCS - https: //docs. microsoft. com/en-us/dynamics 365/unified-operations/dev -itpro/lifecycle-services/lcs-user-guide • 21 V blue cloud: https: //en. 21 vbluecloud. com/