DSI – Ductile Iron Micropiles International Society for Micropiles London, May 2009 Florian Stützel, DSI-TS
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Introduction l Driven tube l Ductile cast iron
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Production l Centrifugal casting
Production l Heat treatment l Transformation grey ductile cast iron
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Installation Drive & grout = skin friction Dry driven = end bearing Pile head Soft soil Pile tube Soft soil Coupler Medium dense gravel Dense sand Loose sand concrete Pile shoe Rock
Installation - Endbearing piles l Usually non-grouted l Driven until a certain set-criteria is fulfilled (e. g. progress < 20 mm / minute) l If grouted piles are driven to that set, then the pile is basically an endbearing pile with additional load bearing capacity from skin friction
Installation - Endbearing piles Foot for end bearing piles
Installation - Endbearing piles
Installation Friction piles l Simultaneously driven & grouted l Driven into a layer of “good” soil l Steady control and monitoring of driving progress required
Friction piles
Installation - Friction piles
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Load capacity l End bearing piles are driven to set e. g. progress less than 20 mm / minute l Skin friction piles can be stopped before full set
Load capacity - Friction piles 1 st information: soil-expertise
Load capacity - Friction piles 2 nd information: penetration test with DPH
Load capacity - Friction piles 3 rd information: Actual driving record
Load capacity - Friction piles Comparison
Load capacity - Friction piles l Driving stopped after 6 m protrusion in a layer, where the driving time exceeded 30 secs / 1 m l 6 m x 0. 63 m²/m x 150 k. N/m² = 570 k. N
Load capacity - Friction piles Pile test
Load capacity - Friction piles Pile test Vertical displacement [mm] load / time load / displacement curve Load [k. N]
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Agenda l Introduction l Production l Installation l Load capacity l Summary l Video
Summary l Installation by excavator l Suitable for restricted area l No break down of pile head l Installation into difficult ground condition l No wastage of pile section l Easy & fast
DSI – Ductile Iron Micropiles International Society for Micropiles London, May 2009 Florian Stützel, DSI-TS